If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475150310002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.027885,"lon":-116.106786,"icon":""}]} |
Location: 00/10-03-047-15W5/2 | |
Location Alias: 00/10-03-47-15 W5M | |
Location Alias 2: 00/10-03-047-15 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 15 | |
Section: 03 | |
County/Municipality: Yellowhead County | |
Well Name: BOULDER BRAZR 10-3-47-15 | |
Operator Name: Boulder Energy Ltd. | |
License Number: 0183716 | |
License Date: 1995-12-19 | |
License Status: Abandoned | |
Spud Date: 1996-05-11 | |
Final Drill Date: 1996-06-30 | |
Well Total Depth: 3279.00 m | |
Surface Hole Latitude: 53.027885 | |
Surface Hole Longitude: -116.106786 |
Date | Event |
---|---|
1995-12-19 | Obtained License |
1996-05-01 | Well Log Performed |
1996-05-17 | Surface Casing Operation Performed |
1996-05-27 | Kick Occurred |
1996-05-27 | Lost Circulation Occurred |
1996-06-02 | Well Log Performed |
1996-06-19 | Lost Circulation Occurred |
1996-06-28 | Well Log Performed |
1996-06-30 | Finished Drilling |
1996-06-30 | Well Mode changed to Drilled and Cased |
1996-07-08 | Production Casing Operation Performed |
1996-07-09 | Rig Released |
1996-07-31 | Well Log Performed |
1996-08-02 | Perforation Treatment Performed - Jet Perforation |
1996-08-02 | Well Log Performed |
1996-08-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-08-09 | Perforation Treatment Performed - Fractured |
1996-08-13 | Perforation Treatment Performed - Jet Perforation |
1996-08-14 | Perforation Treatment Performed - Fractured |
1996-11-08 | Well Began Production |
1996-11-08 | Well Fluid changed to Gas |
1996-11-08 | Well Mode changed to Flowing |
2002-03-15 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2002-06-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-06-05 | Perforation Treatment Performed - Cement Plug |
2002-06-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-06-09 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2002-06-09 | Well Fluid changed to Gas |
2002-06-09 | Well Mode changed to Abandoned Zone |
2002-06-10 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-08-02 | Perforation | 3182.00 | 3185.00 | 20 |
2002-06-09 | Bridge Plug, No Cement | 2560.00 | 2560.50 | 0 |
1996-08-07 | Acid Treatment | 3182.00 | 3185.00 | 0 |
1996-08-09 | Fracture | 3182.00 | 3185.00 | 0 |
1996-08-13 | Perforation | 2575.00 | 2577.00 | 20 |
1996-08-14 | Fracture | 2575.00 | 2577.00 | 0 |
2002-03-15 | Bridge Plug, No Cement | 3175.00 | 3175.50 | 0 |
2002-06-05 | Cement Plug | 3166.70 | 3174.70 | 0 |
2002-06-05 | Packing Device Capped w/Cement | 3152.00 | 3160.00 | 0 |
2002-06-09 | Packing Device Capped w/Cement | 2564.00 | 2572.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 1146 | 0.0 | 0.0 | 0.0 |
1997 | 5131 | 0.0 | 0.0 | 0.0 |
1998 | 2954 | 0.0 | 0.0 | 0.0 |
1999 | 4055 | 0.0 | 0.0 | 0.0 |
2000 | 1196 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1996-05-27 | Kick | 2583.00 | 2583.00 |
1996-05-27 | Lost Circulation | 2583.00 | 2583.00 |
1996-06-19 | Lost Circulation | 3191.00 | 3191.00 |
For data sources see[6]