X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475151913030

Well Details

Well ID: 0475151913030
Loading map...
Location: 03/13-19-047-15W5/0
Location Alias: 03/13-19-47-15 W5M
Location Alias 2: 03/13-19-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 19
County/Municipality: Yellowhead County
Well Name: BOULDER BRAZR 13-19-47-15
Operator Name: Boulder Energy Ltd.
License Number: 0470453
License Date: 2014-10-06
License Status: Issued
Spud Date: 2014-10-18
Final Drill Date: 2014-11-02
Well Total Depth: 5045.00 m
Surface Hole Latitude: 53.071650
Surface Hole Longitude: -116.145146

For data sources see[1][2]

Well History

Date Event
2014-10-06 Obtained License
2014-10-20 Surface Casing Operation Performed
2014-10-22 Direction Drilling Operation Performed - Deviate
2014-10-23 Direction Drilling Operation Performed - Horizontal
2014-10-24 Intermediate Casing Operation Performed
2014-11-02 Finished Drilling
2014-11-02 Well Log Performed
2014-11-02 Well Mode changed to Drilled and Cased
2014-11-05 Liner Casing Operation Performed
2014-11-07 Rig Released
2014-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-09 Perforation Treatment Performed - Open-Hole Completion
2014-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-12 Well Began Production
2014-11-12 Well Fluid changed to Crude Oil
2014-11-12 Well Mode changed to Pumping
2019-04-01 Well Began Injection
2019-04-01 Well Fluid changed to Gas
2019-04-01 Well Type changed to Injection
2019-04-04 Well Log Performed
2019-04-05 Well Log Performed
2019-11-08 Well Fluid changed to Crude Oil
2019-11-08 Well Mode changed to Pumping
2019-12-09 Well Fluid changed to Gas
2019-12-09 Well Type changed to Injection
2020-01-31 Well Fluid changed to Crude Oil
2020-01-31 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-18 Canelson Drilling Inc. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-22 1549.40 Deviate (5 - 79 degrees)
2014-10-23 1893.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-11-09 Open Hole/Barefoot Completion 4924.50 5045.00 0
2014-11-09 Multi-Stage Fracture 3468.30 3469.10 0
2014-11-09 Multi-Stage Fracture 3372.80 3373.60 0
2014-11-09 Multi-Stage Fracture 3195.90 3196.70 0
2014-11-11 Multi-Stage Fracture 2992.10 2992.90 0
2014-11-11 Multi-Stage Fracture 2894.50 2895.30 0
2014-11-11 Multi-Stage Fracture 2797.00 2797.80 0
2014-11-11 Multi-Stage Fracture 2687.10 2687.90 0
2014-11-11 Multi-Stage Fracture 2589.80 2590.60 0
2014-11-11 Multi-Stage Fracture 2492.50 2493.30 0
2014-11-11 Multi-Stage Fracture 2395.00 2395.80 0
2014-11-09 Multi-Stage Fracture 4860.20 4861.50 0
2014-11-11 Multi-Stage Fracture 2285.20 2286.00 0
2014-11-11 Multi-Stage Fracture 2189.20 2190.00 0
2014-11-11 Multi-Stage Fracture 2091.80 2092.60 0
2014-11-11 Multi-Stage Fracture 1994.60 1995.40 0
2014-11-09 Multi-Stage Fracture 4761.70 4762.50 0
2014-11-09 Multi-Stage Fracture 4651.60 4652.40 0
2014-11-09 Multi-Stage Fracture 4554.10 4554.90 0
2014-11-09 Multi-Stage Fracture 4459.10 4459.90 0
2014-11-09 Multi-Stage Fracture 4349.30 4350.10 0
2014-11-09 Multi-Stage Fracture 4255.20 4256.00 0
2014-11-09 Multi-Stage Fracture 3899.90 3900.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-09 2014-11-11 1,808 0 N/A
2 2014-11-11 2014-11-11 1,808 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 42.4614 N/A
ClearFRAC XT:Water. N002 Schlumberger Crystalline silica 14808-60-7 100 32.9757 N/A
ClearFRAC XT:Water. N002 Schlumberger Energizing Fluid 2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0741 N/A
Acetic acid ethenyl ester. polymer with ethenol 25213-24-5 100 0.0016 N/A
Benzenesulfonic acid. 4-ethenyl-. sodium salt. homopolymer 25704-18-1 100 0.0176 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.2493 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0002 N/A
Nitrogen. liquid form 7727-37-9 100 24.0315 N/A
Polyvinyl acetate. partially hydrolyzed 304443-60-5 100 0.0007 N/A
Propan-2-ol 67-63-0 100 0.1791 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0074 N/A
2 ClearFRAC XT:Water. N002 Schlumberger Energizing Fluid 2-butoxyethanol 111-76-2 100 0.0061 N/A
Butan-1-ol 71-36-3 100 0.0024 N/A
Ethylene Glycol 107-21-1 100 0 N/A
Linear/branched c11 alcohol ethoxylate (3 eo) 127036-24-2 100 0.002 N/A
Linear/branched c11 alcohol ethoxylate (8 eo) 127036-24-2 100 0.0095 N/A
Undecanol. branched and linear (impurity) 128973-77-3 100 0.0006 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-07 2014-11-08 Central Water Distribution Facility 1121

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1129 0.0 0.0 0.0
2015 8471 0.0 0.0 0.0
2016 8437 0.0 0.0 0.0
2017 8390 0.0 0.0 0.0
2018 8373 0.0 0.0 0.0
2019 2070 0.0 0.0 0.0
2020 1245 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-10 No Incident Encountered 0.00 0.00
2014-11-16 No Incident Encountered 0.00 0.00
2019-04-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References