X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474262901000

Well Details

Well ID: 0474262901000
Loading map...
Location: 00/01-29-047-26W4/0
Location Alias: 00/01-29-47-26 W4M
Location Alias 2: 00/01-29-047-26 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 26
Section: 29
County/Municipality: County of Wetaskiwin No. 10
Well Name: NEO WATELET 1-29-47-26
Operator Name: NEO Exploration Inc.
License Number: 0085314
License Date: 1980-08-29
License Status: Abandoned
Spud Date: 1980-09-02
Final Drill Date: 1980-09-13
Well Total Depth: 1536.50 m
Surface Hole Latitude: 53.079618
Surface Hole Longitude: -113.761688

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-29 Obtained License
1980-09-05 Well Log Performed
1980-09-06 Drill Stem Test Performed
1980-09-13 Finished Drilling
1980-09-13 Well Log Performed
1980-09-14 Drill Stem Test Performed
1980-09-15 Drill Stem Test Performed
1980-09-19 Production Casing Operation Performed
1980-11-13 Perforation Treatment Performed - Jet Perforation
1980-11-18 Perforation Treatment Performed - Chemical Squeeze
1980-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-23 Perforation Treatment Performed - Fractured
1981-01-08 Perforation Treatment Performed - Jet Perforation
1981-01-15 Well Mode changed to Drilled and Cased
1982-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-21 Perforation Treatment Performed - Jet Perforation
1982-05-27 Perforation Treatment Performed - Cement Squeeze
1982-05-29 Perforation Treatment Performed - Jet Perforation
1982-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-02 Perforation Treatment Performed - Fractured
1982-06-07 Perforation Treatment Performed - Cement Squeeze
1982-06-10 Perforation Treatment Performed - Cement Squeeze
1982-06-10 Perforation Treatment Performed - Jet Perforation
1984-06-07 Plug Back Performed
1984-06-10 Plug Back Performed
1988-08-26 Perforation Treatment Performed - Cement Squeeze
1988-08-26 Well Log Performed
1988-08-28 Perforation Treatment Performed - Acid Wash - No Pressure
1988-08-28 Perforation Treatment Performed - Jet Perforation
1988-08-28 Well Log Performed
1988-08-30 Perforation Treatment Performed - Abrasa-Jet Perforation
1988-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-01 Well Began Production
2001-06-01 Well Fluid changed to Gas
2001-06-01 Well Mode changed to Flowing
2003-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-31 Well Fluid changed to Gas
2004-08-31 Well Mode changed to Suspended
2015-09-14 Perforation Treatment Performed - Cement Squeeze
2015-09-14 Plug Back Performed
2015-09-14 Well Fluid changed to Gas
2015-09-14 Well Mode changed to Abandoned Zone
2015-09-15 Perforation Treatment Performed - Jet Perforation
2015-09-15 Well Log Performed
2015-09-16 Perforation Treatment Performed - Cement Squeeze
2015-09-16 Plug Back Performed
2015-09-17 Perforation Treatment Performed - Jet Perforation
2015-09-17 Well Log Performed
2015-09-18 Perforation Treatment Performed - Cement Squeeze
2015-09-18 Plug Back Performed
2015-09-24 Well Abandoned
2015-09-24 Well Fluid changed to Gas
2015-09-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-13 Perforation 1497.00 1500.50 12
1982-05-29 Perforation 1328.00 1332.00 13
1982-05-31 Acid Treatment 1328.00 1332.00 0
1982-06-02 Fracture 1328.00 1332.00 0
1982-06-07 Cement Squeeze 1328.00 1332.00 0
1982-06-10 Perforation 1265.20 1266.20 13
1982-06-10 Cement Squeeze 1265.20 1266.20 0
1988-08-26 Cement Squeeze 1497.00 1500.50 0
1988-08-28 Perforation 1484.00 1486.00 14
1988-08-28 Acid Wash 1484.00 1486.00 0
1988-08-30 Hydra Jet Perforation 1484.00 1486.00 0
1980-11-18 Chemical Squeeze 1497.00 1500.50 0
1988-08-31 Acid Treatment 1484.00 1486.00 0
2003-02-01 Acid Treatment 1484.00 1486.00 0
2015-09-14 Cement Squeeze 1484.00 1486.00 0
2015-09-15 Perforation 508.00 509.00 17
2015-09-15 Perforation 475.00 476.00 17
2015-09-16 Cement Squeeze 475.00 509.00 0
2015-09-17 Perforation 386.00 387.00 17
2015-09-17 Perforation 321.00 322.00 17
2015-09-17 Perforation 263.00 264.00 17
2015-09-18 Cement Squeeze 263.00 387.00 0
1980-11-20 Acid Treatment 1497.00 1500.50 0
1980-11-23 Fracture 1497.00 1500.50 0
1981-01-08 Perforation 1507.00 1507.80 13
1982-05-20 Packing Device Capped w/Cement 1502.50 1506.00 0
1982-05-21 Perforation 1324.50 1331.00 13
1982-05-21 Acid Treatment 1324.50 1331.00 0
1982-05-27 Cement Squeeze 1324.50 1331.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4819 0.0 0.0 0.0
2002 8284 0.0 0.0 0.0
2003 4532 0.0 0.0 0.0
2004 445 0.0 0.0 0.0

For data sources see[5]

References