If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0474200112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.027175,"lon":-112.802464,"icon":""}]} |
| Location: 00/12-01-047-20W4/0 | |
| Location Alias: 00/12-01-47-20 W4M | |
| Location Alias 2: 00/12-01-047-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 01 | |
| County/Municipality: Camrose | |
| Well Name: BAYSEL UNIT NORTH CAMROSE NO. 12-1 | |
| Operator Name: Suncor Energy Inc. | |
| License Number: 0010238 | |
| License Date: 1955-09-26 | |
| License Status: RecExempt | |
| Spud Date: 1955-09-27 | |
| Final Drill Date: 1955-10-07 | |
| Well Total Depth: 1013.50 m | |
| Surface Hole Latitude: 53.027175 | |
| Surface Hole Longitude: -112.802464 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1955-09-26 | Obtained License |
| 1955-10-06 | Drill Stem Test Performed |
| 1955-10-07 | Finished Drilling |
| 1955-10-14 | Well Mode changed to Drilled and Cased |
| 1956-01-26 | Production Casing Operation Performed |
| 1956-01-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1956-01-27 | Perforation Treatment Performed - Bullet Perforation |
| 1956-05-03 | Perforation Treatment Performed - Visqueeze |
| 1956-05-14 | Perforation Treatment Performed - Bullet Perforation |
| 1956-06-02 | Perforation Treatment Performed - Bullet Perforation |
| 1956-11-09 | Perforation Treatment Performed - Bullet Perforation |
| 1956-12-02 | Well Began Production |
| 1956-12-02 | Well Fluid changed to Crude Oil |
| 1956-12-02 | Well Mode changed to Pumping |
| 1958-05-29 | Perforation Treatment Performed - Cement Plug |
| 1958-05-30 | Well Abandoned |
| 1958-05-30 | Well Fluid changed to Crude Oil |
| 1958-05-30 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1956-01-27 | Bullet Perforation | 981.50 | 982.70 | 26 |
| 1956-01-27 | Acid Wash | 981.50 | 982.70 | 0 |
| 1956-05-03 | Visqueeze | 981.50 | 982.70 | 0 |
| 1956-05-14 | Bullet Perforation | 983.00 | 983.90 | 13 |
| 1956-06-02 | Bullet Perforation | 983.00 | 983.90 | 13 |
| 1956-11-09 | Bullet Perforation | 983.00 | 984.20 | 26 |
| 1958-05-29 | Cement Plug | 954.00 | 982.40 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]