If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0474132810000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.084826,"lon":-111.840108,"icon":""}]} |
Location: 00/10-28-047-13W4/0 | |
Location Alias: 00/10-28-47-13 W4M | |
Location Alias 2: 00/10-28-047-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 4 | |
Range: 13 | |
Section: 28 | |
County/Municipality: Beaver County | |
Well Name: PINE CLIFF BRUCE 10-28-47-13 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0065986 | |
License Date: 1977-10-04 | |
License Status: Issued | |
Spud Date: 1977-10-10 | |
Final Drill Date: 1977-10-13 | |
Well Total Depth: 879.30 m | |
Surface Hole Latitude: 53.084826 | |
Surface Hole Longitude: -111.840108 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-10-04 | Obtained License |
1977-10-12 | Drill Stem Test Performed |
1977-10-13 | Drill Stem Test Performed |
1977-10-13 | Finished Drilling |
1977-10-13 | Well Mode changed to Drilled and Cased |
1977-10-14 | Drill Stem Test Performed |
1977-10-14 | Production Casing Operation Performed |
1978-08-16 | Perforation Treatment Performed - Jet Perforation |
1978-12-19 | Well Fluid changed to Gas |
1978-12-19 | Well Mode changed to Testing |
1978-12-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-12-20 | Well Fluid changed to Gas |
1978-12-20 | Well Mode changed to Abandoned Zone |
1978-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-08-16 | Perforation | 696.10 | 697.90 | 7 |
1978-08-16 | Perforation | 827.80 | 829.00 | 7 |
1978-12-20 | Packing Device Capped w/Cement | 813.80 | 818.30 | 0 |
1978-12-21 | Acid Treatment | 696.10 | 697.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]