If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484202003000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.14923,"lon":-112.892231,"icon":""}]} |
Location: 00/03-20-048-20W4/0 | |
Location Alias: 00/03-20-48-20 W4M | |
Location Alias 2: 00/03-20-048-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 20 | |
Section: 20 | |
County/Municipality: Camrose County | |
Well Name: OUTLOOK ET AL JOARCAM 3-20-48-20 | |
Operator Name: TAQA North Ltd. | |
License Number: 0255476 | |
License Date: 2001-05-25 | |
License Status: Abandoned | |
Spud Date: 2001-06-14 | |
Final Drill Date: 2001-06-18 | |
Well Total Depth: 1211.00 m | |
Surface Hole Latitude: 53.149230 | |
Surface Hole Longitude: -112.892231 |
Date | Event |
---|---|
2001-05-25 | Obtained License |
2001-06-15 | Surface Casing Operation Performed |
2001-06-18 | Finished Drilling |
2001-06-18 | Well Log Performed |
2001-06-19 | Drill Stem Test Performed |
2001-06-20 | Production Casing Operation Performed |
2001-06-20 | Rig Released |
2001-06-20 | Well Mode changed to Drilled and Cased |
2002-06-20 | Perforation Treatment Performed - Jet Perforation |
2003-01-03 | Well Began Production |
2003-01-03 | Well Fluid changed to Gas |
2003-01-03 | Well Mode changed to Flowing |
2004-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-02-12 | Perforation Treatment Performed - Jet Perforation |
2004-02-12 | Plug Back Performed |
2004-02-12 | Well Fluid changed to Gas |
2004-02-12 | Well Mode changed to Abandoned Zone |
2004-02-13 | Well Log Performed |
2010-07-18 | Well Log Performed |
2010-07-23 | Perforation Treatment Performed - Cement Plug |
2010-07-23 | Plug Back Performed |
2010-07-28 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-06-20 | Perforation | 1163.50 | 1164.50 | 14 |
2002-06-20 | Perforation | 1149.00 | 1150.00 | 14 |
2004-02-12 | Packing Device Capped w/Cement | 1133.00 | 1141.00 | 0 |
2004-02-12 | Perforation | 241.00 | 245.00 | 17 |
2004-02-12 | Perforation | 209.00 | 217.00 | 17 |
2004-02-12 | Perforation | 200.00 | 201.50 | 17 |
2004-02-12 | Perforation | 190.00 | 192.50 | 17 |
2010-07-23 | Cement Plug | 51.70 | 247.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 7910 | 0.0 | 0.0 | 0.0 |
2004 | 902 | 0.0 | 0.0 | 0.0 |
For data sources see[5]