If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485101914020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.145712,"lon":-115.461066,"icon":""}]} |
| Location: 02/14-19-048-10W5/0 | |
| Location Alias: 02/14-19-48-10 W5M | |
| Location Alias 2: 02/14-19-048-10 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 10 | |
| Section: 19 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK PEMBINA 14-19-48-10 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0440132 | |
| License Date: 2011-12-02 | |
| License Status: Issued | |
| Spud Date: 2011-12-03 | |
| Final Drill Date: 2011-12-14 | |
| Well Total Depth: 3705.00 m | |
| Surface Hole Latitude: 53.145712 | |
| Surface Hole Longitude: -115.461066 |
| Date | Event |
|---|---|
| 2011-12-02 | Obtained License |
| 2011-12-04 | Surface Casing Operation Performed |
| 2011-12-05 | Well Log Performed |
| 2011-12-06 | Direction Drilling Operation Performed - Horizontal |
| 2011-12-08 | Well Log Performed |
| 2011-12-14 | Finished Drilling |
| 2011-12-14 | Well Log Performed |
| 2011-12-14 | Well Mode changed to Drilled and Cased |
| 2011-12-16 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-12-16 | Production Casing Operation Performed |
| 2011-12-17 | Rig Released |
| 2011-12-27 | Well Log Performed |
| 2012-01-05 | Well Log Performed |
| 2012-01-11 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2012-01-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-01-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-01-15 | Well Began Production |
| 2012-01-15 | Well Fluid changed to Crude Oil |
| 2012-01-15 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-12-06 | 1394.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-12-16 | Open Hole/Barefoot Completion | 3704.00 | 3705.00 | 0 |
| 2012-01-13 | Multi-Stage Fracture | 3094.70 | 3094.80 | 0 |
| 2012-01-13 | Multi-Stage Fracture | 3033.60 | 3033.70 | 0 |
| 2012-01-14 | Multi-Stage Fracture | 2959.60 | 2959.70 | 0 |
| 2012-01-14 | Multi-Stage Fracture | 2900.10 | 2900.20 | 0 |
| 2012-01-14 | Multi-Stage Fracture | 2827.20 | 2827.30 | 0 |
| 2012-01-14 | Multi-Stage Fracture | 2754.40 | 2754.50 | 0 |
| 2012-01-14 | Multi-Stage Fracture | 2574.00 | 2574.10 | 0 |
| 2012-01-14 | Multi-Stage Fracture | 2500.00 | 2500.10 | 0 |
| 2012-01-14 | Multi-Stage Fracture | 2438.70 | 2438.80 | 0 |
| 2012-01-14 | Multi-Stage Fracture | 2363.30 | 2363.40 | 0 |
| 2012-01-11 | Bridge Plug, No Cement | 2159.50 | 2165.50 | 0 |
| 2012-01-14 | Multi-Stage Fracture | 2301.60 | 2301.70 | 0 |
| 2012-01-13 | Multi-Stage Fracture | 3680.30 | 3680.40 | 0 |
| 2012-01-13 | Multi-Stage Fracture | 3602.10 | 3602.20 | 0 |
| 2012-01-13 | Multi-Stage Fracture | 3554.80 | 3554.90 | 0 |
| 2012-01-13 | Multi-Stage Fracture | 3375.60 | 3375.70 | 0 |
| 2012-01-13 | Multi-Stage Fracture | 3300.70 | 3300.80 | 0 |
| 2012-01-13 | Multi-Stage Fracture | 3241.00 | 3241.10 | 0 |
| 2012-01-13 | Multi-Stage Fracture | 3168.20 | 3168.30 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 8001 | 0.0 | 0.0 | 0.0 |
| 2013 | 8675 | 0.0 | 0.0 | 0.0 |
| 2014 | 8260 | 0.0 | 0.0 | 0.0 |
| 2015 | 8668 | 0.0 | 0.0 | 0.0 |
| 2016 | 8562 | 0.0 | 0.0 | 0.0 |
| 2017 | 8558 | 0.0 | 0.0 | 0.0 |
| 2018 | 7512 | 0.0 | 0.0 | 0.0 |
| 2019 | 6769 | 0.0 | 0.0 | 0.0 |
| 2020 | 2108 | 0.0 | 0.0 | 0.0 |
For data sources see[6]