If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0475050413000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.030345,"lon":-114.657837,"icon":""}]} |
| Location: 00/13-04-047-05W5/0 | |
| Location Alias: 00/13-04-47-05 W5M | |
| Location Alias 2: 00/13-04-047-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 04 | |
| County/Municipality: County of Wetaskiwin No. 10 | |
| Well Name: RIDGEBACK PEMBINA 13-4-47-5 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0424419 | |
| License Date: 2010-10-08 | |
| License Status: Issued | |
| Spud Date: 2010-11-09 | |
| Final Drill Date: 2010-11-19 | |
| Well Total Depth: 3119.00 m | |
| Surface Hole Latitude: 53.030345 | |
| Surface Hole Longitude: -114.657837 |
| Date | Event |
|---|---|
| 2010-10-08 | Obtained License |
| 2010-11-09 | Surface Casing Operation Performed |
| 2010-11-11 | Direction Drilling Operation Performed - Horizontal |
| 2010-11-15 | Intermediate Casing Operation Performed |
| 2010-11-19 | Finished Drilling |
| 2010-11-19 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-11-19 | Well Log Performed |
| 2010-11-19 | Well Mode changed to Drilled and Cased |
| 2010-11-20 | Liner Casing Operation Performed |
| 2010-11-21 | Rig Released |
| 2010-12-09 | Well Log Performed |
| 2010-12-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-12-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-12-15 | Well Began Production |
| 2010-12-15 | Well Fluid changed to Crude Oil |
| 2010-12-15 | Well Mode changed to Flowing |
| 2014-12-01 | Well Fluid changed to Crude Oil |
| 2014-12-01 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-11-11 | 1130.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-11-19 | Open Hole/Barefoot Completion | 3114.60 | 3119.00 | 0 |
| 2010-12-11 | Multi-Stage Fracture | 2526.80 | 2526.90 | 0 |
| 2010-12-11 | Multi-Stage Fracture | 2464.50 | 2464.60 | 0 |
| 2010-12-12 | Multi-Stage Fracture | 2391.40 | 2391.50 | 0 |
| 2010-12-12 | Multi-Stage Fracture | 2317.50 | 2317.60 | 0 |
| 2010-12-12 | Multi-Stage Fracture | 2255.20 | 2255.30 | 0 |
| 2010-12-12 | Multi-Stage Fracture | 2182.00 | 2182.10 | 0 |
| 2010-12-12 | Multi-Stage Fracture | 2119.60 | 2119.70 | 0 |
| 2010-12-12 | Multi-Stage Fracture | 2056.70 | 2056.80 | 0 |
| 2010-12-12 | Multi-Stage Fracture | 1982.60 | 1982.70 | 0 |
| 2010-12-12 | Multi-Stage Fracture | 1919.70 | 1919.80 | 0 |
| 2010-12-11 | Multi-Stage Fracture | 3066.60 | 3066.70 | 0 |
| 2010-12-12 | Multi-Stage Fracture | 1846.00 | 1846.10 | 0 |
| 2010-12-12 | Multi-Stage Fracture | 1783.40 | 1873.50 | 0 |
| 2010-12-11 | Multi-Stage Fracture | 3001.80 | 3001.90 | 0 |
| 2010-12-11 | Multi-Stage Fracture | 2939.10 | 2939.20 | 0 |
| 2010-12-11 | Multi-Stage Fracture | 2864.10 | 2864.20 | 0 |
| 2010-12-11 | Multi-Stage Fracture | 2801.50 | 2801.60 | 0 |
| 2010-12-11 | Multi-Stage Fracture | 2726.50 | 2726.60 | 0 |
| 2010-12-11 | Multi-Stage Fracture | 2663.60 | 2663.70 | 0 |
| 2010-12-11 | Multi-Stage Fracture | 2589.40 | 2589.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 120 | 0.0 | 0.0 | 0.0 |
| 2011 | 7398 | 0.0 | 0.0 | 0.0 |
| 2012 | 8197 | 0.0 | 0.0 | 0.0 |
| 2013 | 8041 | 0.0 | 0.0 | 0.0 |
| 2014 | 8147 | 0.0 | 0.0 | 0.0 |
| 2015 | 8467 | 0.0 | 0.0 | 0.0 |
| 2016 | 8354 | 0.0 | 0.0 | 0.0 |
| 2017 | 8340 | 0.0 | 0.0 | 0.0 |
| 2018 | 8427 | 0.0 | 0.0 | 0.0 |
| 2019 | 7938 | 0.0 | 0.0 | 0.0 |
| 2020 | 2137 | 0.0 | 0.0 | 0.0 |
For data sources see[6]