X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484102410000

Well Details

Well ID: 0484102410000
Loading map...
Location: 00/10-24-048-10W4/0
Location Alias: 00/10-24-48-10 W4M
Location Alias 2: 00/10-24-048-10 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 10
Section: 24
County/Municipality: County of Minburn No. 27
Well Name: PINE CLIFF VIK-KINS 10-24-48-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0300075
License Date: 2003-12-23
License Status: RecCertified
Spud Date: 2004-02-16
Final Drill Date: 2004-02-17
Well Total Depth: 689.00 m
Surface Hole Latitude: 53.154847
Surface Hole Longitude: -111.329591

For data sources see[1][2]

Well History

Date Event
2003-12-23 Obtained License
2004-02-16 Surface Casing Operation Performed
2004-02-17 Finished Drilling
2004-02-17 Production Casing Operation Performed
2004-02-17 Well Mode changed to Drilled and Cased
2004-02-18 Rig Released
2004-02-18 Well Log Performed
2004-02-21 Perforation Treatment Performed - Jet Perforation
2004-02-21 Well Log Performed
2004-03-23 Well Began Production
2004-03-23 Well Fluid changed to Gas
2004-03-23 Well Mode changed to Flowing
2005-03-01 Perforation Treatment Performed - Fractured
2007-05-01 Well Fluid changed to Gas
2007-05-01 Well Mode changed to Suspended
2009-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-24 Plug Back Performed
2009-01-24 Well Fluid changed to Gas
2009-01-24 Well Log Performed
2009-01-24 Well Mode changed to Abandoned Zone
2009-02-07 Well Abandoned
2009-02-07 Well Fluid changed to Gas
2009-02-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-02-21 Perforation 651.50 653.50 20
2004-02-21 Perforation 647.00 649.00 20
2005-03-01 Fracture 647.00 653.50 0
2009-01-24 Packing Device Capped w/Cement 634.00 642.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 309 0.0 0.0 0.0
2005 64 0.0 0.0 0.0

For data sources see[5]

References