If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475161205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.036424,"lon":-116.214772,"icon":""}]} |
Location: 00/05-12-047-16W5/0 | |
Location Alias: 00/05-12-47-16 W5M | |
Location Alias 2: 00/05-12-047-16 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 16 | |
Section: 12 | |
County/Municipality: Yellowhead County | |
Well Name: BLDR PECO 5-12-47-16 | |
Operator Name: Boulder Energy Ltd. | |
License Number: 0105541 | |
License Date: 1984-01-26 | |
License Status: Suspension | |
Spud Date: 1984-02-01 | |
Final Drill Date: 1984-02-13 | |
Well Total Depth: 2156.00 m | |
Surface Hole Latitude: 53.036424 | |
Surface Hole Longitude: -116.214772 |
Date | Event |
---|---|
1984-01-26 | Obtained License |
1984-02-02 | Lost Circulation Occurred |
1984-02-13 | Finished Drilling |
1984-02-14 | Well Log Performed |
1984-02-15 | Drill Stem Test Performed |
1984-02-16 | Production Casing Operation Performed |
1984-02-28 | Perforation Treatment Performed - Jet Perforation |
1984-03-02 | Well Log Performed |
1984-03-03 | Perforation Treatment Performed - Fractured |
1984-03-03 | Perforation Treatment Performed - Jet Perforation |
1984-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-03-09 | Perforation Treatment Performed - Jet Perforation |
1984-03-10 | Perforation Treatment Performed - Fractured |
1984-03-15 | Well Log Performed |
1984-03-17 | Well Log Performed |
1984-03-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-03-25 | Well Log Performed |
1984-03-26 | Perforation Treatment Performed - Jet Perforation |
1984-03-26 | Well Mode changed to Drilled and Cased |
1984-03-27 | Perforation Treatment Performed - Fractured |
2005-02-27 | Well Fluid changed to Gas |
2005-02-27 | Well Mode changed to Testing |
2005-06-27 | Well Fluid changed to Gas |
2005-06-27 | Well Mode changed to Test Completed |
2007-03-01 | Well Log Performed |
2007-03-02 | Well Log Performed |
2007-03-05 | Perforation Treatment Performed - Jet Perforation |
2007-03-05 | Well Log Performed |
2007-03-06 | Perforation Treatment Performed - Remedial Casing |
2007-03-09 | Well Log Performed |
2007-03-10 | Perforation Treatment Performed - Jet Perforation |
2007-03-10 | Well Log Performed |
2007-03-14 | Perforation Treatment Performed - Remedial Casing |
2010-01-22 | Well Fluid changed to Gas |
2010-01-22 | Well Mode changed to Testing |
2010-02-27 | Perforation Treatment Performed - Cement Plug |
2010-03-02 | Well Fluid changed to Gas |
2010-03-02 | Well Mode changed to Test Completed |
2010-12-08 | Well Began Production |
2010-12-08 | Well Fluid changed to Gas |
2010-12-08 | Well Mode changed to Flowing |
2015-05-19 | Well Fluid changed to Gas |
2015-05-19 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-02-28 | Perforation | 2077.00 | 2079.00 | 13 |
1984-03-26 | Perforation | 2031.00 | 2036.50 | 7 |
1984-03-26 | Perforation | 2038.00 | 2041.00 | 0 |
1984-03-27 | Fracture | 2031.00 | 2041.00 | 0 |
2007-03-05 | Perforation | 605.50 | 606.50 | 17 |
2007-03-06 | Remedial Casing Cementing | 605.50 | 606.50 | 0 |
2007-03-10 | Perforation | 1805.00 | 1806.00 | 17 |
2007-03-14 | Remedial Casing Cementing | 1805.00 | 1806.00 | 0 |
2010-02-27 | Cement Plug | 2045.50 | 2048.50 | 0 |
1984-02-28 | Perforation | 2090.00 | 2091.50 | 13 |
1984-03-03 | Perforation | 2077.00 | 2079.00 | 0 |
1984-03-03 | Perforation | 2090.00 | 2091.50 | 0 |
1984-03-03 | Fracture | 2077.00 | 2091.50 | 0 |
1984-03-08 | Packing Device Capped w/Cement | 2066.00 | 2074.00 | 0 |
1984-03-09 | Perforation | 2056.00 | 2063.50 | 7 |
1984-03-10 | Fracture | 2056.00 | 2063.50 | 0 |
1984-03-25 | Packing Device Capped w/Cement | 2047.00 | 2052.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 47 | 0.0 | 0.0 | 0.0 |
2010 | 411 | 0.0 | 0.0 | 0.0 |
2011 | 4904 | 0.0 | 0.0 | 0.0 |
2012 | 6724 | 0.0 | 0.0 | 0.0 |
2013 | 2 | 0.0 | 0.0 | 0.0 |
2017 | 84 | 0.0 | 0.0 | 0.0 |
2018 | 215 | 0.0 | 0.0 | 0.0 |
2019 | 177 | 0.0 | 0.0 | 0.0 |
2020 | 11 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1984-02-02 | Lost Circulation | 99.00 | 193.00 |
For data sources see[6]