If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485111012000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.125348,"lon":-115.510119,"icon":""}]} |
| Location: 00/12-10-048-11W5/0 | |
| Location Alias: 00/12-10-48-11 W5M | |
| Location Alias 2: 00/12-10-048-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 10 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK PEMBINA 12-10-48-11 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0448025 | |
| License Date: 2012-08-28 | |
| License Status: Issued | |
| Spud Date: 2012-09-30 | |
| Final Drill Date: 2012-10-14 | |
| Well Total Depth: 3505.00 m | |
| Surface Hole Latitude: 53.125348 | |
| Surface Hole Longitude: -115.510119 |
| Date | Event |
|---|---|
| 2012-08-28 | Obtained License |
| 2012-10-02 | Surface Casing Operation Performed |
| 2012-10-02 | Well Log Performed |
| 2012-10-04 | Direction Drilling Operation Performed - Deviate |
| 2012-10-06 | Direction Drilling Operation Performed - Horizontal |
| 2012-10-10 | Production Casing Operation Performed |
| 2012-10-14 | Finished Drilling |
| 2012-10-14 | Well Log Performed |
| 2012-10-14 | Well Mode changed to Drilled and Cased |
| 2012-10-17 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-10-17 | Rig Released |
| 2012-10-19 | Well Log Performed |
| 2012-11-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-11-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-12-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-12-02 | Well Began Production |
| 2012-12-02 | Well Fluid changed to Crude Oil |
| 2012-12-02 | Well Mode changed to Flowing |
| 2012-12-04 | Well Log Performed |
| 2013-01-18 | Well Fluid changed to Crude Oil |
| 2013-01-18 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-09-30 | Ironhand Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-10-04 | 1442.00 | Deviate (5 - 79 degrees) |
| 2012-10-06 | 2054.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-10-17 | Open Hole/Barefoot Completion | 3499.00 | 3505.00 | 0 |
| 2012-11-30 | Multi-Stage Fracture | 2920.00 | 2920.10 | 0 |
| 2012-11-30 | Multi-Stage Fracture | 2859.20 | 2859.30 | 0 |
| 2012-12-01 | Multi-Stage Fracture | 2783.80 | 2783.90 | 0 |
| 2012-12-01 | Multi-Stage Fracture | 2722.60 | 2722.70 | 0 |
| 2012-12-01 | Multi-Stage Fracture | 2646.30 | 2646.40 | 0 |
| 2012-12-01 | Multi-Stage Fracture | 2587.40 | 2587.50 | 0 |
| 2012-12-01 | Multi-Stage Fracture | 2513.50 | 2513.60 | 0 |
| 2012-12-01 | Multi-Stage Fracture | 2453.20 | 2453.30 | 0 |
| 2012-12-01 | Multi-Stage Fracture | 2377.40 | 2377.50 | 0 |
| 2012-12-01 | Multi-Stage Fracture | 2315.70 | 2315.80 | 0 |
| 2012-11-29 | Multi-Stage Fracture | 3475.30 | 3475.40 | 0 |
| 2012-12-01 | Multi-Stage Fracture | 2239.30 | 2239.40 | 0 |
| 2012-12-01 | Multi-Stage Fracture | 2177.70 | 2177.80 | 0 |
| 2012-11-29 | Multi-Stage Fracture | 3407.30 | 3407.40 | 0 |
| 2012-11-29 | Multi-Stage Fracture | 3333.60 | 3333.70 | 0 |
| 2012-11-29 | Multi-Stage Fracture | 3271.70 | 3271.80 | 0 |
| 2012-11-29 | Multi-Stage Fracture | 3194.70 | 3194.80 | 0 |
| 2012-11-29 | Multi-Stage Fracture | 3132.60 | 3132.70 | 0 |
| 2012-11-29 | Multi-Stage Fracture | 3057.70 | 3057.80 | 0 |
| 2012-11-30 | Multi-Stage Fracture | 2995.70 | 2995.80 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 288 | 0.0 | 0.0 | 0.0 |
| 2013 | 8709 | 0.0 | 0.0 | 0.0 |
| 2014 | 8697 | 0.0 | 0.0 | 0.0 |
| 2015 | 8483 | 0.0 | 0.0 | 0.0 |
| 2016 | 8574 | 0.0 | 0.0 | 0.0 |
| 2017 | 8711 | 0.0 | 0.0 | 0.0 |
| 2018 | 8047 | 0.0 | 0.0 | 0.0 |
| 2019 | 8700 | 0.0 | 0.0 | 0.0 |
| 2020 | 2148 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-17 | No Incident Encountered | 0.00 | 0.00 |
| 2012-12-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]