X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475140714024

Well Details

Well ID: 0475140714024
Loading map...
Location: 02/14-07-047-14W5/4
Location Alias: 02/14-07-47-14 W5M
Location Alias 2: 02/14-07-047-14 W5/04
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 14
Section: 07
County/Municipality: Yellowhead County
Well Name: POCO ET AL BRAZEAU RIVER 14-7-47-14
Operator Name: Boulder Energy Ltd.
License Number: 0193263
License Date: 1996-11-07
License Status: Abandoned
Spud Date: 1996-11-13
Final Drill Date: 1996-12-08
Well Total Depth: 3300.00 m
Surface Hole Latitude: 53.043528
Surface Hole Longitude: -116.041170

For data sources see[1][2]

Well History

Date Event
1996-11-07 Obtained License
1996-11-16 Surface Casing Operation Performed
1996-12-08 Finished Drilling
1996-12-08 Well Log Performed
1996-12-08 Well Mode changed to Drilled and Cased
1996-12-09 Drill Stem Test Performed
1996-12-12 Production Casing Operation Performed
1996-12-12 Rig Released
1996-12-19 Well Log Performed
1996-12-20 Well Log Performed
1996-12-21 Perforation Treatment Performed - Jet Perforation
1997-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-07 Plug Back Performed
1997-01-08 Perforation Treatment Performed - Jet Perforation
1997-01-13 Perforation Treatment Performed - Fractured
2001-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-19 Plug Back Performed
2001-05-19 Well Log Performed
2001-05-20 Perforation Treatment Performed - Jet Perforation
2001-05-20 Well Log Performed
2001-05-22 Perforation Treatment Performed - Fractured
2001-09-29 Perforation Treatment Performed - Jet Perforation
2001-09-29 Well Log Performed
2001-10-03 Well Log Performed
2001-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-04 Plug Back Performed
2011-07-22 Perforation Treatment Performed - Cement Squeeze
2011-07-22 Perforation Treatment Performed - Jet Perforation
2011-07-29 Perforation Treatment Performed - Jet Perforation
2011-07-31 Perforation Treatment Performed - Jet Perforation
2011-07-31 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2011-07-31 Plug Back Performed
2011-08-02 Perforation Treatment Performed - Fractured
2011-08-13 Well Fluid changed to Gas
2011-08-13 Well Mode changed to Testing
2011-08-16 Well Fluid changed to Gas
2011-08-16 Well Mode changed to Test Completed
2013-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-06-30 Plug Back Performed
2013-07-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-07-02 Plug Back Performed
2013-07-02 Well Fluid changed to Gas
2013-07-02 Well Mode changed to Abandoned Zone
2013-07-03 Perforation Treatment Performed - Jet Perforation
2013-07-04 Perforation Treatment Performed - Remedial Casing
2013-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-21 Perforation 3274.00 3278.00 20
2001-05-20 Perforation 1854.00 1856.00 17
2001-05-22 Fracture 1854.00 1856.00 0
2001-09-29 Perforation 2867.00 2870.00 17
2001-10-04 Packing Device Capped w/Cement 2857.00 2865.00 0
2001-10-04 Packing Device Capped w/Cement 1842.00 1850.00 0
2011-07-22 Perforation 1854.00 1856.00 17
2011-07-22 Cement Squeeze 1854.00 1856.00 0
2011-07-29 Perforation 2867.00 2870.00 17
2011-07-31 Perforation 3146.00 3151.00 17
2011-07-31 Packing Dev Cpd w/Res-Gyp Cem 3165.00 3168.00 0
1996-12-21 Perforation 3271.50 3273.00 20
2011-08-02 Fracture 3146.00 3151.00 0
2013-06-30 Packing Device Capped w/Cement 3132.00 3140.00 0
2013-07-02 Packing Device Capped w/Cement 2854.00 2862.00 0
2013-07-02 Packing Device Capped w/Cement 1840.00 1848.00 0
2013-07-03 Perforation 1013.00 1014.00 13
2013-07-04 Remedial Casing Cementing 1013.00 1014.00 0
2013-07-05 Packing Device Capped w/Cement 980.00 1008.00 0
1996-12-21 Perforation 3255.00 3260.00 20
1997-01-04 Acid Treatment 3255.00 3278.00 0
1997-01-07 Packing Device Capped w/Cement 3240.00 3248.00 0
1997-01-08 Perforation 3177.00 3181.00 20
1997-01-08 Perforation 3171.00 3173.00 20
1997-01-13 Fracture 3171.00 3181.00 0
2001-05-19 Packing Device Capped w/Cement 3152.00 3160.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 81 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References