If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0474153111003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.100715,"lon":-112.189677,"icon":""}]} |
Location: 00/11-31-047-15W4/3 | |
Location Alias: 00/11-31-47-15 W4M | |
Location Alias 2: 00/11-31-047-15 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 4 | |
Range: 15 | |
Section: 31 | |
County/Municipality: Beaver County | |
Well Name: POCO BRUCE 11-31-47-15 | |
Operator Name: ConocoPhillips Canada Operations ULC | |
License Number: 0191231 | |
License Date: 1996-09-11 | |
License Status: Re-Entered | |
Spud Date: 1996-10-07 | |
Final Drill Date: 1996-10-11 | |
Well Total Depth: 1002.00 m | |
Surface Hole Latitude: 53.100715 | |
Surface Hole Longitude: -112.189677 |
Date | Event |
---|---|
1996-09-11 | Obtained License |
1996-10-07 | Well Log Performed |
1996-10-08 | Surface Casing Operation Performed |
1996-10-11 | Drill Stem Test Performed |
1996-10-11 | Finished Drilling |
1996-10-11 | Well Log Performed |
1996-10-11 | Well Mode changed to Drilled and Cased |
1996-10-12 | Drill Stem Test Performed |
1996-10-13 | Production Casing Operation Performed |
1996-10-13 | Rig Released |
1996-10-16 | Well Log Performed |
1996-10-18 | Well Log Performed |
1996-10-19 | Perforation Treatment Performed - Jet Perforation |
1996-10-20 | Perforation Treatment Performed - Jet Perforation |
2001-10-11 | Perforation Treatment Performed - Jet Perforation |
2001-10-11 | Well Log Performed |
2004-12-08 | Perforation Treatment Performed - Jet Perforation |
2004-12-09 | Perforation Treatment Performed - Jet Perforation |
2004-12-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-12-12 | Plug Back Performed |
2004-12-13 | Perforation Treatment Performed - Cement Squeeze |
2004-12-13 | Plug Back Performed |
2004-12-15 | Perforation Treatment Performed - Jet Perforation |
2004-12-17 | Well Began Production |
2004-12-17 | Well Fluid changed to Gas |
2004-12-17 | Well Mode changed to Flowing |
2008-01-28 | Well Log Performed |
2009-01-01 | Well Fluid changed to Gas |
2009-01-01 | Well Mode changed to Suspended |
2009-01-28 | Perforation Treatment Performed - Jet Perforation |
2009-06-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-06-24 | Perforation Treatment Performed - Cement Plug |
2009-06-24 | Plug Back Performed |
2009-06-24 | Well Fluid changed to Gas |
2009-06-24 | Well Mode changed to Abandoned Zone |
2009-07-13 | Well Abandoned |
2009-07-13 | Well Fluid changed to Gas |
2009-07-13 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-10-19 | Perforation | 294.50 | 295.10 | 20 |
2004-12-15 | Perforation | 875.50 | 878.50 | 20 |
2009-01-28 | Perforation | 876.00 | 878.00 | 17 |
2009-01-28 | Perforation | 868.00 | 869.00 | 17 |
2009-06-24 | Cement Plug | 730.00 | 893.00 | 0 |
2009-06-24 | Packing Device Capped w/Cement | 280.00 | 288.00 | 0 |
1996-10-19 | Perforation | 296.00 | 296.50 | 20 |
1996-10-20 | Perforation | 918.50 | 920.00 | 20 |
2001-10-11 | Perforation | 294.50 | 296.50 | 13 |
2004-12-08 | Perforation | 294.50 | 296.50 | 20 |
2004-12-09 | Perforation | 918.50 | 920.00 | 20 |
2004-12-12 | Packing Device Capped w/Cement | 906.00 | 914.00 | 0 |
2004-12-13 | Cement Squeeze | 294.50 | 296.50 | 0 |
2004-12-15 | Perforation | 868.00 | 871.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 353 | 0.0 | 0.0 | 0.0 |
2005 | 8256 | 0.0 | 0.0 | 0.0 |
2006 | 5087 | 0.0 | 0.0 | 0.0 |
2007 | 25 | 0.0 | 0.0 | 0.0 |
2008 | 73 | 0.0 | 0.0 | 0.0 |
For data sources see[5]