X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475112509000

Well Details

Well ID: 0475112509000
Loading map...
Location: 00/09-25-047-11W5/0
Location Alias: 00/09-25-47-11 W5M
Location Alias 2: 00/09-25-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 25
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 9-25-47-11
Operator Name: Ridgeback Resources Inc.
License Number: 0461679
License Date: 2013-11-29
License Status: Issued
Spud Date: 2014-01-08
Final Drill Date: 2014-01-20
Well Total Depth: 3332.00 m
Surface Hole Latitude: 53.086755
Surface Hole Longitude: -115.489986

For data sources see[1][2]

Well History

Date Event
2013-11-29 Obtained License
2014-01-11 Surface Casing Operation Performed
2014-01-13 Direction Drilling Operation Performed - Deviate
2014-01-14 Direction Drilling Operation Performed - Horizontal
2014-01-14 Well Log Performed
2014-01-20 Finished Drilling
2014-01-20 Well Log Performed
2014-01-20 Well Mode changed to Drilled and Cased
2014-01-22 Production Casing Operation Performed
2014-01-23 Perforation Treatment Performed - Open-Hole Completion
2014-01-23 Rig Released
2014-02-08 Well Log Performed
2014-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-21 Well Began Production
2014-02-21 Well Fluid changed to Crude Oil
2014-02-21 Well Mode changed to Flowing
2014-02-24 Well Log Performed
2014-05-07 Well Fluid changed to Crude Oil
2014-05-07 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-01-08 Precision Drilling Corporation 203 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-01-13 1518.10 Deviate (5 - 79 degrees)
2014-01-14 1949.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-01-23 Open Hole/Barefoot Completion 3326.00 3332.00 0
2014-02-19 Multi-Stage Fracture 2762.00 2762.10 0
2014-02-19 Multi-Stage Fracture 2690.60 2690.70 0
2014-02-19 Multi-Stage Fracture 2621.60 2621.70 0
2014-02-19 Multi-Stage Fracture 2564.10 2564.20 0
2014-02-20 Multi-Stage Fracture 2495.80 2495.90 0
2014-02-20 Multi-Stage Fracture 2423.70 2423.80 0
2014-02-20 Multi-Stage Fracture 2365.90 2366.00 0
2014-02-20 Multi-Stage Fracture 2296.10 2296.20 0
2014-02-20 Multi-Stage Fracture 2224.40 2224.50 0
2014-02-20 Multi-Stage Fracture 2154.70 2154.80 0
2014-02-19 Multi-Stage Fracture 3290.60 3290.70 0
2014-02-20 Multi-Stage Fracture 2096.50 2096.60 0
2014-02-20 Multi-Stage Fracture 2025.70 2025.80 0
2014-02-19 Multi-Stage Fracture 3227.90 3228.00 0
2014-02-19 Multi-Stage Fracture 3170.30 3170.40 0
2014-02-19 Multi-Stage Fracture 3097.10 3097.20 0
2014-02-19 Multi-Stage Fracture 3027.10 3027.20 0
2014-02-19 Multi-Stage Fracture 2958.50 2958.60 0
2014-02-19 Multi-Stage Fracture 2888.50 2888.60 0
2014-02-19 Multi-Stage Fracture 2833.40 2833.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-02-19 2014-02-20 1,819 2,685 N/A
2 2014-02-19 2014-02-19 1,819 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.3473 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 2.4623 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.1405 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.4297 N/A
Tolcide PS75LT Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0124 N/A
Water 7732-18-5 100 0.013 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1915 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0905 N/A
Ethoxylated phenolic resin 8300 100 0.093 N/A
Isobutyl ketone 8300 100 0.0907 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1153 N/A
Organic acid salts 1 8300 100 0.0905 N/A
Organic acid salts 2 8300 100 0.0923 N/A
Organic acid salts 3 8300 100 0.093 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 5.9114 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0661 N/A
2 15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 1.7734 N/A
Water 7732-18-5 100 1.7734 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-02-16 2014-02-18 Surface Water - Runoff 1972
2014-02-16 2014-02-18 Recycled Fracturing Water (treated at well site) 776
2014-02-16 2014-02-18 Recycled Fracturing Water (treated at well site) 114

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 5832 0.0 0.0 0.0
2015 8521 0.0 0.0 0.0
2016 8751 0.0 0.0 0.0
2017 8249 0.0 0.0 0.0
2018 8700 0.0 0.0 0.0
2019 8249 0.0 0.0 0.0
2020 2127 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-23 No Incident Encountered 0.00 0.00
2014-03-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References