If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484170502002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.107801,"lon":-112.452118,"icon":""}]} |
Location: 00/02-05-048-17W4/2 | |
Location Alias: 00/02-05-48-17 W4M | |
Location Alias 2: 00/02-05-048-17 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 17 | |
Section: 05 | |
County/Municipality: Beaver County | |
Well Name: PINE CLIFF BRUCE 2-5-48-17 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0242593 | |
License Date: 2000-09-29 | |
License Status: Abandoned | |
Spud Date: 2000-09-29 | |
Final Drill Date: 2000-10-04 | |
Well Total Depth: 1055.00 m | |
Surface Hole Latitude: 53.107801 | |
Surface Hole Longitude: -112.452118 |
Date | Event |
---|---|
2000-09-29 | Obtained License |
2000-10-01 | Surface Casing Operation Performed |
2000-10-04 | Finished Drilling |
2000-10-04 | Well Log Performed |
2000-10-04 | Well Mode changed to Drilled and Cased |
2000-10-05 | Production Casing Operation Performed |
2000-10-05 | Rig Released |
2000-10-20 | Perforation Treatment Performed - Jet Perforation |
2000-10-20 | Well Mode changed to Drilled and Cased |
2001-02-19 | Well Began Production |
2001-02-19 | Well Fluid changed to Gas |
2001-02-19 | Well Mode changed to Flowing |
2001-05-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-05-17 | Plug Back Performed |
2001-05-17 | Well Fluid changed to Gas |
2001-05-17 | Well Log Performed |
2001-05-17 | Well Mode changed to Flowing |
2001-05-25 | Well Fluid changed to Gas |
2001-05-25 | Well Mode changed to Flowing |
2003-05-17 | Perforation Treatment Performed - Jet Perforation |
2004-01-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-01-20 | Plug Back Performed |
2004-01-20 | Well Fluid changed to Gas |
2004-01-20 | Well Mode changed to Abandoned Zone |
2004-01-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-01-21 | Perforation Treatment Performed - Jet Perforation |
2004-01-21 | Plug Back Performed |
2004-01-21 | Well Log Performed |
2004-01-23 | Well Log Performed |
2004-01-31 | Perforation Treatment Performed - Fractured |
2008-11-26 | Well Log Performed |
2008-11-27 | Well Log Performed |
2010-06-19 | Well Log Performed |
2010-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-11-26 | Plug Back Performed |
2010-11-28 | Perforation Treatment Performed - Jet Perforation |
2010-11-28 | Well Log Performed |
2010-11-29 | Perforation Treatment Performed - Remedial Casing |
2010-12-01 | Perforation Treatment Performed - Jet Perforation |
2010-12-01 | Well Log Performed |
2010-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-12-02 | Perforation Treatment Performed - Remedial Casing |
2011-04-07 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-10-20 | Perforation | 1014.00 | 1015.00 | 17 |
2004-01-21 | Perforation | 818.00 | 820.00 | 20 |
2004-01-21 | Perforation | 811.50 | 813.00 | 20 |
2004-01-31 | Fracture | 811.50 | 834.50 | 0 |
2010-11-26 | Packing Device Capped w/Cement | 792.00 | 800.00 | 0 |
2010-11-28 | Perforation | 609.00 | 611.00 | 17 |
2010-11-29 | Remedial Casing Cementing | 609.00 | 611.00 | 0 |
2010-12-01 | Perforation | 425.00 | 427.00 | 17 |
2010-12-02 | Remedial Casing Cementing | 425.00 | 427.00 | 0 |
2010-12-02 | Packing Device Capped w/Cement | 410.00 | 418.00 | 0 |
2000-10-20 | Perforation | 994.50 | 995.50 | 17 |
2000-10-20 | Perforation | 988.00 | 989.00 | 17 |
2001-05-17 | Packing Device Capped w/Cement | 999.30 | 1007.30 | 0 |
2003-05-17 | Perforation | 975.50 | 976.30 | 20 |
2004-01-20 | Packing Device Capped w/Cement | 986.00 | 994.00 | 0 |
2004-01-21 | Packing Device Capped w/Cement | 961.00 | 969.00 | 0 |
2004-01-21 | Perforation | 833.50 | 834.50 | 20 |
2004-01-21 | Perforation | 823.50 | 825.50 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 4584 | 0.0 | 0.0 | 0.0 |
2002 | 8756 | 0.0 | 0.0 | 0.0 |
2003 | 6831 | 0.0 | 0.0 | 0.0 |
For data sources see[5]