If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485103003000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.1803,"lon":-115.462275,"icon":""}]} |
| Location: 00/03-30-048-10W5/0 | |
| Location Alias: 00/03-30-48-10 W5M | |
| Location Alias 2: 00/03-30-048-10 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 10 | |
| Section: 30 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK HZ PEMBINA 3-30-48-10 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0486516 | |
| License Date: 2017-11-24 | |
| License Status: Issued | |
| Spud Date: 2018-02-16 | |
| Final Drill Date: 2018-02-21 | |
| Well Total Depth: 3562.00 m | |
| Surface Hole Latitude: 53.180300 | |
| Surface Hole Longitude: -115.462275 |
| Date | Event |
|---|---|
| 2017-11-24 | Obtained License |
| 2018-02-17 | Surface Casing Operation Performed |
| 2018-02-18 | Direction Drilling Operation Performed - Deviate |
| 2018-02-19 | Direction Drilling Operation Performed - Horizontal |
| 2018-02-21 | Finished Drilling |
| 2018-02-21 | Well Log Performed |
| 2018-02-21 | Well Mode changed to Drilled and Cased |
| 2018-02-23 | Perforation Treatment Performed - Open-Hole Completion |
| 2018-02-23 | Production Casing Operation Performed |
| 2018-02-23 | Rig Released |
| 2018-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-03-16 | Well Began Production |
| 2018-03-16 | Well Fluid changed to Crude Oil |
| 2018-03-16 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2018-02-16 | Precision Drilling Corporation | 183 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-02-18 | 1363.20 | Deviate (5 - 79 degrees) |
| 2018-02-19 | 2005.20 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-02-23 | Open Hole/Barefoot Completion | 3555.00 | 3562.00 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 3119.00 | 3119.10 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 3062.90 | 3063.00 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 3021.00 | 3021.10 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2966.10 | 2966.20 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2910.20 | 2910.30 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2855.10 | 2855.20 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2813.00 | 2813.10 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2758.80 | 2758.90 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2703.30 | 2703.40 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2648.00 | 2648.10 | 0 |
| 2018-03-09 | Multi-Stage Fracture | 3532.90 | 3533.00 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2592.70 | 2592.80 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2550.70 | 2550.80 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2494.70 | 2494.80 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2438.80 | 2438.90 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2397.20 | 2397.30 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2341.60 | 2341.70 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2286.00 | 2286.10 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2231.30 | 2231.40 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2176.80 | 2176.90 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2135.10 | 2135.20 | 0 |
| 2018-03-09 | Multi-Stage Fracture | 3487.20 | 3487.30 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2080.70 | 2080.80 | 0 |
| 2018-03-10 | Multi-Stage Fracture | 2039.30 | 2039.40 | 0 |
| 2018-03-09 | Multi-Stage Fracture | 3435.70 | 3435.80 | 0 |
| 2018-03-09 | Multi-Stage Fracture | 3383.80 | 3383.90 | 0 |
| 2018-03-09 | Multi-Stage Fracture | 3327.80 | 3327.90 | 0 |
| 2018-03-09 | Multi-Stage Fracture | 3272.20 | 3272.30 | 0 |
| 2018-03-09 | Multi-Stage Fracture | 3216.70 | 3216.80 | 0 |
| 2018-03-09 | Multi-Stage Fracture | 3174.30 | 3174.40 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-03-09 | 2018-03-10 | 1,782 | 4,761 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 95.4215 | N/A | |||
| 30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.9243 | N/A | ||
| 40/70 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.6541 | N/A | ||
| ELECIDE - 1L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0018 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0018 | N/A | ||||
| ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0095 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0095 | N/A | ||||
| ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0894 | N/A | |
| Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0894 | N/A | ||||
| ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0955 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0955 | N/A | ||||
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0955 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2018-03-01 | 2018-03-04 | Surface Water - Lake | 4795 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2018 | 6785 | 0.0 | 0.0 | 0.0 |
| 2019 | 8700 | 0.0 | 0.0 | 0.0 |
| 2020 | 1975 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-02-23 | No Incident Encountered | 0.00 | 0.00 |
| 2018-03-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]