If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0474270308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.022184,"lon":-113.859101,"icon":""}]} |
| Location: 00/08-03-047-27W4/0 | |
| Location Alias: 00/08-03-47-27 W4M | |
| Location Alias 2: 00/08-03-047-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 03 | |
| County/Municipality: County of Wetaskiwin No. 10 | |
| Well Name: FORGE BGLEN 8-3-47-27 | |
| Operator Name: Forge Oil & Gas Limited | |
| License Number: 0409053 | |
| License Date: 2009-02-09 | |
| License Status: Issued | |
| Spud Date: 2009-02-19 | |
| Final Drill Date: 2009-02-21 | |
| Well Total Depth: 888.00 m | |
| Surface Hole Latitude: 53.022184 | |
| Surface Hole Longitude: -113.859101 |
| Date | Event |
|---|---|
| 2009-02-09 | Obtained License |
| 2009-02-20 | Surface Casing Operation Performed |
| 2009-02-21 | Finished Drilling |
| 2009-02-21 | Production Casing Operation Performed |
| 2009-02-21 | Rig Released |
| 2009-02-21 | Well Mode changed to Drilled and Cased |
| 2009-03-01 | Well Log Performed |
| 2009-03-03 | Perforation Treatment Performed - Jet Perforation |
| 2009-03-03 | Well Log Performed |
| 2009-03-06 | Perforation Treatment Performed - Fractured |
| 2009-03-25 | Well Log Performed |
| 2010-12-12 | Well Began Production |
| 2010-12-12 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2010-12-12 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-03-03 | Perforation | 538.00 | 539.00 | 13 |
| 2009-03-03 | Perforation | 484.20 | 485.70 | 13 |
| 2009-03-03 | Perforation | 482.10 | 483.00 | 13 |
| 2009-03-03 | Perforation | 468.00 | 469.00 | 13 |
| 2009-03-03 | Perforation | 454.40 | 455.30 | 13 |
| 2009-03-03 | Perforation | 449.80 | 450.60 | 13 |
| 2009-03-03 | Perforation | 424.30 | 426.00 | 13 |
| 2009-03-03 | Perforation | 417.00 | 418.20 | 13 |
| 2009-03-03 | Perforation | 413.00 | 414.00 | 13 |
| 2009-03-03 | Perforation | 410.30 | 412.00 | 13 |
| 2009-03-03 | Perforation | 402.50 | 403.50 | 13 |
| 2009-03-03 | Perforation | 531.30 | 532.20 | 13 |
| 2009-03-03 | Perforation | 362.50 | 363.50 | 13 |
| 2009-03-03 | Perforation | 350.30 | 351.00 | 13 |
| 2009-03-03 | Perforation | 346.00 | 347.00 | 13 |
| 2009-03-03 | Perforation | 309.00 | 310.50 | 13 |
| 2009-03-03 | Perforation | 302.00 | 303.00 | 13 |
| 2009-03-03 | Perforation | 297.20 | 298.20 | 13 |
| 2009-03-03 | Perforation | 282.20 | 283.20 | 13 |
| 2009-03-06 | Fracture | 538.00 | 539.00 | 0 |
| 2009-03-06 | Fracture | 531.30 | 532.20 | 0 |
| 2009-03-06 | Fracture | 521.60 | 525.70 | 0 |
| 2009-03-03 | Perforation | 524.20 | 525.70 | 13 |
| 2009-03-06 | Fracture | 517.80 | 519.30 | 0 |
| 2009-03-06 | Fracture | 511.00 | 514.00 | 0 |
| 2009-03-06 | Fracture | 502.20 | 503.20 | 0 |
| 2009-03-06 | Fracture | 493.60 | 494.60 | 0 |
| 2009-03-06 | Fracture | 482.10 | 485.70 | 0 |
| 2009-03-06 | Fracture | 468.00 | 469.00 | 0 |
| 2009-03-06 | Fracture | 454.40 | 455.30 | 0 |
| 2009-03-06 | Fracture | 449.80 | 450.60 | 0 |
| 2009-03-06 | Fracture | 424.30 | 426.00 | 0 |
| 2009-03-06 | Fracture | 417.00 | 418.20 | 0 |
| 2009-03-03 | Perforation | 521.60 | 522.60 | 13 |
| 2009-03-06 | Fracture | 410.30 | 414.00 | 0 |
| 2009-03-06 | Fracture | 402.50 | 403.50 | 0 |
| 2009-03-06 | Fracture | 362.50 | 363.50 | 0 |
| 2009-03-06 | Fracture | 350.30 | 351.00 | 0 |
| 2009-03-06 | Fracture | 346.00 | 347.00 | 0 |
| 2009-03-06 | Fracture | 309.00 | 310.50 | 0 |
| 2009-03-06 | Fracture | 302.00 | 303.00 | 0 |
| 2009-03-06 | Fracture | 297.20 | 298.20 | 0 |
| 2009-03-06 | Fracture | 282.20 | 283.20 | 0 |
| 2009-03-03 | Perforation | 517.80 | 519.30 | 13 |
| 2009-03-03 | Perforation | 512.50 | 514.00 | 13 |
| 2009-03-03 | Perforation | 511.00 | 512.00 | 13 |
| 2009-03-03 | Perforation | 502.20 | 503.20 | 13 |
| 2009-03-03 | Perforation | 493.60 | 494.60 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 323 | 0.0 | 0.0 | 0.0 |
| 2011 | 8676 | 0.0 | 0.0 | 0.0 |
| 2012 | 8406 | 0.0 | 0.0 | 0.0 |
| 2013 | 8632 | 0.0 | 0.0 | 0.0 |
| 2014 | 8638 | 0.0 | 0.0 | 0.0 |
| 2015 | 8580 | 0.0 | 0.0 | 0.0 |
| 2016 | 8692 | 0.0 | 0.0 | 0.0 |
| 2017 | 8560 | 0.0 | 0.0 | 0.0 |
| 2018 | 8352 | 0.0 | 0.0 | 0.0 |
| 2019 | 4235 | 0.0 | 0.0 | 0.0 |
| 2020 | 486 | 0.0 | 0.0 | 0.0 |
For data sources see[5]