X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475051705000

Well Details

Well ID: 0475051705000
Loading map...
Location: 00/05-17-047-05W5/0
Location Alias: 00/05-17-47-05 W5M
Location Alias 2: 00/05-17-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 17
County/Municipality: County of Wetaskiwin No. 10
Well Name: RIDGEBACK PEMBINA 5-17-47-5
Operator Name: Ridgeback Resources Inc.
License Number: 0425275
License Date: 2010-10-28
License Status: Amended
Spud Date: 2010-11-23
Final Drill Date: 2010-12-02
Well Total Depth: 3115.00 m
Surface Hole Latitude: 53.052528
Surface Hole Longitude: -114.682457

For data sources see[1][2]

Well History

Date Event
2010-10-28 Obtained License
2010-11-24 Surface Casing Operation Performed
2010-11-26 Direction Drilling Operation Performed - Horizontal
2010-11-27 Intermediate Casing Operation Performed
2010-12-02 Finished Drilling
2010-12-02 Perforation Treatment Performed - Open-Hole Completion
2010-12-02 Well Log Performed
2010-12-02 Well Mode changed to Drilled and Cased
2010-12-03 Liner Casing Operation Performed
2010-12-04 Rig Released
2010-12-13 Well Log Performed
2010-12-20 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-21 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-22 Well Began Production
2010-12-22 Well Fluid changed to Crude Oil
2010-12-22 Well Mode changed to Flowing
2014-12-01 Well Fluid changed to Crude Oil
2014-12-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-26 1171.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-02 Open Hole/Barefoot Completion 3111.00 3115.00 0
2010-12-20 Multi-Stage Fracture 2597.30 2597.40 0
2010-12-20 Multi-Stage Fracture 2448.60 2448.70 0
2010-12-21 Multi-Stage Fracture 2381.90 2382.00 0
2010-12-21 Multi-Stage Fracture 2324.70 2324.80 0
2010-12-21 Multi-Stage Fracture 2255.40 2255.50 0
2010-12-21 Multi-Stage Fracture 2189.70 2189.80 0
2010-12-21 Multi-Stage Fracture 2133.60 2133.70 0
2010-12-21 Multi-Stage Fracture 2064.70 2064.80 0
2010-12-21 Multi-Stage Fracture 2006.70 2006.80 0
2010-12-21 Multi-Stage Fracture 1935.40 1935.50 0
2010-12-20 Multi-Stage Fracture 3055.90 3056.00 0
2010-12-21 Multi-Stage Fracture 1878.50 1878.60 0
2010-12-21 Multi-Stage Fracture 1809.50 1809.60 0
2010-12-20 Multi-Stage Fracture 2996.80 2996.90 0
2010-12-20 Multi-Stage Fracture 2951.60 2951.70 0
2010-12-20 Multi-Stage Fracture 2893.30 2893.40 0
2010-12-20 Multi-Stage Fracture 2833.80 2833.90 0
2010-12-20 Multi-Stage Fracture 2775.60 2775.70 0
2010-12-20 Multi-Stage Fracture 2719.10 2719.20 0
2010-12-20 Multi-Stage Fracture 2650.40 2650.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 22 0.0 0.0 0.0
2011 7137 0.0 0.0 0.0
2012 8333 0.0 0.0 0.0
2013 8461 0.0 0.0 0.0
2014 8553 0.0 0.0 0.0
2015 8335 0.0 0.0 0.0
2016 8506 0.0 0.0 0.0
2017 8713 0.0 0.0 0.0
2018 8529 0.0 0.0 0.0
2019 8722 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References