X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475152507004

Well Details

Well ID: 0475152507004
Loading map...
Location: 00/07-25-047-15W5/4
Location Alias: 00/07-25-47-15 W5M
Location Alias 2: 00/07-25-047-15 W5/04
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 25
County/Municipality: Yellowhead County
Well Name: BLDR BRAZR 7-25-47-15
Operator Name: Boulder Energy Ltd.
License Number: 0189890
License Date: 1996-07-24
License Status: Suspension
Spud Date: 1996-08-02
Final Drill Date: 1996-08-27
Well Total Depth: 3210.00 m
Surface Hole Latitude: 53.079738
Surface Hole Longitude: -116.056224

For data sources see[1][2]

Well History

Date Event
1996-07-24 Obtained License
1996-08-05 Surface Casing Operation Performed
1996-08-14 Kick Occurred
1996-08-27 Finished Drilling
1996-08-27 Well Log Performed
1996-08-27 Well Mode changed to Drilled and Cased
1996-08-28 Well Log Performed
1996-08-30 Production Casing Operation Performed
1996-08-30 Rig Released
1996-09-23 Well Log Performed
1996-09-24 Well Log Performed
1996-09-25 Perforation Treatment Performed - Jet Perforation
1996-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-26 Well Log Performed
1996-09-27 Perforation Treatment Performed - Jet Perforation
1996-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-30 Well Log Performed
1996-10-08 Well Log Performed
1996-10-09 Perforation Treatment Performed - Jet Perforation
1996-10-09 Well Log Performed
1996-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-20 Well Log Performed
1996-10-23 Perforation Treatment Performed - Cement Squeeze
1996-10-23 Well Log Performed
1996-10-30 Well Log Performed
1996-10-31 Perforation Treatment Performed - Jet Perforation
1996-11-02 Perforation Treatment Performed - Fractured
2002-10-19 Well Log Performed
2002-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-20 Plug Back Performed
2002-10-20 Well Log Performed
2002-10-21 Perforation Treatment Performed - Cement Squeeze
2002-10-21 Plug Back Performed
2002-10-26 Perforation Treatment Performed - Jet Perforation
2002-10-26 Well Log Performed
2004-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-30 Plug Back Performed
2004-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-31 Well Log Performed
2004-11-02 Perforation Treatment Performed - Jet Perforation
2004-11-02 Well Log Performed
2004-11-03 Well Fluid changed to Gas
2004-11-03 Well Mode changed to Testing
2004-11-05 Perforation Treatment Performed - Fractured
2004-12-01 Well Began Production
2004-12-01 Well Fluid changed to Gas
2004-12-01 Well Mode changed to Flowing
2005-06-01 Well Fluid changed to Gas
2005-06-01 Well Mode changed to Pumping
2012-03-01 Well Fluid changed to Gas
2012-03-01 Well Mode changed to Suspended
2018-05-29 Well Log Performed
2018-05-31 Well Log Performed
2018-07-01 Well Began Injection
2018-07-01 Well Fluid changed to Gas
2018-07-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-09-25 Perforation 3180.00 3183.00 20
1996-10-31 Perforation 2425.00 2431.00 20
1996-11-02 Fracture 2425.00 2431.00 0
2002-10-20 Packing Device Capped w/Cement 3140.50 3147.80 0
2002-10-21 Cement Squeeze 2425.00 2431.00 0
2002-10-26 Perforation 3085.00 3089.00 16
2004-10-30 Packing Device Capped w/Cement 3069.00 3077.00 0
2004-10-31 Packing Device Capped w/Cement 2409.00 2417.00 0
2004-11-02 Perforation 1708.00 1712.00 17
2004-11-05 Fracture 1708.00 1712.00 0
1996-09-26 Acid Treatment 3180.00 3183.00 0
1996-09-27 Perforation 3172.00 3174.00 20
1996-09-27 Perforation 3176.00 3179.00 20
1996-09-28 Acid Treatment 3172.00 3179.00 0
1996-10-09 Perforation 3172.00 3174.00 20
1996-10-09 Perforation 3176.00 3179.00 20
1996-10-15 Acid Treatment 3172.00 3179.00 0
1996-10-23 Cement Squeeze 3176.00 3183.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 759 0.0 0.0 0.0
2005 8659 0.0 0.0 0.0
2006 8723 0.0 0.0 0.0
2007 5831 0.0 0.0 0.0
2008 2689 0.0 0.0 0.0
2009 8327 0.0 0.0 0.0
2010 8592 0.0 0.0 0.0
2011 6073 0.0 0.0 0.0
2012 360 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-08-14 Kick 2435.00 2450.00

For data sources see[6]

References