If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475153104002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.093162,"lon":-116.142352,"icon":""}]} |
Location: 00/04-31-047-15W5/2 | |
Location Alias: 00/04-31-47-15 W5M | |
Location Alias 2: 00/04-31-047-15 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 15 | |
Section: 31 | |
County/Municipality: Yellowhead County | |
Well Name: BOULDER BRAZR 4-33-47-15 | |
Operator Name: Boulder Energy Ltd. | |
License Number: 0470114 | |
License Date: 2014-09-19 | |
License Status: Suspension | |
Spud Date: 2014-10-12 | |
Final Drill Date: 2014-11-06 | |
Well Total Depth: 5003.00 m | |
Surface Hole Latitude: 53.093162 | |
Surface Hole Longitude: -116.142352 |
Date | Event |
---|---|
2014-09-19 | Obtained License |
2014-10-13 | Surface Casing Operation Performed |
2014-10-19 | Direction Drilling Operation Performed - Deviate |
2014-10-21 | Direction Drilling Operation Performed - Horizontal |
2014-10-22 | Intermediate Casing Operation Performed |
2014-11-06 | Finished Drilling |
2014-11-06 | Well Log Performed |
2014-11-06 | Well Mode changed to Drilled and Cased |
2014-11-08 | Liner Casing Operation Performed |
2014-11-09 | Rig Released |
2014-11-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-11-19 | Perforation Treatment Performed - Open-Hole Completion |
2014-11-22 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2014-10-19 | 1467.20 | Deviate (5 - 79 degrees) |
2014-10-21 | 1833.70 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-11-19 | Open Hole/Barefoot Completion | 4961.00 | 5003.00 | 0 |
2014-11-22 | Multi-Stage Fracture | 2839.00 | 2839.80 | 0 |
2014-11-22 | Multi-Stage Fracture | 2761.10 | 2761.90 | 0 |
2014-11-22 | Multi-Stage Fracture | 2438.10 | 2438.90 | 0 |
2014-11-22 | Multi-Stage Fracture | 2358.90 | 2359.70 | 0 |
2014-11-22 | Multi-Stage Fracture | 2179.10 | 2179.90 | 0 |
2014-11-22 | Multi-Stage Fracture | 2086.50 | 2087.30 | 0 |
2014-11-22 | Multi-Stage Fracture | 1982.00 | 1982.80 | 0 |
2014-11-19 | Multi-Stage Fracture | 4910.00 | 4911.30 | 0 |
2014-11-19 | Multi-Stage Fracture | 4735.90 | 4736.70 | 0 |
2014-11-19 | Multi-Stage Fracture | 4630.30 | 4631.10 | 0 |
2014-11-22 | Multi-Stage Fracture | 3683.30 | 3684.10 | 0 |
2014-11-22 | Multi-Stage Fracture | 3396.80 | 3397.60 | 0 |
2014-11-22 | Multi-Stage Fracture | 3171.30 | 3172.10 | 0 |
2014-11-22 | Multi-Stage Fracture | 3103.10 | 3103.90 | 0 |
2014-11-22 | Multi-Stage Fracture | 2918.10 | 2918.90 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-11-19 | 2014-11-22 | 1,735 | 0 | N/A |
2 | 2014-11-22 | 2014-11-22 | 1,735 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water (Including Mix Water Supplied by Client)* | Not Available | 100 | 52.4925 | N/A | |||
ClearFRAC XT:Water. N002 | Schlumberger | Crystalline silica | 14808-60-7 | 100 | 30.3616 | N/A | ||
ClearFRAC XT:Water. N002 | Schlumberger | Energizing Fluid | 2-hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0748 | N/A | |
Acetic acid ethenyl ester. polymer with ethenol | 25213-24-5 | 100 | 0.0016 | N/A | ||||
Benzenesulfonic acid. 4-ethenyl-. sodium salt. homopolymer | 25704-18-1 | 100 | 0.0174 | N/A | ||||
Erucic amidopropyl dimethyl betaine | 149879-98-1 | 100 | 0.211 | N/A | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 100 | 0.0002 | N/A | ||||
Nitrogen. liquid form | 7727-37-9 | 100 | 22.7512 | N/A | ||||
Polyvinyl acetate. partially hydrolyzed | 304443-60-5 | 100 | 0.0006 | N/A | ||||
Propan-2-ol | 67-63-0 | 100 | 0.1542 | N/A | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 100 | 0.0073 | N/A | ||||
2 | ClearFRAC XT:Water. N002 | Schlumberger | Energizing Fluid | 2-butoxyethanol | 111-76-2 | 100 | 0.0051 | N/A |
Butan-1-ol | 71-36-3 | 100 | 0.002 | N/A | ||||
Ethylene Glycol | 107-21-1 | 100 | 0 | N/A | ||||
Linear/branched c11 alcohol ethoxylate (3 eo) | 127036-24-2 | 100 | 0.0017 | N/A | ||||
Linear/branched c11 alcohol ethoxylate (8 eo) | 127036-24-2 | 100 | 0.0079 | N/A | ||||
Undecanol. branched and linear (impurity) | 128973-77-3 | 100 | 0.0005 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-11-10 | 2014-11-10 | Central Water Distribution Facility | 840 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-11-09 | No Incident Encountered | 0.00 | 0.00 |
2014-12-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]