X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475151704000

Well Details

Well ID: 0475151704000
Loading map...
Location: 00/04-17-047-15W5/0
Location Alias: 00/04-17-47-15 W5M
Location Alias 2: 00/04-17-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 17
County/Municipality: Yellowhead County
Well Name: BOULDER BRAZR 4-17-47-15
Operator Name: Boulder Energy Ltd.
License Number: 0459013
License Date: 2013-09-03
License Status: Amended
Spud Date: 2013-09-22
Final Drill Date: 2013-10-11
Well Total Depth: 5390.00 m
Surface Hole Latitude: 53.040538
Surface Hole Longitude: -116.119716

For data sources see[1][2]

Well History

Date Event
2013-09-03 Obtained License
2013-09-24 Surface Casing Operation Performed
2013-09-26 Direction Drilling Operation Performed - Deviate
2013-09-29 Direction Drilling Operation Performed - Horizontal
2013-09-29 Intermediate Casing Operation Performed
2013-10-11 Finished Drilling
2013-10-11 Well Mode changed to Drilled and Cased
2013-10-12 Well Log Performed
2013-10-14 Liner Casing Operation Performed
2013-10-15 Rig Released
2013-10-21 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-21 Perforation Treatment Performed - Open-Hole Completion
2013-10-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-11-04 Well Began Production
2013-11-04 Well Fluid changed to Crude Oil
2013-11-04 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-09-26 1659.70 Deviate (5 - 79 degrees)
2013-09-29 2004.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-10-21 Open Hole/Barefoot Completion 5387.00 5390.00 0
2013-10-22 Multi-Stage Fracture 3879.00 3879.10 0
2013-10-22 Multi-Stage Fracture 3697.80 3697.90 0
2013-10-22 Multi-Stage Fracture 3518.50 3518.60 0
2013-10-22 Multi-Stage Fracture 2751.90 2752.00 0
2013-10-22 Multi-Stage Fracture 2651.60 2651.70 0
2013-10-22 Multi-Stage Fracture 2552.00 2552.10 0
2013-10-22 Multi-Stage Fracture 2438.10 2438.20 0
2013-10-22 Multi-Stage Fracture 2340.20 2340.30 0
2013-10-22 Multi-Stage Fracture 2227.30 2227.40 0
2013-10-22 Multi-Stage Fracture 2127.90 2128.00 0
2013-10-21 Multi-Stage Fracture 5337.70 5337.80 0
2013-10-21 Multi-Stage Fracture 5217.30 5217.40 0
2013-10-21 Multi-Stage Fracture 5117.60 5117.70 0
2013-10-21 Multi-Stage Fracture 5031.60 5031.70 0
2013-10-21 Multi-Stage Fracture 4918.80 4918.90 0
2013-10-21 Multi-Stage Fracture 4779.50 4779.60 0
2013-10-21 Multi-Stage Fracture 4157.90 4158.00 0
2013-10-22 Multi-Stage Fracture 4030.50 4030.60 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-21 2013-10-22 1,908 0 N/A
2 2013-10-22 2013-10-22 1,908 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 39.4223 N/A
ClearFRAC XT; N002 Schlumberger Crystalline silica 14808-60-7 100 31.6066 N/A
ClearFRAC XT; N002 Schlumberger Energizing Fluid Acetic acid ethenyl ester; polymer with ethenol 25213-24-5 100 0.0016 N/A
Benzenesulfonic acid; 4-ethenyl-; sodium salt; homopolymer 25704-18-1 100 0.0173 N/A
Cholinium chloride 67-48-1 100 0.0637 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.0612 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0002 N/A
Nitrogen; liquid form 7727-37-9 100 30.3955 N/A
Polyvinyl acetate; partially hydrolyzed 304443-60-5 100 0.0021 N/A
Propan-2-ol 67-63-0 100 0.1676 N/A
Sodium chloride 7647-14-5 100 0.0084 N/A
Sodium chloroacetate 3926-62-3 100 0.0007 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0072 N/A
2 ClearFRAC XT; N002 Schlumberger Energizing Fluid 2-butoxyethanol 111-76-2 100 0.0048 N/A
Butan-1-ol 71-36-3 100 0.0019 N/A
Ethane-1;2-diol 107-21-1 100 0 N/A
Linear/branched c11 alcohol ethoxylate (3 eo) 127036-24-2 100 0.0016 N/A
Linear/branched c11 alcohol ethoxylate (8 eo) 127036-24-2 100 0.0076 N/A
Undecanol; branched and linear (impurity) 128973-77-3 100 0.0004 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 797 0.0 0.0 0.0
2014 8191 0.0 0.0 0.0
2015 8104 0.0 0.0 0.0
2016 8255 0.0 0.0 0.0
2017 8290 0.0 0.0 0.0
2018 8629 0.0 0.0 0.0
2019 8118 0.0 0.0 0.0
2020 1812 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-16 No Incident Encountered 0.00 0.00
2013-10-30 No Incident Encountered 0.00 0.00

For data sources see[8]

References