X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485103003000

Well Details

Well ID: 0485103003000
Loading map...
Location: 00/03-30-048-10W5/0
Location Alias: 00/03-30-48-10 W5M
Location Alias 2: 00/03-30-048-10 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 10
Section: 30
County/Municipality: Brazeau County
Well Name: RIDGEBACK HZ PEMBINA 3-30-48-10
Operator Name: Ridgeback Resources Inc.
License Number: 0486516
License Date: 2017-11-24
License Status: Issued
Spud Date: 2018-02-16
Final Drill Date: 2018-02-21
Well Total Depth: 3562.00 m
Surface Hole Latitude: 53.180300
Surface Hole Longitude: -115.462275

For data sources see[1][2]

Well History

Date Event
2017-11-24 Obtained License
2018-02-17 Surface Casing Operation Performed
2018-02-18 Direction Drilling Operation Performed - Deviate
2018-02-19 Direction Drilling Operation Performed - Horizontal
2018-02-21 Finished Drilling
2018-02-21 Well Log Performed
2018-02-21 Well Mode changed to Drilled and Cased
2018-02-23 Perforation Treatment Performed - Open-Hole Completion
2018-02-23 Production Casing Operation Performed
2018-02-23 Rig Released
2018-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-16 Well Began Production
2018-03-16 Well Fluid changed to Crude Oil
2018-03-16 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-16 Precision Drilling Corporation 183 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-18 1363.20 Deviate (5 - 79 degrees)
2018-02-19 2005.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-23 Open Hole/Barefoot Completion 3555.00 3562.00 0
2018-03-10 Multi-Stage Fracture 3119.00 3119.10 0
2018-03-10 Multi-Stage Fracture 3062.90 3063.00 0
2018-03-10 Multi-Stage Fracture 3021.00 3021.10 0
2018-03-10 Multi-Stage Fracture 2966.10 2966.20 0
2018-03-10 Multi-Stage Fracture 2910.20 2910.30 0
2018-03-10 Multi-Stage Fracture 2855.10 2855.20 0
2018-03-10 Multi-Stage Fracture 2813.00 2813.10 0
2018-03-10 Multi-Stage Fracture 2758.80 2758.90 0
2018-03-10 Multi-Stage Fracture 2703.30 2703.40 0
2018-03-10 Multi-Stage Fracture 2648.00 2648.10 0
2018-03-09 Multi-Stage Fracture 3532.90 3533.00 0
2018-03-10 Multi-Stage Fracture 2592.70 2592.80 0
2018-03-10 Multi-Stage Fracture 2550.70 2550.80 0
2018-03-10 Multi-Stage Fracture 2494.70 2494.80 0
2018-03-10 Multi-Stage Fracture 2438.80 2438.90 0
2018-03-10 Multi-Stage Fracture 2397.20 2397.30 0
2018-03-10 Multi-Stage Fracture 2341.60 2341.70 0
2018-03-10 Multi-Stage Fracture 2286.00 2286.10 0
2018-03-10 Multi-Stage Fracture 2231.30 2231.40 0
2018-03-10 Multi-Stage Fracture 2176.80 2176.90 0
2018-03-10 Multi-Stage Fracture 2135.10 2135.20 0
2018-03-09 Multi-Stage Fracture 3487.20 3487.30 0
2018-03-10 Multi-Stage Fracture 2080.70 2080.80 0
2018-03-10 Multi-Stage Fracture 2039.30 2039.40 0
2018-03-09 Multi-Stage Fracture 3435.70 3435.80 0
2018-03-09 Multi-Stage Fracture 3383.80 3383.90 0
2018-03-09 Multi-Stage Fracture 3327.80 3327.90 0
2018-03-09 Multi-Stage Fracture 3272.20 3272.30 0
2018-03-09 Multi-Stage Fracture 3216.70 3216.80 0
2018-03-09 Multi-Stage Fracture 3174.30 3174.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-09 2018-03-10 1,782 4,761 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 95.4215 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 2.9243 N/A
40/70 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 1.6541 N/A
ELECIDE - 1L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0018 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0018 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0095 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0095 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0894 N/A
Tergitol 15-S-20 68131-40-8 100 0.0894 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0955 N/A
Methanol 67-56-1 100 0.0955 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0955 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-01 2018-03-04 Surface Water - Lake 4795

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6785 0.0 0.0 0.0
2019 8700 0.0 0.0 0.0
2020 1975 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-23 No Incident Encountered 0.00 0.00
2018-03-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References