X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111003000

Well Details

Well ID: 0485111003000
Loading map...
Location: 00/03-10-048-11W5/0
Location Alias: 00/03-10-48-11 W5M
Location Alias 2: 00/03-10-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 10
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 3-10-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0418349
License Date: 2010-02-05
License Status: Amended
Spud Date: 2010-02-11
Final Drill Date: 2010-03-02
Well Total Depth: 2737.00 m
Surface Hole Latitude: 53.120734
Surface Hole Longitude: -115.511984

For data sources see[1][2]

Well History

Date Event
2010-02-05 Obtained License
2010-02-13 Surface Casing Operation Performed
2010-02-20 Direction Drilling Operation Performed - Horizontal
2010-02-24 Intermediate Casing Operation Performed
2010-03-02 Finished Drilling
2010-03-02 Well Mode changed to Drilled and Cased
2010-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-07 Liner Casing Operation Performed
2010-03-07 Perforation Treatment Performed - Open-Hole Completion
2010-03-07 Rig Released
2010-10-28 Well Began Production
2010-10-28 Well Fluid changed to Crude Oil
2010-10-28 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-20 1610.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-05 Multi-Stage Fracture 2635.20 2635.30 0
2010-03-05 Multi-Stage Fracture 2190.40 2190.50 0
2010-03-05 Multi-Stage Fracture 2145.00 2145.10 0
2010-03-05 Multi-Stage Fracture 2099.50 2099.60 0
2010-03-05 Multi-Stage Fracture 2041.40 2041.50 0
2010-03-05 Multi-Stage Fracture 1983.80 1983.90 0
2010-03-07 Open Hole/Barefoot Completion 2639.00 2737.00 0
2010-03-05 Multi-Stage Fracture 2591.60 2591.70 0
2010-03-05 Multi-Stage Fracture 2546.20 2546.30 0
2010-03-05 Multi-Stage Fracture 2500.70 2500.80 0
2010-03-05 Multi-Stage Fracture 2443.00 2443.10 0
2010-03-05 Multi-Stage Fracture 2397.50 2397.60 0
2010-03-05 Multi-Stage Fracture 2339.30 2339.40 0
2010-03-05 Multi-Stage Fracture 2293.90 2294.00 0
2010-03-05 Multi-Stage Fracture 2248.60 2248.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1093 0.0 0.0 0.0
2011 6620 0.0 0.0 0.0
2012 7722 0.0 0.0 0.0
2013 8614 0.0 0.0 0.0
2014 8682 0.0 0.0 0.0
2015 8386 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 8712 0.0 0.0 0.0
2018 6655 0.0 0.0 0.0
2019 7078 0.0 0.0 0.0
2020 1067 0.0 0.0 0.0

For data sources see[6]

References