If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0484122406003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.150634,"lon":-111.631743,"icon":""}]} |
| Location: 00/06-24-048-12W4/3 | |
| Location Alias: 00/06-24-48-12 W4M | |
| Location Alias 2: 00/06-24-048-12 W4/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 4 | |
| Range: 12 | |
| Section: 24 | |
| County/Municipality: Beaver County | |
| Well Name: LONG RUN VIK-KINS 6-24-48-12 | |
| Operator Name: Long Run Exploration Ltd. | |
| License Number: 0084094 | |
| License Date: 1980-07-11 | |
| License Status: Abandoned | |
| Spud Date: 1980-08-12 | |
| Final Drill Date: 1980-08-15 | |
| Well Total Depth: 864.00 m | |
| Surface Hole Latitude: 53.150634 | |
| Surface Hole Longitude: -111.631743 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1980-07-11 | Obtained License |
| 1980-08-15 | Finished Drilling |
| 1980-08-15 | Well Mode changed to Drilled and Cased |
| 1980-08-16 | Drill Stem Test Performed |
| 1980-08-17 | Drill Stem Test Performed |
| 1980-08-18 | Production Casing Operation Performed |
| 1982-10-25 | Perforation Treatment Performed - Jet Perforation |
| 2000-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-12-15 | Plug Back Performed |
| 2000-12-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-12-17 | Perforation Treatment Performed - Jet Perforation |
| 2000-12-17 | Plug Back Performed |
| 2000-12-17 | Well Log Performed |
| 2000-12-19 | Perforation Treatment Performed - Fractured |
| 2001-02-22 | Well Began Production |
| 2001-02-22 | Well Fluid changed to Gas |
| 2001-02-22 | Well Mode changed to Flowing |
| 2004-03-13 | Well Log Performed |
| 2018-08-01 | Well Fluid changed to Gas |
| 2018-08-01 | Well Mode changed to Suspended |
| 2019-10-30 | Well Log Performed |
| 2019-10-31 | Well Log Performed |
| 2019-11-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-11-08 | Perforation Treatment Performed - Cement Plug |
| 2019-11-08 | Perforation Treatment Performed - Cement Squeeze |
| 2019-11-08 | Perforation Treatment Performed - Jet Perforation |
| 2019-11-08 | Plug Back Performed |
| 2019-11-08 | Well Fluid changed to Gas |
| 2019-11-08 | Well Log Performed |
| 2019-11-08 | Well Mode changed to Abandoned Zone |
| 2019-11-21 | Well Abandoned |
| 2019-11-21 | Well Fluid changed to Gas |
| 2019-11-21 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1982-10-25 | Perforation | 788.50 | 790.00 | 7 |
| 2019-11-08 | Cement Squeeze | 206.00 | 207.00 | 0 |
| 2019-11-08 | Cement Plug | 118.00 | 320.00 | 0 |
| 1982-10-25 | Perforation | 766.50 | 768.50 | 7 |
| 1982-10-25 | Perforation | 771.00 | 772.50 | 7 |
| 2000-12-15 | Packing Device Capped w/Cement | 777.00 | 785.00 | 0 |
| 2000-12-17 | Packing Device Capped w/Cement | 758.00 | 761.00 | 0 |
| 2000-12-17 | Perforation | 747.00 | 750.00 | 13 |
| 2000-12-19 | Fracture | 747.00 | 750.00 | 0 |
| 2019-11-08 | Perforation | 206.00 | 207.00 | 10 |
| 2019-11-08 | Packing Device Capped w/Cement | 671.00 | 732.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 7141 | 0.0 | 0.0 | 0.0 |
| 2002 | 7793 | 0.0 | 0.0 | 0.0 |
| 2003 | 8719 | 0.0 | 0.0 | 0.0 |
| 2004 | 8783 | 0.0 | 0.0 | 0.0 |
| 2005 | 8759 | 0.0 | 0.0 | 0.0 |
| 2006 | 8759 | 0.0 | 0.0 | 0.0 |
| 2007 | 8759 | 0.0 | 0.0 | 0.0 |
| 2008 | 8614 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8739 | 0.0 | 0.0 | 0.0 |
| 2011 | 8759 | 0.0 | 0.0 | 0.0 |
| 2012 | 8783 | 0.0 | 0.0 | 0.0 |
| 2013 | 8757 | 0.0 | 0.0 | 0.0 |
| 2014 | 8759 | 0.0 | 0.0 | 0.0 |
| 2015 | 8567 | 0.0 | 0.0 | 0.0 |
| 2016 | 8765 | 0.0 | 0.0 | 0.0 |
| 2017 | 1944 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-11-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]