If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484012901002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.163643,"lon":-110.107815,"icon":""}]} |
Location: 00/01-29-048-01W4/2 | |
Location Alias: 00/01-29-48-01 W4M | |
Location Alias 2: 00/01-29-048-01 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 01 | |
Section: 29 | |
County/Municipality: County of Vermilion River | |
Well Name: CREW LLOYD 1-29-48-1 | |
Operator Name: Crew Energy Inc. | |
License Number: 0330354 | |
License Date: 2005-05-04 | |
License Status: Suspension | |
Spud Date: 2005-12-01 | |
Final Drill Date: 2005-12-04 | |
Well Total Depth: 671.00 m | |
Surface Hole Latitude: 53.163643 | |
Surface Hole Longitude: -110.107815 |
Date | Event |
---|---|
2005-05-04 | Obtained License |
2005-12-02 | Surface Casing Operation Performed |
2005-12-04 | Finished Drilling |
2005-12-04 | Production Casing Operation Performed |
2005-12-04 | Rig Released |
2005-12-04 | Well Log Performed |
2005-12-04 | Well Mode changed to Drilled and Cased |
2006-01-03 | Perforation Treatment Performed - Jet Perforation |
2006-12-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-12-08 | Perforation Treatment Performed - Jet Perforation |
2006-12-08 | Plug Back Performed |
2006-12-08 | Well Log Performed |
2006-12-15 | Perforation Treatment Performed - Jet Perforation |
2006-12-15 | Well Log Performed |
2007-07-01 | Well Began Production |
2007-07-01 | Well Fluid changed to Gas |
2007-07-01 | Well Mode changed to Flowing |
2014-06-01 | Well Fluid changed to Gas |
2014-06-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-01-03 | Perforation | 610.50 | 611.60 | 26 |
2006-12-08 | Packing Device Capped w/Cement | 594.00 | 602.00 | 0 |
2006-12-08 | Perforation | 575.50 | 576.00 | 17 |
2006-12-15 | Perforation | 521.00 | 522.00 | 17 |
2006-12-15 | Perforation | 518.00 | 519.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 3696 | 0.0 | 0.0 | 0.0 |
2008 | 7660 | 0.0 | 0.0 | 0.0 |
2009 | 8006 | 0.0 | 0.0 | 0.0 |
2010 | 744 | 0.0 | 0.0 | 0.0 |
2011 | 3047 | 0.0 | 0.0 | 0.0 |
For data sources see[5]