X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475152402000

Well Details

Well ID: 0475152402000
Loading map...
Location: 00/02-24-047-15W5/0
Location Alias: 00/02-24-47-15 W5M
Location Alias 2: 00/02-24-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 24
County/Municipality: Yellowhead County
Well Name: BOULDER BRAZR 2-24-47-15
Operator Name: Boulder Energy Ltd.
License Number: 0448591
License Date: 2012-09-19
License Status: Amended
Spud Date: 2012-10-17
Final Drill Date: 2012-10-31
Well Total Depth: 3409.00 m
Surface Hole Latitude: 53.064007
Surface Hole Longitude: -116.032751

For data sources see[1][2]

Well History

Date Event
2012-09-19 Obtained License
2012-10-20 Surface Casing Operation Performed
2012-10-23 Direction Drilling Operation Performed - Deviate
2012-10-25 Direction Drilling Operation Performed - Horizontal
2012-10-26 Intermediate Casing Operation Performed
2012-10-31 Finished Drilling
2012-10-31 Well Mode changed to Drilled and Cased
2012-11-03 Liner Casing Operation Performed
2012-11-05 Rig Released
2012-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-09 Perforation Treatment Performed - Open-Hole Completion
2012-11-21 Well Began Production
2012-11-21 Well Fluid changed to Crude Oil
2012-11-21 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-10-23 1453.70 Deviate (5 - 79 degrees)
2012-10-25 1848.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-09 Open Hole/Barefoot Completion 3404.00 3409.00 0
2012-11-09 Multi-Stage Fracture 2891.80 2892.80 0
2012-11-09 Multi-Stage Fracture 2833.40 2834.40 0
2012-11-09 Multi-Stage Fracture 2761.30 2762.30 0
2012-11-09 Multi-Stage Fracture 2631.40 2632.40 0
2012-11-09 Multi-Stage Fracture 2572.80 2573.80 0
2012-11-09 Multi-Stage Fracture 2500.80 2501.80 0
2012-11-09 Multi-Stage Fracture 2428.80 2429.90 0
2012-11-09 Multi-Stage Fracture 2383.60 2384.60 0
2012-11-09 Multi-Stage Fracture 2338.40 2339.40 0
2012-11-09 Multi-Stage Fracture 2279.80 2280.80 0
2012-11-09 Multi-Stage Fracture 3381.70 3382.70 0
2012-11-09 Multi-Stage Fracture 2029.40 2030.40 0
2012-11-09 Multi-Stage Fracture 1970.80 1971.80 0
2012-11-09 Multi-Stage Fracture 1925.60 1926.60 0
2012-11-09 Multi-Stage Fracture 3316.20 3317.20 0
2012-11-09 Multi-Stage Fracture 3257.40 3258.40 0
2012-11-09 Multi-Stage Fracture 3198.60 3199.60 0
2012-11-09 Multi-Stage Fracture 3140.20 3141.20 0
2012-11-09 Multi-Stage Fracture 3081.40 3082.40 0
2012-11-09 Multi-Stage Fracture 3009.10 3010.10 0
2012-11-09 Multi-Stage Fracture 2950.50 2951.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 915 0.0 0.0 0.0
2013 8382 0.0 0.0 0.0
2014 8148 0.0 0.0 0.0
2015 8121 0.0 0.0 0.0
2016 8372 0.0 0.0 0.0
2017 7574 0.0 0.0 0.0
2018 7805 0.0 0.0 0.0
2019 7948 0.0 0.0 0.0
2020 1908 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-05 No Incident Encountered 0.00 0.00
2012-11-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References