X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475152601000

Well Details

Well ID: 0475152601000
Loading map...
Location: 00/01-26-047-15W5/0
Location Alias: 00/01-26-47-15 W5M
Location Alias 2: 00/01-26-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 26
County/Municipality: Yellowhead County
Well Name: BOULDER 2E-27 HZ BRAZR 1-26-47-15
Operator Name: Boulder Energy Ltd.
License Number: 0475758
License Date: 2015-06-11
License Status: Issued
Spud Date: 2015-06-17
Final Drill Date: 2015-06-28
Well Total Depth: 4100.00 m
Surface Hole Latitude: 53.079122
Surface Hole Longitude: -116.109283

For data sources see[1][2]

Well History

Date Event
2015-06-11 Obtained License
2015-06-18 Surface Casing Operation Performed
2015-06-20 Direction Drilling Operation Performed - Deviate
2015-06-21 Direction Drilling Operation Performed - Horizontal
2015-06-28 Finished Drilling
2015-06-28 Well Log Performed
2015-06-28 Well Mode changed to Drilled and Cased
2015-06-30 Production Casing Operation Performed
2015-07-01 Rig Released
2015-07-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-15 Well Fluid changed to Crude Oil
2015-07-15 Well Mode changed to Drilling and Completing
2015-08-01 Well Began Production
2015-08-01 Well Fluid changed to Crude Oil
2015-08-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-06-17 Precision Drilling Corporation 309 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-06-20 1520.20 Deviate (5 - 79 degrees)
2015-06-21 1861.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-07-12 Multi-Stage Fracture 3990.70 3992.50 0
2015-07-13 Multi-Stage Fracture 3100.20 3102.10 0
2015-07-13 Multi-Stage Fracture 3004.80 3006.70 0
2015-07-13 Multi-Stage Fracture 2892.70 2894.60 0
2015-07-13 Multi-Stage Fracture 2796.20 2798.10 0
2015-07-13 Multi-Stage Fracture 2697.70 2699.60 0
2015-07-13 Multi-Stage Fracture 2602.50 2604.40 0
2015-07-13 Multi-Stage Fracture 2494.70 2496.60 0
2015-07-14 Multi-Stage Fracture 2396.80 2398.60 0
2015-07-14 Multi-Stage Fracture 2300.40 2302.30 0
2015-07-14 Multi-Stage Fracture 2203.60 2205.50 0
2015-07-12 Multi-Stage Fracture 3905.60 3907.50 0
2015-07-14 Multi-Stage Fracture 2094.80 2096.70 0
2015-07-14 Multi-Stage Fracture 1995.40 1997.30 0
2015-07-14 Multi-Stage Fracture 1897.60 1899.50 0
2015-07-12 Multi-Stage Fracture 3822.70 3824.60 0
2015-07-13 Multi-Stage Fracture 3699.50 3701.30 0
2015-07-13 Multi-Stage Fracture 3599.30 3601.10 0
2015-07-13 Multi-Stage Fracture 3502.00 3503.80 0
2015-07-13 Multi-Stage Fracture 3404.30 3406.20 0
2015-07-13 Multi-Stage Fracture 3306.40 3308.30 0
2015-07-13 Multi-Stage Fracture 3196.20 3198.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-12 2015-07-14 1,763 0 N/A
2 2015-07-14 2015-07-14 1,763 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 43.2569 N/A
ClearFRAC XT. N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 33.4797 N/A
ClearFRAC XT. N002 Schlumberger Energizing Fluid 2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0699 N/A
Acetic acid ethenyl ester. polymer with ethenol 25213-24-5 100 0.0014 N/A
Benzenesulfonic acid. 4-ethenyl-. sodium salt. homopolymer 25704-18-1 100 0.015 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.1954 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0002 N/A
Nitrogen. liquid form 7727-37-9 100 24.3591 N/A
Polyvinyl acetate. partially hydrolyzed 304443-60-5 100 0.0005 N/A
Propan-2-ol 67-63-0 100 0.1366 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0063 N/A
2 ClearFRAC XT. N002 Schlumberger Energizing Fluid 2-butoxyethanol Trade Secret 100 0.0018 N/A
Acetic acid(impurity) Trade Secret 100 0 N/A
Acetic acid. potassium salt (impurity) Trade Secret 100 0 N/A
Aliphatic alcohol Trade Secret 100 0.0007 N/A
Polyethoxylated alkanol Trade Secret 100 0.0036 N/A
Undecanol. branched and linear (impurity) Trade Secret 100 0.0001 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-05 2015-07-08 Central Water Distribution Facility 1120

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3622 0.0 0.0 0.0
2016 8588 0.0 0.0 0.0
2017 8395 0.0 0.0 0.0
2018 6082 0.0 0.0 0.0
2019 5934 0.0 0.0 0.0
2020 1552 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-01 No Incident Encountered 0.00 0.00
2015-07-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References