If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0484130608002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.107278,"lon":-111.887977,"icon":""}]} |
| Location: 00/08-06-048-13W4/2 | |
| Location Alias: 00/08-06-48-13 W4M | |
| Location Alias 2: 00/08-06-048-13 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 4 | |
| Range: 13 | |
| Section: 06 | |
| County/Municipality: Beaver County | |
| Well Name: PINE CLIFF VIK-KINS 8-6-48-13 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0078709 | |
| License Date: 1979-10-18 | |
| License Status: Abandoned | |
| Spud Date: 1979-10-31 | |
| Final Drill Date: 1979-11-05 | |
| Well Total Depth: 856.00 m | |
| Surface Hole Latitude: 53.107278 | |
| Surface Hole Longitude: -111.887977 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-10-18 | Obtained License |
| 1979-11-03 | Drill Stem Test Performed |
| 1979-11-05 | Finished Drilling |
| 1979-11-05 | Well Mode changed to Drilled and Cased |
| 1979-11-06 | Drill Stem Test Performed |
| 1979-11-07 | Production Casing Operation Performed |
| 1979-12-09 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-03 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-05 | Well Began Production |
| 1993-10-05 | Well Fluid changed to Gas |
| 1993-10-05 | Well Mode changed to Flowing |
| 1999-06-01 | Well Fluid changed to Gas |
| 1999-06-01 | Well Mode changed to Suspended |
| 1999-09-01 | Well Fluid changed to Gas |
| 1999-09-01 | Well Mode changed to Suspended |
| 2000-12-07 | Well Fluid changed to Gas |
| 2000-12-07 | Well Mode changed to Flowing |
| 2003-05-01 | Well Fluid changed to Gas |
| 2003-05-01 | Well Mode changed to Pumping |
| 2009-07-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-07-10 | Plug Back Performed |
| 2009-07-12 | Well Log Performed |
| 2009-07-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-07-14 | Perforation Treatment Performed - Cement Squeeze |
| 2009-07-14 | Plug Back Performed |
| 2009-07-14 | Well Fluid changed to Gas |
| 2009-07-14 | Well Mode changed to Abandoned Zone |
| 2009-07-15 | Perforation Treatment Performed - Jet Perforation |
| 2009-07-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-07-16 | Perforation Treatment Performed - Jet Perforation |
| 2009-07-16 | Perforation Treatment Performed - Remedial Casing |
| 2009-07-16 | Well Log Performed |
| 2009-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-07-17 | Perforation Treatment Performed - Jet Perforation |
| 2009-07-17 | Perforation Treatment Performed - Remedial Casing |
| 2009-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-07-18 | Perforation Treatment Performed - Jet Perforation |
| 2009-07-18 | Perforation Treatment Performed - Remedial Casing |
| 2009-07-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-07-19 | Perforation Treatment Performed - Remedial Casing |
| 2009-08-06 | Well Abandoned |
| 2009-08-06 | Well Fluid changed to Gas |
| 2009-08-06 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1979-12-09 | Perforation | 812.50 | 813.50 | 7 |
| 2009-07-17 | Remedial Casing Cementing | 550.00 | 551.00 | 0 |
| 2009-07-17 | Packing Device Capped w/Cement | 537.00 | 545.00 | 0 |
| 2009-07-17 | Perforation | 425.00 | 426.00 | 20 |
| 2009-07-18 | Remedial Casing Cementing | 425.00 | 426.00 | 0 |
| 2009-07-18 | Packing Device Capped w/Cement | 410.00 | 418.00 | 0 |
| 2009-07-18 | Perforation | 277.00 | 278.00 | 20 |
| 2009-07-19 | Remedial Casing Cementing | 277.00 | 278.00 | 0 |
| 2009-07-19 | Packing Device Capped w/Cement | 264.00 | 272.00 | 0 |
| 1993-10-03 | Perforation | 786.00 | 791.00 | 13 |
| 2009-07-10 | Packing Device Capped w/Cement | 791.00 | 799.00 | 0 |
| 2009-07-14 | Cement Squeeze | 786.00 | 791.00 | 0 |
| 2009-07-14 | Packing Device Capped w/Cement | 771.00 | 779.00 | 0 |
| 2009-07-15 | Perforation | 686.00 | 687.00 | 20 |
| 2009-07-16 | Remedial Casing Cementing | 686.00 | 687.00 | 0 |
| 2009-07-16 | Packing Device Capped w/Cement | 669.00 | 677.00 | 0 |
| 2009-07-16 | Perforation | 550.00 | 551.00 | 20 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1993 | 1588 | 0.0 | 0.0 | 0.0 |
| 1994 | 8518 | 0.0 | 0.0 | 0.0 |
| 1995 | 8745 | 0.0 | 0.0 | 0.0 |
| 1996 | 8783 | 0.0 | 0.0 | 0.0 |
| 1997 | 8698 | 0.0 | 0.0 | 0.0 |
| 1998 | 4192 | 0.0 | 0.0 | 0.0 |
| 2000 | 561 | 0.0 | 0.0 | 0.0 |
| 2001 | 8237 | 0.0 | 0.0 | 0.0 |
| 2002 | 3411 | 0.0 | 0.0 | 0.0 |
| 2003 | 8759 | 0.0 | 0.0 | 0.0 |
| 2004 | 8783 | 0.0 | 0.0 | 0.0 |
| 2005 | 8170 | 0.0 | 0.0 | 0.0 |
| 2006 | 8759 | 0.0 | 0.0 | 0.0 |
| 2007 | 8687 | 0.0 | 0.0 | 0.0 |
| 2008 | 8519 | 0.0 | 0.0 | 0.0 |
| 2009 | 3959 | 0.0 | 0.0 | 0.0 |
For data sources see[5]