If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0484201806000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.139726,"lon":-112.918952,"icon":""}]} |
| Location: 00/06-18-048-20W4/0 | |
| Location Alias: 00/06-18-48-20 W4M | |
| Location Alias 2: 00/06-18-048-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 18 | |
| County/Municipality: Camrose County | |
| Well Name: BIG VALLEY DINANT NO.6-18V-48-20 | |
| Operator Name: Big Valley Energy Corporation | |
| License Number: 0005548 | |
| License Date: 1952-10-28 | |
| License Status: RecCertified | |
| Spud Date: 1952-11-02 | |
| Final Drill Date: 1952-11-05 | |
| Well Total Depth: 996.40 m | |
| Surface Hole Latitude: 53.139726 | |
| Surface Hole Longitude: -112.918952 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1952-10-28 | Obtained License |
| 1952-11-05 | Drill Stem Test Performed |
| 1952-11-05 | Finished Drilling |
| 1952-11-05 | Well Mode changed to Drilled and Cased |
| 1952-11-06 | Production Casing Operation Performed |
| 1952-12-15 | Perforation Treatment Performed - Bullet Perforation |
| 1953-02-01 | Well Began Production |
| 1953-02-01 | Well Fluid changed to Crude Oil |
| 1953-02-01 | Well Mode changed to Pumping |
| 1975-11-01 | Well Fluid changed to Crude Oil |
| 1975-11-01 | Well Mode changed to Suspended |
| 1976-04-21 | Well Fluid changed to Crude Oil |
| 1976-04-21 | Well Mode changed to Pumping |
| 1983-12-01 | Well Fluid changed to Crude Oil |
| 1983-12-01 | Well Mode changed to Suspended |
| 1992-03-09 | Perforation Treatment Performed - Jet Perforation |
| 1992-06-11 | Well Fluid changed to Crude Oil |
| 1992-06-11 | Well Mode changed to Pumping |
| 1993-03-09 | Well Log Performed |
| 1996-06-26 | Well Fluid changed to Crude Oil |
| 1996-06-26 | Well Mode changed to Closed |
| 1996-07-31 | Well Fluid changed to Crude Oil |
| 1996-07-31 | Well Mode changed to Flowing |
| 1997-06-17 | Well Fluid changed to Crude Oil |
| 1997-06-17 | Well Mode changed to Closed |
| 1998-03-15 | Well Log Performed |
| 2000-02-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-02-10 | Perforation Treatment Performed - Jet Perforation |
| 2000-02-10 | Plug Back Performed |
| 2000-02-10 | Well Log Performed |
| 2000-02-24 | Perforation Treatment Performed - Cement Plug |
| 2000-02-24 | Perforation Treatment Performed - Remedial Casing |
| 2000-02-27 | Well Abandoned |
| 2000-02-27 | Well Fluid changed to Crude Oil |
| 2000-02-27 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1952-12-15 | Bullet Perforation | 977.20 | 977.80 | 20 |
| 1992-03-09 | Perforation | 974.50 | 978.00 | 20 |
| 2000-02-10 | Packing Device Capped w/Cement | 953.40 | 962.00 | 0 |
| 2000-02-10 | Perforation | 164.00 | 165.00 | 10 |
| 2000-02-24 | Remedial Casing Cementing | 164.00 | 165.00 | 0 |
| 2000-02-24 | Cement Plug | 120.00 | 165.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 216 | 0.0 | 0.0 | 0.0 |
| 1968 | 264 | 0.0 | 0.0 | 0.0 |
| 1969 | 72 | 0.0 | 0.0 | 0.0 |
| 1970 | 2232 | 0.0 | 0.0 | 0.0 |
| 1971 | 8183 | 0.0 | 0.0 | 0.0 |
| 1972 | 8092 | 0.0 | 0.0 | 0.0 |
| 1973 | 8693 | 0.0 | 0.0 | 0.0 |
| 1974 | 8055 | 0.0 | 0.0 | 0.0 |
| 1975 | 5580 | 0.0 | 0.0 | 0.0 |
| 1976 | 312 | 0.0 | 0.0 | 0.0 |
| 1992 | 4631 | 0.0 | 0.0 | 0.0 |
| 1993 | 8274 | 0.0 | 0.0 | 0.0 |
| 1996 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]