If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485030413020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.114988,"lon":-114.365391,"icon":""}]} |
| Location: 02/13-04-048-03W5/0 | |
| Location Alias: 02/13-04-48-03 W5M | |
| Location Alias 2: 02/13-04-048-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 04 | |
| County/Municipality: Leduc County | |
| Well Name: WHITECAP PEMBINA 13-4-48-3 | |
| Operator Name: Whitecap Resources Inc. | |
| License Number: 0447443 | |
| License Date: 2012-07-27 | |
| License Status: Issued | |
| Spud Date: 2012-08-01 | |
| Final Drill Date: 2012-08-09 | |
| Well Total Depth: 2860.00 m | |
| Surface Hole Latitude: 53.114988 | |
| Surface Hole Longitude: -114.365391 |
| Date | Event |
|---|---|
| 2012-07-27 | Obtained License |
| 2012-08-02 | Surface Casing Operation Performed |
| 2012-08-02 | Well Log Performed |
| 2012-08-05 | Direction Drilling Operation Performed - Horizontal |
| 2012-08-05 | Intermediate Casing Operation Performed |
| 2012-08-09 | Finished Drilling |
| 2012-08-09 | Well Mode changed to Drilled and Cased |
| 2012-08-10 | Liner Casing Operation Performed |
| 2012-08-10 | Rig Released |
| 2012-08-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-14 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-08-14 | Well Log Performed |
| 2012-08-24 | Well Began Production |
| 2012-08-24 | Well Fluid changed to Crude Oil |
| 2012-08-24 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-02 | Nabors Drilling Limited | 12 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-05 | 1458.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-08-14 | Open Hole/Barefoot Completion | 2858.00 | 2860.00 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2194.10 | 2194.20 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2119.20 | 2119.30 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2045.10 | 2045.20 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 1960.80 | 1960.90 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 1885.70 | 1885.80 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 1810.60 | 1810.70 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 1723.70 | 1723.80 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 1651.40 | 1651.50 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 1579.20 | 1579.30 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 1493.60 | 1493.70 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2821.10 | 2821.20 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2745.70 | 2745.80 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2659.50 | 2659.60 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2587.10 | 2587.20 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2512.00 | 2512.10 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2425.10 | 2425.20 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2351.70 | 2351.80 | 0 |
| 2012-08-14 | Multi-Stage Fracture | 2267.80 | 2267.90 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 3062 | 0.0 | 0.0 | 0.0 |
| 2013 | 8710 | 0.0 | 0.0 | 0.0 |
| 2014 | 8567 | 0.0 | 0.0 | 0.0 |
| 2015 | 8733 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8678 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-10 | No Incident Encountered | 0.00 | 0.00 |
| 2012-08-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]