If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0484092402000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.147726,"lon":-111.18271,"icon":""}]} |
| Location: 00/02-24-048-09W4/0 | |
| Location Alias: 00/02-24-48-09 W4M | |
| Location Alias 2: 00/02-24-048-09 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 4 | |
| Range: 09 | |
| Section: 24 | |
| County/Municipality: County of Minburn No. 27 | |
| Well Name: HARVEST 2A VIK-KINS 2-24-48-9 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0094934 | |
| License Date: 1982-02-04 | |
| License Status: RecCertified | |
| Spud Date: 1982-02-23 | |
| Final Drill Date: 1982-03-01 | |
| Well Total Depth: 693.50 m | |
| Surface Hole Latitude: 53.147726 | |
| Surface Hole Longitude: -111.182710 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1982-02-04 | Obtained License |
| 1982-03-01 | Finished Drilling |
| 1982-03-01 | Well Log Performed |
| 1982-03-01 | Well Mode changed to Drilled and Cased |
| 1982-03-02 | Production Casing Operation Performed |
| 1982-04-05 | Perforation Treatment Performed - Jet Perforation |
| 1982-04-06 | Well Began Production |
| 1982-04-06 | Well Fluid changed to Crude Oil |
| 1982-04-06 | Well Mode changed to Pumping |
| 1982-10-07 | Well Log Performed |
| 1982-10-13 | Well Log Performed |
| 1982-11-27 | Well Fluid changed to Crude Oil |
| 1982-11-27 | Well Mode changed to Suspended |
| 1983-11-28 | Well Began Injection |
| 1983-11-28 | Well Fluid changed to Water |
| 1983-11-28 | Well Type changed to Injection |
| 1985-04-11 | Well Log Performed |
| 1988-07-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1988-07-10 | Plug Back Performed |
| 1988-07-10 | Well Log Performed |
| 1995-10-30 | Well Log Performed |
| 1995-10-31 | Well Log Performed |
| 1995-11-01 | Perforation Treatment Performed - Jet Perforation |
| 1995-11-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-11-05 | Perforation Treatment Performed - Remedial Casing |
| 1995-11-06 | Well Log Performed |
| 1995-11-07 | Perforation Treatment Performed - Jet Perforation |
| 1995-11-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-11-08 | Perforation Treatment Performed - Remedial Casing |
| 1995-11-08 | Well Fluid changed to Water |
| 1995-11-08 | Well Mode changed to Abandoned Zone |
| 1995-11-08 | Well Type changed to Injection |
| 1995-11-21 | Well Log Performed |
| 1996-04-08 | Well Abandoned |
| 1996-04-08 | Well Fluid changed to Water |
| 1996-04-08 | Well Mode changed to Abandoned |
| 1996-04-08 | Well Type changed to Injection |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1982-04-05 | Perforation | 653.50 | 657.00 | 13 |
| 1988-07-10 | Packing Device Capped w/Cement | 628.00 | 636.00 | 0 |
| 1995-11-01 | Perforation | 362.50 | 363.50 | 13 |
| 1995-11-04 | Acid Treatment | 362.50 | 363.50 | 0 |
| 1995-11-05 | Remedial Casing Cementing | 362.50 | 363.50 | 0 |
| 1995-11-07 | Perforation | 348.50 | 349.50 | 13 |
| 1995-11-08 | Acid Treatment | 348.50 | 349.50 | 0 |
| 1995-11-08 | Remedial Casing Cementing | 348.50 | 349.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1982 | 4744 | 0.0 | 0.0 | 0.0 |
| 1983 | 0 | 0.0 | 0.0 | 0.0 |
| 1984 | 0 | 0.0 | 0.0 | 0.0 |
| 1985 | 0 | 0.0 | 0.0 | 0.0 |
| 1986 | 0 | 0.0 | 0.0 | 0.0 |
| 1987 | 0 | 0.0 | 0.0 | 0.0 |
| 1988 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]