If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0484270908000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.125057,"lon":-113.881556,"icon":""}]} |
| Location: 00/08-09-048-27W4/0 | |
| Location Alias: 00/08-09-48-27 W4M | |
| Location Alias 2: 00/08-09-048-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 09 | |
| County/Municipality: Leduc County | |
| Well Name: ESSO WIZARD LAKE C.P.R. NO.G-9 | |
| Operator Name: Imperial Oil Resources Limited | |
| License Number: 0006022 | |
| License Date: 1953-02-03 | |
| License Status: Abandoned | |
| Spud Date: 1953-03-26 | |
| Final Drill Date: 1953-04-23 | |
| Well Total Depth: 2051.30 m | |
| Surface Hole Latitude: 53.125057 | |
| Surface Hole Longitude: -113.881556 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1953-02-03 | Obtained License |
| 1953-04-20 | Production Casing Operation Performed |
| 1953-04-23 | Finished Drilling |
| 1953-04-23 | Perforation Treatment Performed - Open-Hole Completion |
| 1953-04-23 | Well Mode changed to Drilled and Cased |
| 1953-04-27 | Well Began Production |
| 1953-04-27 | Well Fluid changed to Crude Oil |
| 1953-04-27 | Well Mode changed to Flowing |
| 1981-05-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-10-11 | Well Log Performed |
| 1985-06-04 | Well Log Performed |
| 1985-06-06 | Perforation Treatment Performed - Open-Hole Completion |
| 1985-06-07 | Well Log Performed |
| 1985-06-12 | Liner Casing Operation Performed |
| 1985-06-12 | Perforation Treatment Performed - Cement Squeeze |
| 1985-06-15 | Well Log Performed |
| 1985-06-16 | Perforation Treatment Performed - Jet Perforation |
| 1985-06-16 | Well Log Performed |
| 1985-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-01-23 | Well Log Performed |
| 1989-01-22 | Perforation Treatment Performed - Cement Squeeze |
| 1989-01-23 | Perforation Treatment Performed - Jet Perforation |
| 1989-01-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-07-10 | Well Log Performed |
| 1992-07-16 | Perforation Treatment Performed - Jet Perforation |
| 1992-07-18 | Well Log Performed |
| 1992-07-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-08-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-08-04 | Perforation Treatment Performed - Jet Perforation |
| 1999-03-01 | Well Fluid changed to Crude Oil |
| 1999-03-01 | Well Mode changed to Suspended |
| 2012-09-06 | Well Log Performed |
| 2012-09-07 | Well Log Performed |
| 2012-09-08 | Well Log Performed |
| 2012-09-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-09-09 | Perforation Treatment Performed - Cement Plug |
| 2012-09-09 | Perforation Treatment Performed - Jet Perforation |
| 2012-09-09 | Perforation Treatment Performed - Remedial Casing |
| 2012-09-09 | Plug Back Performed |
| 2012-09-09 | Well Fluid changed to Crude Oil |
| 2012-09-09 | Well Mode changed to Abandoned Zone |
| 2012-09-10 | Perforation Treatment Performed - Jet Perforation |
| 2012-09-10 | Perforation Treatment Performed - Remedial Casing |
| 2012-09-10 | Well Log Performed |
| 2012-09-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-09-11 | Perforation Treatment Performed - Cement Plug |
| 2012-09-12 | Perforation Treatment Performed - Jet Perforation |
| 2012-09-12 | Well Log Performed |
| 2012-09-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-09-13 | Perforation Treatment Performed - Cement Plug |
| 2012-09-13 | Perforation Treatment Performed - Remedial Casing |
| 2013-05-27 | Well Abandoned |
| 2013-05-27 | Well Fluid changed to Crude Oil |
| 2013-05-27 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1953-04-23 | Open Hole/Barefoot Completion | 1870.30 | 2018.70 | 0 |
| 1989-01-24 | Acid Treatment | 1952.60 | 2019.50 | 0 |
| 1992-07-16 | Perforation | 2023.00 | 2023.50 | 13 |
| 1992-07-16 | Perforation | 2026.50 | 2027.00 | 13 |
| 1992-07-19 | Acid Treatment | 2023.00 | 2023.50 | 0 |
| 1997-08-04 | Perforation | 2030.00 | 2030.30 | 13 |
| 1997-08-04 | Perforation | 2032.00 | 2032.30 | 13 |
| 1997-08-04 | Acid Treatment | 2030.00 | 2032.30 | 0 |
| 1997-08-04 | Acid Treatment | 2030.00 | 2032.30 | 0 |
| 2012-09-09 | Packing Device Capped w/Cement | 1352.00 | 1948.00 | 0 |
| 2012-09-09 | Perforation | 1289.80 | 1290.80 | 17 |
| 1981-05-29 | Acid Treatment | 1870.30 | 2018.70 | 0 |
| 2012-09-09 | Perforation | 740.00 | 741.00 | 17 |
| 2012-09-09 | Remedial Casing Cementing | 740.00 | 1290.80 | 0 |
| 2012-09-09 | Cement Plug | 522.00 | 1352.00 | 0 |
| 2012-09-10 | Perforation | 500.20 | 501.20 | 17 |
| 2012-09-10 | Remedial Casing Cementing | 500.20 | 501.20 | 0 |
| 2012-09-11 | Cement Plug | 492.00 | 501.20 | 0 |
| 2012-09-11 | Packing Device Capped w/Cement | 472.00 | 491.00 | 0 |
| 2012-09-12 | Perforation | 431.00 | 432.00 | 17 |
| 2012-09-12 | Perforation | 355.00 | 356.00 | 17 |
| 2012-09-12 | Perforation | 303.00 | 304.00 | 17 |
| 1985-06-06 | Open Hole/Barefoot Completion | 1870.30 | 2051.30 | 0 |
| 2012-09-12 | Perforation | 256.00 | 257.00 | 17 |
| 2012-09-12 | Perforation | 197.00 | 198.00 | 17 |
| 2012-09-13 | Remedial Casing Cementing | 197.00 | 432.00 | 0 |
| 2012-09-13 | Cement Plug | 187.50 | 472.00 | 0 |
| 2012-09-13 | Packing Device Capped w/Cement | 168.00 | 187.00 | 0 |
| 1985-06-12 | Cement Squeeze | 1820.30 | 2051.30 | 0 |
| 1985-06-16 | Perforation | 2013.10 | 2013.60 | 13 |
| 1985-06-17 | Acid Treatment | 2013.10 | 2013.60 | 0 |
| 1989-01-22 | Cement Squeeze | 2013.10 | 2013.60 | 0 |
| 1989-01-23 | Perforation | 1952.60 | 1953.10 | 13 |
| 1989-01-23 | Perforation | 2018.50 | 2019.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 1145 | 0.0 | 0.0 | 0.0 |
| 1970 | 1979 | 0.0 | 0.0 | 0.0 |
| 1971 | 3131 | 0.0 | 0.0 | 0.0 |
| 1972 | 425 | 0.0 | 0.0 | 0.0 |
| 1973 | 139 | 0.0 | 0.0 | 0.0 |
| 1974 | 840 | 0.0 | 0.0 | 0.0 |
| 1975 | 611 | 0.0 | 0.0 | 0.0 |
| 1976 | 3998 | 0.0 | 0.0 | 0.0 |
| 1977 | 4768 | 0.0 | 0.0 | 0.0 |
| 1978 | 2792 | 0.0 | 0.0 | 0.0 |
| 1979 | 4866 | 0.0 | 0.0 | 0.0 |
| 1980 | 3858 | 0.0 | 0.0 | 0.0 |
| 1981 | 5930 | 0.0 | 0.0 | 0.0 |
| 1982 | 5610 | 0.0 | 0.0 | 0.0 |
| 1983 | 4995 | 0.0 | 0.0 | 0.0 |
| 1984 | 8553 | 0.0 | 0.0 | 0.0 |
| 1985 | 8108 | 0.0 | 0.0 | 0.0 |
| 1986 | 8334 | 0.0 | 0.0 | 0.0 |
| 1987 | 8711 | 0.0 | 0.0 | 0.0 |
| 1988 | 8625 | 0.0 | 0.0 | 0.0 |
| 1989 | 7617 | 0.0 | 0.0 | 0.0 |
| 1990 | 8508 | 0.0 | 0.0 | 0.0 |
| 1991 | 8200 | 0.0 | 0.0 | 0.0 |
| 1992 | 7151 | 0.0 | 0.0 | 0.0 |
| 1993 | 6287 | 0.0 | 0.0 | 0.0 |
| 1994 | 6930 | 0.0 | 0.0 | 0.0 |
| 1995 | 7578 | 0.0 | 0.0 | 0.0 |
| 1996 | 8465 | 0.0 | 0.0 | 0.0 |
| 1997 | 6753 | 0.0 | 0.0 | 0.0 |
| 1998 | 1750 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-09-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]