If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475160203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.021078,"lon":-116.236533,"icon":""}]} |
Location: 00/03-02-047-16W5/0 | |
Location Alias: 00/03-02-47-16 W5M | |
Location Alias 2: 00/03-02-047-16 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 16 | |
Section: 02 | |
County/Municipality: Yellowhead County | |
Well Name: BOULDER PECO 3-2-47-16 | |
Operator Name: Boulder Energy Ltd. | |
License Number: 0102303 | |
License Date: 1983-07-21 | |
License Status: Suspension | |
Spud Date: 1983-08-11 | |
Final Drill Date: 1983-09-13 | |
Well Total Depth: 2265.00 m | |
Surface Hole Latitude: 53.021078 | |
Surface Hole Longitude: -116.236533 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-07-21 | Obtained License |
1983-09-13 | Finished Drilling |
1983-09-14 | Drill Stem Test Performed |
1983-09-19 | Drill Stem Test Performed |
1983-09-20 | Drill Stem Test Performed |
1983-09-21 | Production Casing Operation Performed |
1983-09-22 | Well Mode changed to Drilled and Cased |
1983-11-18 | Perforation Treatment Performed - Jet Perforation |
1983-11-20 | Perforation Treatment Performed - Fractured |
1983-12-06 | Well Began Production |
1983-12-06 | Well Fluid changed to Crude Oil |
1983-12-06 | Well Mode changed to Pumping |
1984-09-25 | Well Fluid changed to Crude Oil |
1984-09-25 | Well Mode changed to Suspended |
1984-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-09-28 | Perforation Treatment Performed - Jet Perforation |
1984-09-28 | Plug Back Performed |
1984-09-28 | Well Fluid changed to Crude Oil |
1984-09-28 | Well Log Performed |
1984-09-28 | Well Mode changed to Abandoned Zone |
1984-09-30 | Perforation Treatment Performed - Fractured |
1984-10-04 | Well Log Performed |
2008-06-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-11-18 | Perforation | 2219.00 | 2220.00 | 7 |
1984-09-28 | Perforation | 2197.50 | 2206.50 | 7 |
1984-09-30 | Fracture | 2194.00 | 2206.50 | 0 |
2008-06-21 | Packing Device Capped w/Cement | 2177.00 | 2185.00 | 0 |
1983-11-18 | Perforation | 2220.70 | 2222.60 | 7 |
1983-11-18 | Perforation | 2224.00 | 2231.00 | 7 |
1983-11-18 | Perforation | 2233.00 | 2234.00 | 7 |
1983-11-18 | Perforation | 2236.00 | 2237.00 | 7 |
1983-11-20 | Fracture | 2219.00 | 2237.00 | 0 |
1984-09-28 | Packing Device Capped w/Cement | 2211.00 | 2216.00 | 0 |
1984-09-28 | Perforation | 2194.00 | 2195.00 | 7 |
1984-09-28 | Perforation | 2195.50 | 2196.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 400 | 0.0 | 0.0 | 0.0 |
1984 | 4100 | 0.0 | 0.0 | 0.0 |
For data sources see[5]