X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485100704000

Well Details

Well ID: 0485100704000
Loading map...
Location: 00/04-07-048-10W5/0
Location Alias: 00/04-07-48-10 W5M
Location Alias 2: 00/04-07-048-10 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 10
Section: 07
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 4-7-48-10
Operator Name: Ridgeback Resources Inc.
License Number: 0425092
License Date: 2010-10-26
License Status: Issued
Spud Date: 2010-10-28
Final Drill Date: 2010-11-08
Well Total Depth: 3439.00 m
Surface Hole Latitude: 53.137622
Surface Hole Longitude: -115.461703

For data sources see[1][2]

Well History

Date Event
2010-10-26 Obtained License
2010-10-29 Surface Casing Operation Performed
2010-10-30 Well Log Performed
2010-11-01 Direction Drilling Operation Performed - Horizontal
2010-11-08 Finished Drilling
2010-11-08 Perforation Treatment Performed - Open-Hole Completion
2010-11-08 Well Log Performed
2010-11-08 Well Mode changed to Drilled and Cased
2010-11-10 Liner Casing Operation Performed
2010-11-10 Production Casing Operation Performed
2010-11-11 Rig Released
2010-11-25 Well Log Performed
2010-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-16 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-17 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-18 Well Began Production
2010-12-18 Well Fluid changed to Crude Oil
2010-12-18 Well Mode changed to Flowing
2013-08-24 Well Log Performed
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-01 1382.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-08 Open Hole/Barefoot Completion 3434.00 3439.00 0
2010-12-16 Multi-Stage Fracture 2877.60 2877.70 0
2010-12-16 Multi-Stage Fracture 2807.10 2807.20 0
2010-12-16 Multi-Stage Fracture 2747.80 2747.90 0
2010-12-16 Multi-Stage Fracture 2677.70 2677.80 0
2010-12-16 Multi-Stage Fracture 2618.30 2618.40 0
2010-12-17 Multi-Stage Fracture 2548.60 2548.70 0
2010-12-17 Multi-Stage Fracture 2488.90 2489.00 0
2010-12-17 Multi-Stage Fracture 2418.60 2418.70 0
2010-12-17 Multi-Stage Fracture 2359.30 2359.40 0
2010-12-17 Multi-Stage Fracture 2288.50 2288.60 0
2010-12-15 Multi-Stage Fracture 3401.10 3401.20 0
2010-12-17 Multi-Stage Fracture 2229.10 2229.20 0
2010-12-17 Multi-Stage Fracture 2159.00 2159.10 0
2010-12-15 Multi-Stage Fracture 3335.30 3335.40 0
2010-12-15 Multi-Stage Fracture 3265.80 3265.90 0
2010-12-16 Multi-Stage Fracture 3206.40 3206.50 0
2010-12-16 Multi-Stage Fracture 3136.50 3136.60 0
2010-12-16 Multi-Stage Fracture 3066.50 3066.60 0
2010-12-16 Multi-Stage Fracture 3007.20 3007.30 0
2010-12-16 Multi-Stage Fracture 2936.80 2936.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 24 0.0 0.0 0.0
2011 7080 0.0 0.0 0.0
2012 8703 0.0 0.0 0.0
2013 7828 0.0 0.0 0.0
2014 8352 0.0 0.0 0.0
2015 8665 0.0 0.0 0.0
2016 8567 0.0 0.0 0.0
2017 8586 0.0 0.0 0.0
2018 7481 0.0 0.0 0.0
2019 6110 0.0 0.0 0.0
2020 2000 0.0 0.0 0.0

For data sources see[6]

References