X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475021116000

Well Details

Well ID: 0475021116000
Loading map...
Location: 00/16-11-047-02W5/0
Location Alias: 00/16-11-47-02 W5M
Location Alias 2: 00/16-11-047-02 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 02
Section: 11
County/Municipality: County of Wetaskiwin No. 10
Well Name: RIDGEBACK PEMBINA 16-11-47-2
Operator Name: Ridgeback Resources Inc.
License Number: 0422249
License Date: 2010-07-28
License Status: Amended
Spud Date: 2010-08-18
Final Drill Date: 2010-08-27
Well Total Depth: 2890.00 m
Surface Hole Latitude: 53.045971
Surface Hole Longitude: -114.202310

For data sources see[1][2]

Well History

Date Event
2010-07-28 Obtained License
2010-08-20 Direction Drilling Operation Performed - Horizontal
2010-08-20 Surface Casing Operation Performed
2010-08-22 Intermediate Casing Operation Performed
2010-08-27 Finished Drilling
2010-08-27 Perforation Treatment Performed - Open-Hole Completion
2010-08-27 Well Mode changed to Drilled and Cased
2010-08-28 Liner Casing Operation Performed
2010-08-29 Rig Released
2010-09-06 Well Log Performed
2010-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-13 Well Began Production
2010-09-13 Well Fluid changed to Crude Oil
2010-09-13 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-20 884.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-27 Open Hole/Barefoot Completion 1530.00 2889.00 0
2010-09-11 Multi-Stage Fracture 2321.80 2321.90 0
2010-09-11 Multi-Stage Fracture 2259.30 2259.40 0
2010-09-11 Multi-Stage Fracture 2196.90 2197.00 0
2010-09-11 Multi-Stage Fracture 2134.30 2134.40 0
2010-09-11 Multi-Stage Fracture 2071.90 2072.00 0
2010-09-11 Multi-Stage Fracture 1997.90 1998.00 0
2010-09-11 Multi-Stage Fracture 1935.00 1935.10 0
2010-09-11 Multi-Stage Fracture 1873.00 1873.10 0
2010-09-11 Multi-Stage Fracture 1811.00 1811.10 0
2010-09-11 Multi-Stage Fracture 1736.60 1736.70 0
2010-09-10 Multi-Stage Fracture 2841.80 2841.90 0
2010-09-11 Multi-Stage Fracture 1673.90 1674.00 0
2010-09-11 Multi-Stage Fracture 1611.70 1611.80 0
2010-09-10 Multi-Stage Fracture 2777.70 2777.80 0
2010-09-10 Multi-Stage Fracture 2715.10 2715.20 0
2010-09-10 Multi-Stage Fracture 2652.90 2653.00 0
2010-09-10 Multi-Stage Fracture 2581.90 2582.00 0
2010-09-11 Multi-Stage Fracture 2520.00 2520.10 0
2010-09-11 Multi-Stage Fracture 2457.30 2457.40 0
2010-09-11 Multi-Stage Fracture 2394.90 2395.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1942 0.0 0.0 0.0
2011 8534 0.0 0.0 0.0
2012 7892 0.0 0.0 0.0
2013 1882 0.0 0.0 0.0
2014 7169 0.0 0.0 0.0
2015 6900 0.0 0.0 0.0
2016 7915 0.0 0.0 0.0
2017 7832 0.0 0.0 0.0
2018 8196 0.0 0.0 0.0
2019 6827 0.0 0.0 0.0
2020 2004 0.0 0.0 0.0

For data sources see[6]

References