If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475151612002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.056036,"lon":-116.1438,"icon":""}]} |
Location: 00/12-16-047-15W5/2 | |
Location Alias: 00/12-16-47-15 W5M | |
Location Alias 2: 00/12-16-047-15 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 15 | |
Section: 16 | |
County/Municipality: Yellowhead County | |
Well Name: BOULDER BRAZR 12-16-47-15 | |
Operator Name: Boulder Energy Ltd. | |
License Number: 0029020 | |
License Date: 1965-09-22 | |
License Status: Issued | |
Spud Date: 1965-10-17 | |
Final Drill Date: 1965-11-02 | |
Well Total Depth: 2180.80 m | |
Surface Hole Latitude: 53.056036 | |
Surface Hole Longitude: -116.143800 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-09-22 | Obtained License |
1965-11-02 | Finished Drilling |
1965-11-02 | Well Mode changed to Drilled and Cased |
1965-11-06 | Production Casing Operation Performed |
1965-12-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-12-05 | Perforation Treatment Performed - Jet Perforation |
1966-09-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-09-19 | Perforation Treatment Performed - Fractured |
1966-09-19 | Perforation Treatment Performed - Jet Perforation |
1966-10-10 | Well Began Production |
1966-10-10 | Well Fluid changed to Crude Oil |
1966-10-10 | Well Mode changed to Pumping |
1969-05-21 | Well Fluid changed to Crude Oil |
1969-05-21 | Well Mode changed to Suspended |
1972-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1972-03-08 | Well Fluid changed to Crude Oil |
1972-03-08 | Well Mode changed to Abandoned Zone |
2011-03-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-11 | Well Log Performed |
2011-03-12 | Perforation Treatment Performed - Jet Perforation |
2011-03-12 | Well Log Performed |
2011-03-23 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-12-05 | Perforation | 2053.70 | 2058.60 | 7 |
2011-03-12 | Perforation | 2033.50 | 2039.00 | 13 |
2011-03-23 | Fracture | 2025.00 | 2039.00 | 0 |
1965-12-05 | Acid Treatment | 2053.70 | 2058.60 | 0 |
1966-09-19 | Perforation | 2120.50 | 2122.90 | 7 |
1966-09-19 | Perforation | 2125.10 | 2128.10 | 7 |
1966-09-19 | Acid Treatment | 2120.50 | 2128.10 | 0 |
1966-09-19 | Fracture | 2120.50 | 2128.10 | 0 |
1972-03-08 | Packing Device Capped w/Cement | 2087.60 | 2087.60 | 0 |
2011-03-11 | Packing Device Capped w/Cement | 2048.00 | 2051.00 | 0 |
2011-03-12 | Perforation | 2025.00 | 2030.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 5785 | 0.0 | 0.0 | 0.0 |
1968 | 5026 | 0.0 | 0.0 | 0.0 |
For data sources see[5]