X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475160106000

Well Details

Well ID: 0475160106000
Loading map...
Location: 00/06-01-047-16W5/0
Location Alias: 00/06-01-47-16 W5M
Location Alias 2: 00/06-01-047-16 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 16
Section: 01
County/Municipality: Yellowhead County
Well Name: BOULDER PECO 6-1-47-16
Operator Name: Boulder Energy Ltd.
License Number: 0074756
License Date: 1979-03-05
License Status: Abandoned
Spud Date: 1979-03-08
Final Drill Date: 1979-08-29
Well Total Depth: 4008.00 m
Surface Hole Latitude: 53.023885
Surface Hole Longitude: -116.211655

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-05 Obtained License
1979-05-24 Perforation Treatment Performed - Jet Perforation
1979-05-25 Perforation Treatment Performed - Cement Squeeze
1979-05-26 Perforation Treatment Performed - Cement Squeeze
1979-05-26 Perforation Treatment Performed - Jet Perforation
1979-05-27 Perforation Treatment Performed - Cement Squeeze
1979-07-12 Drill Stem Test Performed
1979-08-29 Finished Drilling
1979-08-29 Lost Circulation Occurred
1979-09-04 Liner Casing Operation Performed
1979-09-10 Perforation Treatment Performed - Selective Jet Perforations
1979-09-19 Well Mode changed to Drilled and Cased
1979-11-16 Perforation Treatment Performed - Jet Perforation
1979-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-16 Perforation Treatment Performed - Cement Squeeze
1980-01-31 Perforation Treatment Performed - Jet Perforation
1980-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-06 Perforation Treatment Performed - Cement Plug
1980-11-10 Perforation Treatment Performed - Jet Perforation
1980-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-12 Well Abandoned
1980-11-12 Well Mode changed to Abandoned
1983-11-14 Well Log Performed
1983-11-21 Well Log Performed
1989-09-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-05-24 Perforation 1703.00 1703.70 9
1979-12-04 Packing Device Capped w/Cement 3993.70 3994.70 0
1979-12-15 Acid Treatment 3864.00 3955.50 0
1979-12-16 Cement Squeeze 3864.00 3955.50 0
1980-01-31 Perforation 3949.50 3955.50 13
1980-02-03 Acid Treatment 3949.50 3955.50 0
1980-11-05 Packing Device Capped w/Cement 3106.00 3879.00 0
1980-11-06 Cement Plug 3000.00 3106.00 0
1980-11-10 Perforation 1660.00 1662.00 13
1980-11-12 Packing Device Capped w/Cement 458.70 594.50 0
1979-05-25 Cement Squeeze 1703.00 1703.70 0
1979-05-26 Perforation 1683.00 1683.60 13
1979-05-26 Perforation 1673.00 1673.60 13
1979-05-26 Perforation 1600.00 1600.60 13
1979-05-26 Cement Squeeze 1600.00 1683.60 0
1979-05-27 Cement Squeeze 1600.00 1683.60 0
1979-09-10 Selective Jet Perforations 3864.00 3864.00 0
1979-11-16 Perforation 3949.50 3955.50 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-08-29 Lost Circulation 4014.80 4014.80

For data sources see[5]

References