If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0474200216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.030774,"lon":-112.809431,"icon":""}]} |
Location: 00/16-02-047-20W4/0 | |
Location Alias: 00/16-02-47-20 W4M | |
Location Alias 2: 00/16-02-047-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 4 | |
Range: 20 | |
Section: 02 | |
County/Municipality: Camrose | |
Well Name: BAYSEL UNIT NORTH CAMROSE #16-2 | |
Operator Name: Sevenway Capital Corporation | |
License Number: 0009208 | |
License Date: 1955-02-22 | |
License Status: RecCertified | |
Spud Date: 1955-03-06 | |
Final Drill Date: 1955-03-16 | |
Well Total Depth: 1011.90 m | |
Surface Hole Latitude: 53.030774 | |
Surface Hole Longitude: -112.809431 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1955-02-22 | Obtained License |
1955-03-01 | Perforation Treatment Performed - Bullet Perforation |
1955-03-01 | Perforation Treatment Performed - Jet Perforation |
1955-03-09 | Drill Stem Test Performed |
1955-03-15 | Drill Stem Test Performed |
1955-03-16 | Finished Drilling |
1955-03-16 | Well Mode changed to Drilled and Cased |
1955-03-17 | Production Casing Operation Performed |
1955-03-28 | Well Began Production |
1955-03-28 | Well Fluid changed to Crude Oil |
1955-03-28 | Well Mode changed to Pumping |
1961-06-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-06-24 | Well Fluid changed to Crude Oil |
1966-06-24 | Well Mode changed to Suspended |
1966-10-31 | Well Fluid changed to Crude Oil |
1966-10-31 | Well Mode changed to Pumping |
1971-03-03 | Perforation Treatment Performed - Cement Plug |
1971-03-06 | Well Abandoned |
1971-03-06 | Well Fluid changed to Crude Oil |
1971-03-06 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1955-03-01 | Bullet Perforation | 979.60 | 980.50 | 13 |
1955-03-01 | Perforation | 979.60 | 980.50 | 13 |
1961-06-19 | Acid Treatment | 979.60 | 980.50 | 0 |
1971-03-03 | Cement Plug | 934.20 | 980.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 744 | 0.0 | 0.0 | 0.0 |
1968 | 2232 | 0.0 | 0.0 | 0.0 |
1969 | 6037 | 0.0 | 0.0 | 0.0 |
1970 | 5889 | 0.0 | 0.0 | 0.0 |
For data sources see[5]