If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475161510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.055758,"lon":-116.218961,"icon":""}]} |
Location: 00/10-15-047-16W5/0 | |
Location Alias: 00/10-15-47-16 W5M | |
Location Alias 2: 00/10-15-047-16 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 16 | |
Section: 15 | |
County/Municipality: Yellowhead County | |
Well Name: BLDR 12A-13 HZ PECO 10-15-47-16 | |
Operator Name: Boulder Energy Ltd. | |
License Number: 0475575 | |
License Date: 2015-06-01 | |
License Status: Amended | |
Spud Date: 2015-06-18 | |
Final Drill Date: 2015-07-01 | |
Well Total Depth: 4093.00 m | |
Surface Hole Latitude: 53.055758 | |
Surface Hole Longitude: -116.218961 |
Date | Event |
---|---|
2015-06-01 | Obtained License |
2015-06-19 | Surface Casing Operation Performed |
2015-06-22 | Direction Drilling Operation Performed - Deviate |
2015-06-24 | Direction Drilling Operation Performed - Horizontal |
2015-07-01 | Finished Drilling |
2015-07-01 | Well Log Performed |
2015-07-01 | Well Mode changed to Drilled and Cased |
2015-07-02 | Production Casing Operation Performed |
2015-07-03 | Rig Released |
2015-07-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-07-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-07-18 | Well Fluid changed to Crude Oil |
2015-07-18 | Well Mode changed to Drilling and Completing |
2015-09-01 | Well Began Production |
2015-09-01 | Well Fluid changed to Crude Oil |
2015-09-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2015-06-22 | 987.90 | Deviate (5 - 79 degrees) |
2015-06-24 | 2049.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-07-15 | Multi-Stage Fracture | 4029.80 | 4030.10 | 0 |
2015-07-16 | Multi-Stage Fracture | 3200.90 | 3202.80 | 0 |
2015-07-16 | Multi-Stage Fracture | 3137.80 | 3139.70 | 0 |
2015-07-16 | Multi-Stage Fracture | 2975.40 | 2977.30 | 0 |
2015-07-16 | Multi-Stage Fracture | 2869.20 | 2871.10 | 0 |
2015-07-16 | Multi-Stage Fracture | 2803.60 | 2805.50 | 0 |
2015-07-16 | Multi-Stage Fracture | 2719.30 | 2721.20 | 0 |
2015-07-16 | Multi-Stage Fracture | 2608.40 | 2610.30 | 0 |
2015-07-16 | Multi-Stage Fracture | 2537.90 | 2539.80 | 0 |
2015-07-16 | Multi-Stage Fracture | 2374.90 | 2376.80 | 0 |
2015-07-16 | Multi-Stage Fracture | 2304.10 | 2306.00 | 0 |
2015-07-15 | Multi-Stage Fracture | 3960.50 | 3962.40 | 0 |
2015-07-16 | Multi-Stage Fracture | 2220.90 | 2222.80 | 0 |
2015-07-16 | Multi-Stage Fracture | 2152.60 | 2154.50 | 0 |
2015-07-16 | Multi-Stage Fracture | 2068.80 | 2070.70 | 0 |
2015-07-15 | Multi-Stage Fracture | 3750.50 | 3752.40 | 0 |
2015-07-15 | Multi-Stage Fracture | 3680.50 | 3682.40 | 0 |
2015-07-15 | Multi-Stage Fracture | 3595.70 | 3597.60 | 0 |
2015-07-15 | Multi-Stage Fracture | 3528.10 | 3530.00 | 0 |
2015-07-15 | Multi-Stage Fracture | 3459.10 | 3461.00 | 0 |
2015-07-15 | Multi-Stage Fracture | 3390.70 | 3392.60 | 0 |
2015-07-16 | Multi-Stage Fracture | 3282.20 | 3284.10 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-07-15 | 2015-07-16 | 1,940 | 0 | N/A |
2 | 2015-07-16 | 2015-07-16 | 1,940 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water (Including Mix Water Supplied by Client)* | Not Available | 100 | 42.8001 | N/A | |||
ClearFRAC XT. N002 | Schlumberger | Quartz. Crystalline silica | 14808-60-7 | 100 | 31.8571 | N/A | ||
ClearFRAC XT. N002 | Schlumberger | Energizing Fluid | 2-hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0601 | N/A | |
Acetic acid ethenyl ester. polymer with ethenol | 25213-24-5 | 100 | 0.0014 | N/A | ||||
Benzenesulfonic acid. 4-ethenyl-. sodium salt. homopolymer | 25704-18-1 | 100 | 0.0149 | N/A | ||||
Erucic amidopropyl dimethyl betaine | 149879-98-1 | 100 | 0.21 | N/A | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 100 | 0.0002 | N/A | ||||
Nitrogen. liquid form | 7727-37-9 | 100 | 24.9006 | N/A | ||||
Polyvinyl acetate. partially hydrolyzed | 304443-60-5 | 100 | 0.0005 | N/A | ||||
Propan-2-ol | 67-63-0 | 100 | 0.1479 | N/A | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 100 | 0.0062 | N/A | ||||
2 | ClearFRAC XT. N002 | Schlumberger | Energizing Fluid | 2-butoxyethanol | Trade Secret | 100 | 0.0023 | N/A |
Acetic acid(impurity) | Trade Secret | 100 | 0 | N/A | ||||
Acetic acid. potassium salt (impurity) | Trade Secret | 100 | 0 | N/A | ||||
Aliphatic alcohol | Trade Secret | 100 | 0.0009 | N/A | ||||
Polyethoxylated alkanol | Trade Secret | 100 | 0.0045 | N/A | ||||
Undecanol. branched and linear (impurity) | Trade Secret | 100 | 0.0001 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-07-06 | 2015-07-09 | Central Water Distribution Facility | 1269 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 2762 | 0.0 | 0.0 | 0.0 |
2016 | 8614 | 0.0 | 0.0 | 0.0 |
2017 | 8309 | 0.0 | 0.0 | 0.0 |
2018 | 8007 | 0.0 | 0.0 | 0.0 |
2019 | 6691 | 0.0 | 0.0 | 0.0 |
2020 | 1900 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-07-03 | No Incident Encountered | 0.00 | 0.00 |
2015-07-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]