X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465133010000

Well Details

Well ID: 0465133010000
Loading map...
Location: 00/10-30-046-13W5/0
Location Alias: 00/10-30-46-13 W5M
Location Alias 2: 00/10-30-046-13 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 13
Section: 30
County/Municipality: Yellowhead County
Well Name: BOULDER BRAZR 10-30-46-13
Operator Name: Boulder Energy Ltd.
License Number: 0113895
License Date: 1985-03-11
License Status: Suspension
Spud Date: 1985-04-18
Final Drill Date: 1985-05-12
Well Total Depth: 2752.00 m
Surface Hole Latitude: 52.999145
Surface Hole Longitude: -115.871111

For data sources see[1][2]

Well History

Date Event
1985-03-11 Obtained License
1985-04-22 Surface Casing Operation Performed
1985-05-12 Finished Drilling
1985-05-12 Well Mode changed to Drilled and Cased
1985-05-13 Drill Stem Test Performed
1985-05-13 Well Log Performed
1985-05-17 Production Casing Operation Performed
1985-05-18 Rig Released
1985-06-30 Perforation Treatment Performed - Fractured
1985-06-30 Perforation Treatment Performed - Jet Perforation
1985-07-22 Well Log Performed
1985-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-23 Plug Back Performed
1985-07-24 Perforation Treatment Performed - Jet Perforation
1985-08-01 Well Began Production
1985-08-01 Well Fluid changed to Crude Oil
1985-08-01 Well Mode changed to Flowing
1985-10-10 Perforation Treatment Performed - Fractured
1985-10-10 Well Log Performed
1986-05-22 Well Fluid changed to Crude Oil
1986-05-22 Well Mode changed to Suspended
1986-09-01 Well Fluid changed to Crude Oil
1986-09-01 Well Mode changed to Flowing
2018-12-01 Well Fluid changed to Crude Oil
2018-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-06-30 Perforation 2691.50 2694.00 13
1985-06-30 Fracture 2691.50 2694.00 0
1985-07-23 Packing Device Capped w/Cement 2677.00 2685.00 0
1985-07-24 Perforation 2363.00 2365.00 13
1985-10-10 Fracture 2363.00 2365.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2494 0.0 0.0 0.0
1986 206 0.0 0.0 0.0
1987 1087 0.0 0.0 0.0
1988 7057 0.0 0.0 0.0
1989 7041 0.0 0.0 0.0
1990 6427 0.0 0.0 0.0
1991 8617 0.0 0.0 0.0
1992 7565 0.0 0.0 0.0
1993 7925 0.0 0.0 0.0
1994 8434 0.0 0.0 0.0
1995 7960 0.0 0.0 0.0
1996 5946 0.0 0.0 0.0
1997 5699 0.0 0.0 0.0
1998 8412 0.0 0.0 0.0
1999 7827 0.0 0.0 0.0
2000 7709 0.0 0.0 0.0
2001 7520 0.0 0.0 0.0
2002 8743 0.0 0.0 0.0
2003 8552 0.0 0.0 0.0
2004 8634 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8495 0.0 0.0 0.0
2008 8712 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 6207 0.0 0.0 0.0
2012 8495 0.0 0.0 0.0
2013 6010 0.0 0.0 0.0
2014 6336 0.0 0.0 0.0
2015 8441 0.0 0.0 0.0
2016 7562 0.0 0.0 0.0

For data sources see[5]

References