X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465143503020

Well Details

Well ID: 0465143503020
Loading map...
Location: 02/03-35-046-14W5/0
Location Alias: 02/03-35-46-14 W5M
Location Alias 2: 02/03-35-046-14 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 14
Section: 35
County/Municipality: Yellowhead County
Well Name: BLDR 1A-33 HZ BRAZR 3-35-46-14
Operator Name: Boulder Energy Ltd.
License Number: 0495233
License Date: 2019-07-24
License Status: Issued
Spud Date: 2019-08-21
Final Drill Date: 2019-08-29
Well Total Depth: 4216.00 m
Surface Hole Latitude: 53.006763
Surface Hole Longitude: -115.965947

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-08-21 Precision Drilling Technology Services Group Inc. 309 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-08-24 1511.00 Deviate (5 - 79 degrees)
2019-08-24 1792.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-09-19 Open Hole/Barefoot Completion 4199.00 4216.00 0
2019-09-19 Multi-Stage Fracture 3731.60 3731.70 0
2019-09-19 Multi-Stage Fracture 3679.30 3679.40 0
2019-09-19 Multi-Stage Fracture 3624.70 3624.80 0
2019-09-19 Multi-Stage Fracture 3573.70 3573.80 0
2019-09-19 Multi-Stage Fracture 3521.90 3522.00 0
2019-09-19 Multi-Stage Fracture 3467.60 3467.70 0
2019-09-19 Multi-Stage Fracture 3403.50 3403.60 0
2019-09-19 Multi-Stage Fracture 3353.10 3353.20 0
2019-09-19 Multi-Stage Fracture 3300.80 3300.90 0
2019-09-19 Multi-Stage Fracture 3249.90 3250.00 0
2019-09-19 Multi-Stage Fracture 4174.40 4174.50 0
2019-09-19 Multi-Stage Fracture 3183.40 3183.50 0
2019-09-19 Multi-Stage Fracture 3118.00 3118.10 0
2019-09-19 Multi-Stage Fracture 3052.50 3052.60 0
2019-09-19 Multi-Stage Fracture 2987.20 2987.30 0
2019-09-19 Multi-Stage Fracture 2913.00 2913.10 0
2019-09-19 Multi-Stage Fracture 2848.10 2848.20 0
2019-09-19 Multi-Stage Fracture 2793.10 2793.20 0
2019-09-19 Multi-Stage Fracture 2739.10 2739.20 0
2019-09-19 Multi-Stage Fracture 2684.60 2684.70 0
2019-09-19 Multi-Stage Fracture 2629.70 2629.80 0
2019-09-19 Multi-Stage Fracture 4104.40 4104.50 0
2019-09-19 Multi-Stage Fracture 2576.20 2576.30 0
2019-09-19 Multi-Stage Fracture 2523.20 2523.30 0
2019-09-19 Multi-Stage Fracture 2469.60 2469.70 0
2019-09-19 Multi-Stage Fracture 2415.50 2415.60 0
2019-09-19 Multi-Stage Fracture 2361.70 2361.80 0
2019-09-19 Multi-Stage Fracture 2309.60 2309.70 0
2019-09-19 Multi-Stage Fracture 2255.40 2255.50 0
2019-09-19 Multi-Stage Fracture 2200.70 2200.80 0
2019-09-19 Multi-Stage Fracture 2147.30 2147.40 0
2019-09-19 Multi-Stage Fracture 2092.90 2093.00 0
2019-09-19 Multi-Stage Fracture 4050.20 4050.30 0
2019-09-19 Multi-Stage Fracture 2038.70 2038.80 0
2019-09-19 Multi-Stage Fracture 1983.90 1984.00 0
2019-09-19 Multi-Stage Fracture 1930.20 1930.30 0
2019-09-19 Multi-Stage Fracture 1876.50 1876.60 0
2019-09-19 Multi-Stage Fracture 1824.60 1824.70 0
2019-09-19 Multi-Stage Fracture 3995.60 3995.70 0
2019-09-19 Multi-Stage Fracture 3941.90 3942.00 0
2019-09-19 Multi-Stage Fracture 3888.60 3888.70 0
2019-09-19 Multi-Stage Fracture 3836.20 3836.30 0
2019-09-19 Multi-Stage Fracture 3785.40 3785.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-09-19 2019-09-19 1,709 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 53.3443 N/A
ClearFRAC. N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 28.965 N/A
ClearFRAC. N002 Schlumberger Energizing Fluid 11305 Trade Secret 100 0 N/A
2-butoxyethanol 111-76-2 100 0.0053 N/A
2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.086 N/A
Acetaldehyde 75-07-0 100 0 N/A
Benzenesulfonic acid. 4-ethenyl-. sodium salt. homopolymer 25704-18-1 100 0.0144 N/A
Butan-1-ol 71-36-3 100 0.0021 N/A
Diatomaceous earth 61790-53-2 100 0.0009 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.2516 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0002 N/A
Methanol (impurity) 67-56-1 100 0 N/A
Nitrogen. liquid form 7727-37-9 100 18.4524 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0.0001 N/A
Polyethoxylated alkanol Trade Secret 100 0.0103 N/A
Polyvinyl acetate. partially hydrolyzed 304443-60-5 100 0.0006 N/A
Propan-2-ol 67-63-0 100 0.1927 N/A
Sodium Chloride 7647-14-5 100 0.0294 N/A
Sodium chloroacetate 3926-62-3 100 0.0001 N/A
Sodium Glycolate (impurity) 2836-32-0 100 0.0025 N/A
Undecanol. branched and linear (impurity) 128973-77-3 100 0.0002 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0061 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-09-05 2019-09-14 Surface Water - Runoff 1610

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2111 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-01 No Incident Encountered 0.00 0.00
2019-09-29 No Incident Encountered 0.00 0.00

For data sources see[9]

References