If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484103208002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.180172,"lon":-111.424706,"icon":""}]} |
Location: 00/08-32-048-10W4/2 | |
Location Alias: 00/08-32-48-10 W4M | |
Location Alias 2: 00/08-32-048-10 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 10 | |
Section: 32 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PINE CLIFF VIK-KINS 8-32-48-10 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0286521 | |
License Date: 2003-05-01 | |
License Status: Issued | |
Spud Date: 2003-05-28 | |
Final Drill Date: 2003-05-29 | |
Well Total Depth: 850.00 m | |
Surface Hole Latitude: 53.180172 | |
Surface Hole Longitude: -111.424706 |
Date | Event |
---|---|
2003-05-01 | Obtained License |
2003-05-28 | Surface Casing Operation Performed |
2003-05-29 | Finished Drilling |
2003-05-29 | Production Casing Operation Performed |
2003-05-29 | Well Log Performed |
2003-05-29 | Well Mode changed to Drilled and Cased |
2003-05-30 | Rig Released |
2003-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-06-11 | Perforation Treatment Performed - Jet Perforation |
2003-06-11 | Plug Back Performed |
2003-06-11 | Well Log Performed |
2003-06-13 | Perforation Treatment Performed - Jet Perforation |
2003-06-13 | Well Log Performed |
2003-06-16 | Perforation Treatment Performed - Fractured |
2003-07-01 | Well Began Production |
2003-07-01 | Well Fluid changed to Gas |
2003-07-01 | Well Mode changed to Flowing |
2004-10-06 | Well Fluid changed to Coalbed Methane-Coals Only |
2004-10-06 | Well Mode changed to Flowing |
2009-06-04 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-06-04 | Well Mode changed to Suspended |
2009-08-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-08-06 | Plug Back Performed |
2009-08-06 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-08-06 | Well Mode changed to Abandoned Zone |
2009-08-08 | Perforation Treatment Performed - Jet Perforation |
2009-08-08 | Well Log Performed |
2009-08-09 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-06-11 | Perforation | 733.00 | 735.00 | 20 |
2003-06-11 | Packing Device Capped w/Cement | 720.00 | 728.00 | 0 |
2003-06-13 | Perforation | 699.00 | 704.00 | 13 |
2003-06-16 | Fracture | 699.00 | 704.00 | 0 |
2009-08-06 | Packing Device Capped w/Cement | 686.00 | 694.00 | 0 |
2009-08-08 | Perforation | 478.50 | 481.50 | 17 |
2009-08-09 | Fracture | 478.50 | 481.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 4392 | 0.0 | 0.0 | 0.0 |
2004 | 2928 | 0.0 | 0.0 | 0.0 |
2005 | 8759 | 0.0 | 0.0 | 0.0 |
2006 | 8015 | 0.0 | 0.0 | 0.0 |
2007 | 3514 | 0.0 | 0.0 | 0.0 |
For data sources see[5]