X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475151912030

Well Details

Well ID: 0475151912030
Loading map...
Location: 03/12-19-047-15W5/0
Location Alias: 03/12-19-47-15 W5M
Location Alias 2: 03/12-19-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 19
County/Municipality: Yellowhead County
Well Name: BOULDER BRAZR 12-19-47-15
Operator Name: Boulder Energy Ltd.
License Number: 0459226
License Date: 2013-09-10
License Status: Amended
Spud Date: 2013-10-09
Final Drill Date: 2013-11-02
Well Total Depth: 4925.00 m
Surface Hole Latitude: 53.089543
Surface Hole Longitude: -116.155541

For data sources see[1][2]

Well History

Date Event
2013-09-10 Obtained License
2013-10-11 Surface Casing Operation Performed
2013-10-14 Direction Drilling Operation Performed - Deviate
2013-10-15 Direction Drilling Operation Performed - Horizontal
2013-10-17 Intermediate Casing Operation Performed
2013-11-02 Finished Drilling
2013-11-02 Well Mode changed to Drilled and Cased
2013-11-04 Liner Casing Operation Performed
2013-11-05 Rig Released
2013-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2013-11-10 Perforation Treatment Performed - Open-Hole Completion
2013-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-04 Well Began Production
2013-12-04 Well Fluid changed to Crude Oil
2013-12-04 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-10-14 1667.39 Deviate (5 - 79 degrees)
2013-10-15 1977.99 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-11-10 Open Hole/Barefoot Completion 4922.00 4925.00 0
2013-11-10 Multi-Stage Fracture 4168.30 4168.40 0
2013-11-10 Multi-Stage Fracture 4069.80 4069.90 0
2013-11-10 Multi-Stage Fracture 3894.80 3894.90 0
2013-11-10 Multi-Stage Fracture 3796.00 3796.10 0
2013-11-15 Multi-Stage Fracture 3711.20 3711.30 0
2013-11-15 Multi-Stage Fracture 3613.60 3613.70 0
2013-11-15 Multi-Stage Fracture 3529.60 3529.70 0
2013-11-15 Multi-Stage Fracture 3443.90 3444.00 0
2013-11-15 Multi-Stage Fracture 2901.50 2901.60 0
2013-11-15 Multi-Stage Fracture 2662.50 2662.60 0
2013-11-10 Multi-Stage Fracture 4912.90 4913.00 0
2013-11-15 Multi-Stage Fracture 2563.30 2563.40 0
2013-11-15 Multi-Stage Fracture 2464.30 2464.40 0
2013-11-15 Multi-Stage Fracture 2365.00 2365.10 0
2013-11-15 Multi-Stage Fracture 2088.80 2088.90 0
2013-11-10 Multi-Stage Fracture 4847.60 4847.70 0
2013-11-10 Multi-Stage Fracture 4762.20 4762.30 0
2013-11-10 Multi-Stage Fracture 4676.80 4676.90 0
2013-11-10 Multi-Stage Fracture 4591.60 4591.70 0
2013-11-10 Multi-Stage Fracture 4493.10 4493.20 0
2013-11-10 Multi-Stage Fracture 4394.00 4394.10 0
2013-11-10 Multi-Stage Fracture 4267.70 4267.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-11-10 2013-11-15 1,925 0 N/A
2 2013-11-15 2013-11-15 1,925 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 39.4784 N/A
ClearFRAC XT; N002 Schlumberger Crystalline silica 14808-60-7 100 28.0876 N/A
ClearFRAC XT; N002 Schlumberger Energizing Fluid Acetic acid ethenyl ester; polymer with ethenol 25213-24-5 100 0.0015 N/A
Benzenesulfonic acid; 4-ethenyl-; sodium salt; homopolymer 25704-18-1 100 0.0167 N/A
Cholinium chloride 67-48-1 100 0.0658 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.2031 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0002 N/A
Nitrogen; liquid form 7727-37-9 100 31.9558 N/A
Polyvinyl acetate; partially hydrolyzed 304443-60-5 100 0.0005 N/A
Propan-2-ol 67-63-0 100 0.1516 N/A
Sodium chloride 7647-14-5 100 0.0278 N/A
Sodium chloroacetate 3926-62-3 100 0.0026 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.007 N/A
2 ClearFRAC XT; N002 Schlumberger Energizing Fluid 2-butoxyethanol 111-76-2 100 0.0045 N/A
Butan-1-ol 71-36-3 100 0.0018 N/A
Ethane-1;2-diol 107-21-1 100 0 N/A
Linear/branched c11 alcohol ethoxylate (3 eo) 127036-24-2 100 0.0015 N/A
Linear/branched c11 alcohol ethoxylate (8 eo) 127036-24-2 100 0.0071 N/A
Undecanol; branched and linear (impurity) 128973-77-3 100 0.0004 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 672 0.0 0.0 0.0
2014 8353 0.0 0.0 0.0
2015 7929 0.0 0.0 0.0
2016 8257 0.0 0.0 0.0
2017 8654 0.0 0.0 0.0
2018 8738 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 1945 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-05 No Incident Encountered 0.00 0.00
2013-11-23 No Incident Encountered 0.00 0.00

For data sources see[8]

References