If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0475051605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.052371,"lon":-114.658534,"icon":""}]} |
| Location: 00/05-16-047-05W5/0 | |
| Location Alias: 00/05-16-47-05 W5M | |
| Location Alias 2: 00/05-16-047-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 16 | |
| County/Municipality: County of Wetaskiwin No. 10 | |
| Well Name: RIDGEBACK PEMBINA 5-16-47-5 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0442017 | |
| License Date: 2011-12-23 | |
| License Status: Issued | |
| Spud Date: 2012-02-11 | |
| Final Drill Date: 2012-02-19 | |
| Well Total Depth: 3001.00 m | |
| Surface Hole Latitude: 53.052371 | |
| Surface Hole Longitude: -114.658534 |
| Date | Event |
|---|---|
| 2011-12-23 | Obtained License |
| 2012-02-13 | Surface Casing Operation Performed |
| 2012-02-15 | Direction Drilling Operation Performed - Horizontal |
| 2012-02-19 | Finished Drilling |
| 2012-02-19 | Well Log Performed |
| 2012-02-19 | Well Mode changed to Drilled and Cased |
| 2012-02-20 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-02-20 | Production Casing Operation Performed |
| 2012-02-20 | Rig Released |
| 2012-02-28 | Well Log Performed |
| 2012-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-03-10 | Well Began Production |
| 2012-03-10 | Well Fluid changed to Crude Oil |
| 2012-03-10 | Well Mode changed to Flowing |
| 2012-03-15 | Well Log Performed |
| 2014-12-01 | Well Fluid changed to Crude Oil |
| 2014-12-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-11 | Precision Drilling Corporation | 403 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-15 | 1217.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-02-20 | Open Hole/Barefoot Completion | 2998.30 | 3001.00 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2385.90 | 2386.00 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2315.40 | 2315.50 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2244.60 | 2244.70 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2173.90 | 2174.00 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2103.20 | 2103.30 | 0 |
| 2012-03-09 | Multi-Stage Fracture | 2032.40 | 2032.50 | 0 |
| 2012-03-09 | Multi-Stage Fracture | 1961.80 | 1961.90 | 0 |
| 2012-03-09 | Multi-Stage Fracture | 1891.10 | 1891.20 | 0 |
| 2012-03-09 | Multi-Stage Fracture | 1820.40 | 1820.50 | 0 |
| 2012-03-09 | Multi-Stage Fracture | 1751.70 | 1751.80 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2940.20 | 2940.30 | 0 |
| 2012-03-09 | Multi-Stage Fracture | 1682.20 | 1682.30 | 0 |
| 2012-03-09 | Multi-Stage Fracture | 1611.70 | 1611.80 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2867.60 | 2867.70 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2796.70 | 2796.80 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2726.10 | 2726.20 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2655.50 | 2655.60 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2585.20 | 2585.30 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2514.60 | 2514.70 | 0 |
| 2012-03-08 | Multi-Stage Fracture | 2456.80 | 2456.90 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 6384 | 0.0 | 0.0 | 0.0 |
| 2013 | 8551 | 0.0 | 0.0 | 0.0 |
| 2014 | 8333 | 0.0 | 0.0 | 0.0 |
| 2015 | 7945 | 0.0 | 0.0 | 0.0 |
| 2016 | 8543 | 0.0 | 0.0 | 0.0 |
| 2017 | 8579 | 0.0 | 0.0 | 0.0 |
| 2018 | 8727 | 0.0 | 0.0 | 0.0 |
| 2019 | 8183 | 0.0 | 0.0 | 0.0 |
| 2020 | 1998 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]