If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465103407000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.988543,"lon":-115.360172,"icon":""}]} |
Location: 00/07-34-046-10W5/0 | |
Location Alias: 00/07-34-46-10 W5M | |
Location Alias 2: 00/07-34-046-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 10 | |
Section: 34 | |
County/Municipality: Brazeau County | |
Well Name: TAC HZ PEMBINA 7-34-46-10 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0465535 | |
License Date: 2014-03-06 | |
License Status: Amended | |
Spud Date: 2014-03-28 | |
Final Drill Date: 2014-04-15 | |
Well Total Depth: 4226.00 m | |
Surface Hole Latitude: 52.988543 | |
Surface Hole Longitude: -115.360172 |
Date | Event |
---|---|
2014-03-06 | Obtained License |
2014-03-30 | Surface Casing Operation Performed |
2014-04-01 | Direction Drilling Operation Performed - Deviate |
2014-04-04 | Direction Drilling Operation Performed - Horizontal |
2014-04-15 | Finished Drilling |
2014-04-15 | Well Mode changed to Drilled and Cased |
2014-04-18 | Production Casing Operation Performed |
2014-04-18 | Rig Released |
2014-04-22 | Well Log Performed |
2014-04-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-21 | Well Began Production |
2014-05-21 | Well Fluid changed to Crude Oil |
2014-05-21 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2014-04-01 | 1518.10 | Deviate (5 - 79 degrees) |
2014-04-04 | 1962.40 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-04-29 | Multi-Stage Fracture | 4209.70 | 4209.80 | 0 |
2014-05-02 | Multi-Stage Fracture | 3575.90 | 3576.00 | 0 |
2014-05-02 | Multi-Stage Fracture | 3515.80 | 3515.90 | 0 |
2014-05-02 | Multi-Stage Fracture | 3442.60 | 3442.70 | 0 |
2014-05-02 | Multi-Stage Fracture | 3369.40 | 3369.50 | 0 |
2014-05-02 | Multi-Stage Fracture | 3296.30 | 3296.40 | 0 |
2014-05-02 | Multi-Stage Fracture | 3222.20 | 3222.30 | 0 |
2014-05-02 | Multi-Stage Fracture | 3148.20 | 3148.30 | 0 |
2014-05-02 | Multi-Stage Fracture | 3074.60 | 3074.70 | 0 |
2014-05-02 | Multi-Stage Fracture | 3000.70 | 3000.80 | 0 |
2014-05-02 | Multi-Stage Fracture | 2927.10 | 2927.20 | 0 |
2014-04-29 | Multi-Stage Fracture | 4148.80 | 4148.90 | 0 |
2014-05-02 | Multi-Stage Fracture | 2867.40 | 2867.50 | 0 |
2014-05-03 | Multi-Stage Fracture | 2794.20 | 2794.30 | 0 |
2014-05-03 | Multi-Stage Fracture | 2721.10 | 2721.20 | 0 |
2014-05-03 | Multi-Stage Fracture | 2648.40 | 2648.50 | 0 |
2014-05-03 | Multi-Stage Fracture | 2576.10 | 2576.20 | 0 |
2014-05-03 | Multi-Stage Fracture | 2504.30 | 2504.40 | 0 |
2014-05-03 | Multi-Stage Fracture | 2432.40 | 2432.50 | 0 |
2014-05-03 | Multi-Stage Fracture | 2360.60 | 2360.70 | 0 |
2014-05-03 | Multi-Stage Fracture | 2288.70 | 2288.80 | 0 |
2014-05-03 | Multi-Stage Fracture | 2217.00 | 2217.10 | 0 |
2014-04-29 | Multi-Stage Fracture | 4076.70 | 4076.80 | 0 |
2014-05-03 | Multi-Stage Fracture | 2145.10 | 2145.20 | 0 |
2014-05-03 | Multi-Stage Fracture | 2073.20 | 2073.30 | 0 |
2014-04-29 | Multi-Stage Fracture | 4016.70 | 4017.00 | 0 |
2014-04-29 | Multi-Stage Fracture | 3943.00 | 3943.10 | 0 |
2014-04-29 | Multi-Stage Fracture | 3868.90 | 3869.00 | 0 |
2014-05-02 | Multi-Stage Fracture | 3795.70 | 3795.80 | 0 |
2014-05-02 | Multi-Stage Fracture | 3722.60 | 3722.70 | 0 |
2014-05-02 | Multi-Stage Fracture | 3649.00 | 3649.10 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-29 | 2014-05-03 | 1,857 | 5,715 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.8809 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.6117 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.2312 | N/A | ||
DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0172 | N/A | |
Water | 7732-18-5 | 100 | 0.0179 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0849 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0966 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0985 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0968 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1114 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0966 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0974 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0985 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 4.1091 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.102 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-04-18 | 2014-04-27 | Groundwater - Non-saline less than or equal to 150m deep | 2560 |
2014-04-22 | 2014-05-02 | Groundwater - Non-saline less than or equal to 150m deep | 2191 |
2014-04-19 | 2014-04-24 | Groundwater - Non-saline less than or equal to 150m deep | 1355 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 5153 | 0.0 | 0.0 | 0.0 |
2015 | 8598 | 0.0 | 0.0 | 0.0 |
2016 | 8366 | 0.0 | 0.0 | 0.0 |
2017 | 8634 | 0.0 | 0.0 | 0.0 |
2018 | 8552 | 0.0 | 0.0 | 0.0 |
2019 | 8001 | 0.0 | 0.0 | 0.0 |
2020 | 2116 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-04-18 | No Incident Encountered | 0.00 | 0.00 |
2014-05-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]