X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485083308030

Well Details

Well ID: 0485083308030
Loading map...
Location: 03/08-33-048-08W5/0
Location Alias: 03/08-33-48-08 W5M
Location Alias 2: 03/08-33-048-08 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 33
County/Municipality: Brazeau County
Well Name: INPLAY OIL HZ 103 PEMBINA 8-33-48-8
Operator Name: InPlay Oil Corp.
License Number: 0481474
License Date: 2016-11-16
License Status: Issued
Spud Date: 2016-12-02
Final Drill Date: 2016-12-09
Well Total Depth: 3140.00 m
Surface Hole Latitude: 53.182974
Surface Hole Longitude: -115.125985

For data sources see[1][2]

Well History

Date Event
2016-11-16 Obtained License
2016-12-04 Surface Casing Operation Performed
2016-12-05 Direction Drilling Operation Performed - Deviate
2016-12-06 Direction Drilling Operation Performed - Horizontal
2016-12-09 Finished Drilling
2016-12-09 Well Log Performed
2016-12-09 Well Mode changed to Drilled and Cased
2016-12-10 Production Casing Operation Performed
2016-12-11 Rig Released
2017-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-10 Well Began Production
2017-02-10 Well Fluid changed to Crude Oil
2017-02-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-02 Bonanza Drilling Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-12-05 1230.00 Deviate (5 - 79 degrees)
2016-12-06 1706.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-22 Multi-Stage Fracture 3111.00 3111.20 0
2017-01-22 Multi-Stage Fracture 2696.50 2696.70 0
2017-01-22 Multi-Stage Fracture 2650.20 2650.40 0
2017-01-22 Multi-Stage Fracture 2604.00 2604.20 0
2017-01-22 Multi-Stage Fracture 2558.70 2558.90 0
2017-01-22 Multi-Stage Fracture 2512.50 2512.70 0
2017-01-22 Multi-Stage Fracture 2466.20 2466.40 0
2017-01-22 Multi-Stage Fracture 2419.90 2420.10 0
2017-01-22 Multi-Stage Fracture 2373.70 2373.90 0
2017-01-23 Multi-Stage Fracture 2327.40 2327.60 0
2017-01-23 Multi-Stage Fracture 2281.20 2281.40 0
2017-01-22 Multi-Stage Fracture 3066.60 3066.80 0
2017-01-23 Multi-Stage Fracture 2234.90 2235.10 0
2017-01-23 Multi-Stage Fracture 2188.60 2188.80 0
2017-01-23 Multi-Stage Fracture 2142.30 2142.50 0
2017-01-23 Multi-Stage Fracture 2096.10 2096.30 0
2017-01-23 Multi-Stage Fracture 2049.90 2050.10 0
2017-01-23 Multi-Stage Fracture 2003.60 2003.80 0
2017-01-23 Multi-Stage Fracture 1958.70 1958.90 0
2017-01-23 Multi-Stage Fracture 1912.40 1912.60 0
2017-01-23 Multi-Stage Fracture 1866.20 1866.40 0
2017-01-23 Multi-Stage Fracture 1819.90 1820.10 0
2017-01-22 Multi-Stage Fracture 3020.30 3020.50 0
2017-01-23 Multi-Stage Fracture 1773.60 1773.80 0
2017-01-22 Multi-Stage Fracture 2974.00 2974.20 0
2017-01-22 Multi-Stage Fracture 2927.80 2928.00 0
2017-01-22 Multi-Stage Fracture 2881.50 2881.70 0
2017-01-22 Multi-Stage Fracture 2835.20 2835.40 0
2017-01-22 Multi-Stage Fracture 2789.00 2789.20 0
2017-01-22 Multi-Stage Fracture 2742.80 2743.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-22 2017-01-23 1,549 2,962 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.7004 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 14.0559 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0101 N/A
2-mercaptoethanol 60-24-2 100 0.0101 N/A
dibromoacetonitrile 3252-43-5 100 0.0102 N/A
non-hazardous ingredients Not Available 100 0.0101 N/A
sodium bromide 7647-15-6 100 0.0101 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1602 N/A
non-hazardous ingredients Not Available 100 0.1602 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0044 N/A
propylene glycol 57-55-6 100 0.0044 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0257 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.043 N/A
methanol 67-56-1 100 0.043 N/A
water Not Available 100 0.043 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-19 2017-01-26 Surface Water - Runoff 3903

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 7739 0.0 0.0 0.0
2018 8603 0.0 0.0 0.0
2019 8747 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-11 No Incident Encountered 0.00 0.00
2017-01-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References