If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484200602020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.107031,"lon":-112.912936,"icon":""}]} |
Location: 02/02-06-048-20W4/0 | |
Location Alias: 02/02-06-48-20 W4M | |
Location Alias 2: 02/02-06-048-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 20 | |
Section: 06 | |
County/Municipality: Camrose County | |
Well Name: BIG VALLEY JOARCAM 2-6-48-20 | |
Operator Name: Big Valley Energy Corporation | |
License Number: 0058325 | |
License Date: 1976-05-25 | |
License Status: RecCertified | |
Spud Date: 1976-06-21 | |
Final Drill Date: 1976-07-04 | |
Well Total Depth: 1005.80 m | |
Surface Hole Latitude: 53.107031 | |
Surface Hole Longitude: -112.912936 |
Date | Event |
---|---|
1976-05-25 | Obtained License |
1976-06-27 | Production Casing Operation Performed |
1976-07-04 | Finished Drilling |
1976-07-04 | Perforation Treatment Performed - Open-Hole Completion |
1976-07-04 | Well Mode changed to Drilled and Cased |
1976-07-05 | Rig Released |
1976-07-05 | Well Log Performed |
1976-10-19 | Well Log Performed |
1976-10-21 | Well Log Performed |
1976-10-22 | Well Log Performed |
1980-03-01 | Well Began Injection |
1980-03-01 | Well Fluid changed to Water |
1980-03-01 | Well Type changed to Injection |
1980-04-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-08-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-12-31 | Well Log Performed |
1984-01-01 | Well Fluid changed to Water |
1984-01-01 | Well Mode changed to Suspended |
1984-01-01 | Well Type changed to Injection |
1996-06-26 | Well Fluid changed to Water |
1996-06-26 | Well Mode changed to Closed |
1996-06-26 | Well Type changed to Injection |
1996-07-31 | Well Began Production |
1996-07-31 | Well Fluid changed to Crude Oil |
1996-07-31 | Well Mode changed to Flowing |
1997-06-17 | Well Fluid changed to Crude Oil |
1997-06-17 | Well Mode changed to Closed |
2000-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-07-17 | Plug Back Performed |
2000-08-15 | Well Abandoned |
2000-08-15 | Well Fluid changed to Crude Oil |
2000-08-15 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-07-04 | Open Hole/Barefoot Completion | 976.00 | 1005.80 | 0 |
1980-04-18 | Acid Treatment | 976.00 | 1005.80 | 0 |
1980-08-25 | Acid Treatment | 976.00 | 1005.80 | 0 |
2000-07-17 | Packing Device Capped w/Cement | 957.00 | 965.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]