If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484262608002 | ![]() ![]() |
Location: 00/08-26-048-26W4/2 | |
Location Alias: 00/08-26-48-26 W4M | |
Location Alias 2: 00/08-26-048-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 26 | |
Section: 26 | |
County/Municipality: Leduc County | |
Well Name: ALTURA LEDUC-WB 8-26-48-26 | |
Operator Name: Altura Energy Inc. | |
License Number: 0188014 | |
License Date: 1996-05-27 | |
License Status: Issued | |
Spud Date: 1996-07-01 | |
Final Drill Date: 1996-07-08 | |
Well Total Depth: 1502.00 m | |
Surface Hole Latitude: 53.169219 | |
Surface Hole Longitude: -113.688593 |
Date | Event |
---|---|
1996-05-27 | Obtained License |
1996-07-01 | Surface Casing Operation Performed |
1996-07-08 | Finished Drilling |
1996-07-08 | Well Log Performed |
1996-07-08 | Well Mode changed to Drilled and Cased |
1996-07-09 | Production Casing Operation Performed |
1996-07-09 | Rig Released |
1996-08-07 | Well Log Performed |
1996-08-08 | Well Log Performed |
1996-08-09 | Perforation Treatment Performed - Jet Perforation |
1996-08-14 | Perforation Treatment Performed - Cement Squeeze |
1996-08-16 | Perforation Treatment Performed - Jet Perforation |
1996-08-16 | Well Log Performed |
1996-08-22 | Perforation Treatment Performed - Jet Perforation |
1996-08-22 | Well Log Performed |
1996-08-24 | Perforation Treatment Performed - Jet Perforation |
1996-08-24 | Well Log Performed |
1996-08-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-08-27 | Well Log Performed |
1997-03-26 | Perforation Treatment Performed - Fractured |
1997-04-02 | Well Log Performed |
1999-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-09-29 | Plug Back Performed |
1999-09-29 | Well Log Performed |
1999-09-30 | Perforation Treatment Performed - Jet Perforation |
1999-09-30 | Well Mode changed to Drilled and Cased |
1999-10-04 | Perforation Treatment Performed - Fractured |
2001-03-01 | Well Fluid changed to Gas |
2001-03-01 | Well Mode changed to Testing |
2001-05-31 | Well Fluid changed to Gas |
2001-05-31 | Well Mode changed to Test Completed |
2001-06-01 | Well Fluid changed to Gas |
2001-06-01 | Well Mode changed to Testing |
2001-09-01 | Well Began Production |
2001-09-01 | Well Fluid changed to Water |
2001-09-01 | Well Type changed to Source |
2004-08-10 | Perforation Treatment Performed - Jet Perforation |
2004-08-10 | Well Log Performed |
2004-08-12 | Perforation Treatment Performed - Fractured |
2004-08-24 | Perforation Treatment Performed - Jet Perforation |
2004-08-24 | Well Log Performed |
2004-08-27 | Perforation Treatment Performed - Fractured |
2004-08-29 | Perforation Treatment Performed - Jet Perforation |
2004-08-29 | Well Log Performed |
2004-08-30 | Perforation Treatment Performed - Fractured |
2005-01-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-01-28 | Plug Back Performed |
2011-01-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2019-03-01 | Well Fluid changed to Water |
2019-03-01 | Well Mode changed to Suspended |
2019-03-01 | Well Type changed to Source |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-08-09 | Perforation | 1405.80 | 1407.00 | 13 |
1999-10-04 | Fracture | 1198.00 | 1202.00 | 0 |
2004-08-10 | Perforation | 1362.00 | 1372.10 | 17 |
2004-08-12 | Fracture | 1362.00 | 1372.10 | 0 |
2004-08-24 | Perforation | 675.00 | 678.00 | 17 |
2004-08-27 | Fracture | 675.00 | 678.00 | 0 |
2004-08-29 | Perforation | 499.00 | 502.00 | 17 |
2004-08-30 | Fracture | 499.00 | 502.00 | 0 |
2005-01-28 | Packing Device Capped w/Cement | 1347.00 | 1355.00 | 0 |
2011-01-10 | Acid Treatment | 499.00 | 1202.00 | 0 |
1996-08-14 | Cement Squeeze | 1405.80 | 1407.00 | 0 |
1996-08-16 | Perforation | 1392.00 | 1395.20 | 13 |
1996-08-22 | Perforation | 1395.20 | 1396.20 | 14 |
1996-08-24 | Perforation | 1396.20 | 1400.00 | 13 |
1996-08-25 | Acid Treatment | 1392.00 | 1400.00 | 0 |
1997-03-26 | Fracture | 1392.00 | 1400.00 | 0 |
1999-09-29 | Packing Device Capped w/Cement | 1377.70 | 1385.00 | 0 |
1999-09-30 | Perforation | 1198.00 | 1202.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 6098 | 0.0 | 0.0 | 0.0 |
2002 | 7872 | 0.0 | 0.0 | 0.0 |
2003 | 8172 | 0.0 | 0.0 | 0.0 |
2004 | 6283 | 0.0 | 0.0 | 0.0 |
2005 | 7138 | 0.0 | 0.0 | 0.0 |
2006 | 8149 | 0.0 | 0.0 | 0.0 |
2007 | 8489 | 0.0 | 0.0 | 0.0 |
2008 | 7989 | 0.0 | 0.0 | 0.0 |
2009 | 8605 | 0.0 | 0.0 | 0.0 |
2010 | 8194 | 0.0 | 0.0 | 0.0 |
2011 | 8367 | 0.0 | 0.0 | 0.0 |
2012 | 3938 | 0.0 | 0.0 | 0.0 |
2013 | 8577 | 0.0 | 0.0 | 0.0 |
2014 | 8649 | 0.0 | 0.0 | 0.0 |
2015 | 8555 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8628 | 0.0 | 0.0 | 0.0 |
2018 | 7440 | 0.0 | 0.0 | 0.0 |
2019 | 127 | 0.0 | 0.0 | 0.0 |
For data sources see[5]