If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0474200112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.027175,"lon":-112.802464,"icon":""}]} |
Location: 00/12-01-047-20W4/0 | |
Location Alias: 00/12-01-47-20 W4M | |
Location Alias 2: 00/12-01-047-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 4 | |
Range: 20 | |
Section: 01 | |
County/Municipality: Camrose | |
Well Name: BAYSEL UNIT NORTH CAMROSE NO. 12-1 | |
Operator Name: Suncor Energy Inc. | |
License Number: 0010238 | |
License Date: 1955-09-26 | |
License Status: RecExempt | |
Spud Date: 1955-09-27 | |
Final Drill Date: 1955-10-07 | |
Well Total Depth: 1013.50 m | |
Surface Hole Latitude: 53.027175 | |
Surface Hole Longitude: -112.802464 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1955-09-26 | Obtained License |
1955-10-06 | Drill Stem Test Performed |
1955-10-07 | Finished Drilling |
1955-10-14 | Well Mode changed to Drilled and Cased |
1956-01-26 | Production Casing Operation Performed |
1956-01-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
1956-01-27 | Perforation Treatment Performed - Bullet Perforation |
1956-05-03 | Perforation Treatment Performed - Visqueeze |
1956-05-14 | Perforation Treatment Performed - Bullet Perforation |
1956-06-02 | Perforation Treatment Performed - Bullet Perforation |
1956-11-09 | Perforation Treatment Performed - Bullet Perforation |
1956-12-02 | Well Began Production |
1956-12-02 | Well Fluid changed to Crude Oil |
1956-12-02 | Well Mode changed to Pumping |
1958-05-29 | Perforation Treatment Performed - Cement Plug |
1958-05-30 | Well Abandoned |
1958-05-30 | Well Fluid changed to Crude Oil |
1958-05-30 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1956-01-27 | Bullet Perforation | 981.50 | 982.70 | 26 |
1956-01-27 | Acid Wash | 981.50 | 982.70 | 0 |
1956-05-03 | Visqueeze | 981.50 | 982.70 | 0 |
1956-05-14 | Bullet Perforation | 983.00 | 983.90 | 13 |
1956-06-02 | Bullet Perforation | 983.00 | 983.90 | 13 |
1956-11-09 | Bullet Perforation | 983.00 | 984.20 | 26 |
1958-05-29 | Cement Plug | 954.00 | 982.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]