X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475152005000

Well Details

Well ID: 0475152005000
Loading map...
Location: 00/05-20-047-15W5/0
Location Alias: 00/05-20-47-15 W5M
Location Alias 2: 00/05-20-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 20
County/Municipality: Yellowhead County
Well Name: BOULDER BRAZR 5-20-47-15
Operator Name: Boulder Energy Ltd.
License Number: 0464184
License Date: 2014-01-21
License Status: Issued
Spud Date: 2014-01-29
Final Drill Date: 2014-02-12
Well Total Depth: 4220.00 m
Surface Hole Latitude: 53.066699
Surface Hole Longitude: -116.131221

For data sources see[1][2]

Well History

Date Event
2014-01-21 Obtained License
2014-01-31 Surface Casing Operation Performed
2014-02-03 Direction Drilling Operation Performed - Deviate
2014-02-04 Direction Drilling Operation Performed - Horizontal
2014-02-06 Intermediate Casing Operation Performed
2014-02-12 Finished Drilling
2014-02-12 Well Mode changed to Drilled and Cased
2014-02-13 Well Log Performed
2014-02-14 Liner Casing Operation Performed
2014-02-16 Rig Released
2014-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-19 Perforation Treatment Performed - Open-Hole Completion
2014-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-20 Well Began Production
2014-02-20 Well Fluid changed to Crude Oil
2014-02-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-01-29 Canelson Drilling Inc. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-03 1563.00 Deviate (5 - 79 degrees)
2014-02-04 1898.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-02-19 Open Hole/Barefoot Completion 4128.00 4220.00 0
2014-02-19 Multi-Stage Fracture 3275.90 3276.00 0
2014-02-19 Multi-Stage Fracture 3183.00 3183.10 0
2014-02-19 Multi-Stage Fracture 3009.10 3009.20 0
2014-02-19 Multi-Stage Fracture 2904.70 2904.80 0
2014-02-19 Multi-Stage Fracture 2809.90 2810.00 0
2014-02-19 Multi-Stage Fracture 2707.90 2708.00 0
2014-02-19 Multi-Stage Fracture 2600.10 2600.20 0
2014-02-19 Multi-Stage Fracture 2505.40 2505.50 0
2014-02-19 Multi-Stage Fracture 2399.90 2400.00 0
2014-02-19 Multi-Stage Fracture 2307.80 2307.90 0
2014-02-19 Multi-Stage Fracture 4077.80 4077.90 0
2014-02-19 Multi-Stage Fracture 2204.20 2204.30 0
2014-02-20 Multi-Stage Fracture 2089.50 2089.60 0
2014-02-20 Multi-Stage Fracture 1996.90 1997.00 0
2014-02-19 Multi-Stage Fracture 3980.00 3980.10 0
2014-02-19 Multi-Stage Fracture 3814.30 3814.40 0
2014-02-19 Multi-Stage Fracture 3721.90 3722.00 0
2014-02-19 Multi-Stage Fracture 3626.10 3626.20 0
2014-02-19 Multi-Stage Fracture 3545.00 3545.10 0
2014-02-19 Multi-Stage Fracture 3452.70 3452.80 0
2014-02-19 Multi-Stage Fracture 3360.00 3360.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-02-19 2014-02-20 1,799 0 N/A
2 2014-02-20 2014-02-20 1,799 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 39.071 N/A
ClearFRAC XT; N002 Schlumberger Crystalline silica 14808-60-7 100 29.4655 N/A
ClearFRAC XT; N002 Schlumberger Energizing Fluid Acetic acid ethenyl ester; polymer with ethenol 25213-24-5 100 0.0014 N/A
Benzenesulfonic acid; 4-ethenyl-; sodium salt; homopolymer 25704-18-1 100 0.0153 N/A
Cholinium chloride 67-48-1 100 0.0606 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.2104 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0002 N/A
Nitrogen; liquid form 7727-37-9 100 30.9713 N/A
Polyvinyl acetate; partially hydrolyzed 304443-60-5 100 0.0006 N/A
Propan-2-ol 67-63-0 100 0.1642 N/A
Sodium chloride 7647-14-5 100 0.0289 N/A
Sodium chloroacetate 3926-62-3 100 0.0027 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0064 N/A
2 ClearFRAC XT; N002 Schlumberger Energizing Fluid 2-butoxyethanol 111-76-2 100 0.006 N/A
Butan-1-ol 71-36-3 100 0.0024 N/A
Ethane-1;2-diol 107-21-1 100 0 N/A
Linear/branched c11 alcohol ethoxylate (3 eo) 127036-24-2 100 0.002 N/A
Linear/branched c11 alcohol ethoxylate (8 eo) 127036-24-2 100 0.0094 N/A
Undecanol; branched and linear (impurity) 128973-77-3 100 0.0006 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-02-18 2014-02-18 Central Water Distribution Facility 840

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6342 0.0 0.0 0.0
2015 8322 0.0 0.0 0.0
2016 8302 0.0 0.0 0.0
2017 8281 0.0 0.0 0.0
2018 8674 0.0 0.0 0.0
2019 7876 0.0 0.0 0.0
2020 1632 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-17 No Incident Encountered 0.00 0.00
2014-02-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References