If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0474193007000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.088574,"lon":-112.779337,"icon":""}]} |
Location: 00/07-30-047-19W4/0 | |
Location Alias: 00/07-30-47-19 W4M | |
Location Alias 2: 00/07-30-047-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 4 | |
Range: 19 | |
Section: 30 | |
County/Municipality: Camrose County | |
Well Name: PINE CLIFF JOARCAM 7-30-47-19 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0412548 | |
License Date: 2009-09-23 | |
License Status: Suspension | |
Spud Date: 2009-11-27 | |
Final Drill Date: 2009-12-05 | |
Well Total Depth: 2205.00 m | |
Surface Hole Latitude: 53.088574 | |
Surface Hole Longitude: -112.779337 |
Date | Event |
---|---|
2009-09-23 | Obtained License |
2009-11-28 | Surface Casing Operation Performed |
2009-11-30 | Direction Drilling Operation Performed - Deviate |
2009-12-01 | Direction Drilling Operation Performed - Horizontal |
2009-12-01 | Well Log Performed |
2009-12-02 | Intermediate Casing Operation Performed |
2009-12-05 | Finished Drilling |
2009-12-05 | Liner Casing Operation Performed |
2009-12-05 | Perforation Treatment Performed - Open-Hole Completion |
2009-12-05 | Perforation Treatment Performed - Slotted Liner or Casing |
2009-12-05 | Well Log Performed |
2009-12-05 | Well Mode changed to Drilled and Cased |
2009-12-06 | Rig Released |
2010-02-16 | Well Began Production |
2010-02-16 | Well Fluid changed to Coalbed Methane-Coals Only |
2010-02-16 | Well Mode changed to Pumping |
2012-04-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2012-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-11-30 | 575.00 | Deviate (5 - 79 degrees) |
2009-12-01 | 1217.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-12-05 | Slotted Liner | 1300.70 | 2112.00 | 0 |
2009-12-05 | Open Hole/Barefoot Completion | 2112.00 | 2205.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7217 | 0.0 | 0.0 | 0.0 |
2011 | 8221 | 0.0 | 0.0 | 0.0 |
2012 | 1447 | 0.0 | 0.0 | 0.0 |
For data sources see[6]