If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484090606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.107864,"lon":-111.313776,"icon":""}]} |
Location: 00/06-06-048-09W4/0 | |
Location Alias: 00/06-06-48-09 W4M | |
Location Alias 2: 00/06-06-048-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 09 | |
Section: 06 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: NUL KINSELLA 6-6-48-9 | |
Operator Name: Northwestern Utilities Limited | |
License Number: 0073234 | |
License Date: 1978-11-29 | |
License Status: RecCertified | |
Spud Date: 1978-12-12 | |
Final Drill Date: 1978-12-15 | |
Well Total Depth: 880.00 m | |
Surface Hole Latitude: 53.107864 | |
Surface Hole Longitude: -111.313776 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-11-29 | Obtained License |
1978-12-15 | Finished Drilling |
1978-12-15 | Well Mode changed to Drilled and Cased |
1978-12-17 | Drill Stem Test Performed |
1978-12-18 | Drill Stem Test Performed |
1978-12-19 | Drill Stem Test Performed |
1978-12-20 | Production Casing Operation Performed |
1979-07-11 | Perforation Treatment Performed - Jet Perforation |
1979-07-23 | Perforation Treatment Performed - Fractured |
1979-08-21 | Well Began Production |
1979-08-21 | Well Fluid changed to Crude Oil |
1979-08-21 | Well Mode changed to Pumping |
1980-02-15 | Perforation Treatment Performed - Chemical Squeeze |
1980-02-29 | Well Fluid changed to Crude Oil |
1980-02-29 | Well Mode changed to Suspended |
1987-10-17 | Well Log Performed |
1987-10-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-10-18 | Plug Back Performed |
1987-10-18 | Well Abandoned |
1987-10-18 | Well Fluid changed to Crude Oil |
1987-10-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-07-11 | Perforation | 739.80 | 741.20 | 13 |
1979-07-23 | Fracture | 739.80 | 741.20 | 0 |
1980-02-15 | Chemical Squeeze | 739.80 | 741.20 | 0 |
1987-10-18 | Packing Device Capped w/Cement | 722.00 | 730.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 3012 | 0.0 | 0.0 | 0.0 |
1980 | 261 | 0.0 | 0.0 | 0.0 |
1981 | 162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]